# Aligned CMH-02 Conesville Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/aligned-cmh-02-conesville-data-center-campus--grid-load-e2ffa363211156fa

Aligned's CMH-02 is a multi-building data center campus on a 197-acre parcel at the Conesville Industrial Park in Coshocton County, Ohio, next to the former AEP Conesville Power Plant. It is under construction, with four buildings planned and the first expected to be active by the end of 2026. The campus is to tie into the existing American Electric Power substation at the industrial park. The industrial park's service option lists 340 MW, and the Port Authority describes the final buildout as 340 MW. Aligned says its closed-loop cooling needs little water.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 47201 County Rd 273, Conesville, Coshocton County, OH
- Developer: Aligned Data Centers (exact asset)
- Operator: Aligned Data Centers (exact asset)
- Owner: Aligned Data Centers (Conesville) Propco LLC (exact asset)

## Power and grid context

- Reported unspecified: 340 MW · proposed · exact asset — Final buildout capacity stated by the Coshocton County Port Authority; electrical basis not stated
- Reported unspecified: 384 MW · reported · exact asset — Four-unit campus listing in an analyst report; basis not stated
- ISO/RTO: PJM
- Electric utility: American Electric Power
- Substation: Existing American Electric Power substation in the industrial park, which the campus is to tie into

## Development

- Construction: Four buildings planned, two of them enclosed and the steelwork on the third nearly complete

## Sources

- [Access Restricted](https://www.daily-jeff.com/story/news/local/coshocton-county/2026/10/30/data-center-developer-touts-transparency-and-local-engagement/92349269007/)
- [Appalachian Ohio a target for data centers - Athens County Independent](https://athensindependent.com/data-centers-across-appalachian-ohio/)
- [https://blog.synmax.com/hubfs/PJM%202026%20Vulcan%20Summer%20Analysis%20(4).pdf](https://blog.synmax.com/hubfs/PJM%202026%20Vulcan%20Summer%20Analysis%20(4).pdf)
- [Access Restricted](https://www.coshoctontribune.com/story/news/local/coshocton-county/2025/10/02/aligned-data-centers-builds-new-facility-in-conesville-industrial-park/86333676007/)
- [Advancing Ohio&#039;s Digital Future - Aligned Data Centers](https://aligneddc.com/coshocton-county-oh-data-center)
- [Scalable and Adaptive Data Centers in Northeast Ohio | Aligned](https://aligneddc.com/northeast-ohio-data-centers/)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=47201+County+Rd+273%2C+Conesville%2C+OH&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=47201+County+Rd+273%2C+Conesville%2C+OH&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Utility Infrastructure &#8211; Conesville Industrial Park](https://conesvilleindustrialpark.com/utilities/)
- [https://frontier-companies.com/property/cip-parcel-c/?pdf=4894](https://frontier-companies.com/property/cip-parcel-c/?pdf=4894)
- [https://aligneddc.com/wp-content/uploads/2026/06/Aligned_Community-FAQs_Coshocton-County.pdf](https://aligneddc.com/wp-content/uploads/2026/06/Aligned_Community-FAQs_Coshocton-County.pdf)
- [Aligned Data Centers Expands in Ohio with New Mega-Scale AI Campus - Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/)
- [Just a moment...](https://fliphtml5.com/zjng/xluu/The_Coshocton_County_Beacon_20250828/)

---

Canonical page: https://askthegrid.com/assets/facilities/aligned-cmh-02-conesville-data-center-campus--grid-load-e2ffa363211156fa
Profile generated: 2026-11-02T18:54:53.065962Z
Source: Ask the Grid — https://askthegrid.com/