# Alta Wind Energy Center V

CAISO Onshore Wind Turbine · https://askthegrid.com/assets/facilities/alta-wind-energy-center-v

Alta Wind Energy Center V is a wind power facility with 168 MW of EIA-reported operating capacity in Kern County, California, registered as EIA Plant ID 57294. Clearway Energy LLC is the public owner or developer; Alta Wind V, LLC is the registered plant entity or operator. The facility interconnects at Windhub Substation at 220 kV.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 168 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO (CAISO)
- Substation: Windhub Substation
- Point of interconnection: Windhub Substation
- Transmission owner: Southern California Edison Company
- Interconnection voltage: 220 kV

## Source-backed facts

- Owner logo domain: clearwayenergygroup.com — Wind farms and wind energy benefits in the US - Clearway · confidence: medium
- Identifiers: [{"value":"57294","system":"EIA plant ID"},{"value":"AW05","system":"EIA generator ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO market"},{"value":"10-47-000","system":"FERC exempt wholesale generator docket"},{"value":"49167","system":"FERC MBR EIA record ID"},{"value":"CPC East Project","system":"CAISO interconnection project"},{"value":"ER10-2122-000","system":"FERC LGIA docket"}] — MBR | Index · confidence: medium
- Description: Alta Wind Energy Center V is an operational 168 MW onshore wind plant in Kern County, California. EIA plant 57294 contains one operational generator, AW05, with 168 MW of nameplate, summer, and winter capacity; the unit entered service in April 2011. The plant is operated by Alta Wind V, LLC and participates in the CAISO market. Clearway’s portfolio disclosure lists Alta V as a 168 MW project with a Southern California Edison power-purchase agreement extending through 2035. — Alta Wind Energy Center (AWEC), California - Power Technology · confidence: medium
- Description: Alta Wind Energy Center V is an operational 168 MW onshore wind plant in Kern County, California. EIA plant 57294 contains one operational generator, AW05, with 168 MW of nameplate, summer, and winter capacity; the unit entered service in April 2011. The plant is operated by Alta Wind V, LLC and participates in the CAISO market. Clearway’s portfolio disclosure lists Alta V as a 168 MW project with a Southern California Edison power-purchase agreement extending through 2035. — Source · confidence: medium
- Identifiers.5: {"value":"49167","system":"FERC MBR EIA record ID"} — MBR | Index · confidence: medium
- Parties.0: {"relationship":"Parent owner","name":"Clearway Energy LLC","official_url":"https://www.clearwayenergygroup.com/"} — Wind farms and wind energy benefits in the US - Clearway · confidence: medium
- Parties.4: {"relationship":"Transmission owner and PPA counterparty","name":"Southern California Edison Company","official_url":"https://www.sce.com/"} — Source · confidence: high
- Parties.7: {"relationship":"Wind turbine OEM","name":"Vestas","official_url":"https://www.vestas.com/"} — Alta Wind Energy Center (AWEC), California - Power Technology · confidence: medium
- Parties.7: {"relationship":"Wind turbine OEM","name":"Vestas","official_url":"https://www.vestas.com/"} — Power plant profile: Alta Wind Project, US · confidence: medium
- Parties.8: {"relationship":"Financier","name":"Google","official_url":"https://about.google/"} — Citi, Google to invest more in Terra-Gen Power's Alta Wind Energy Center · confidence: high
- Parties.9: {"relationship":"Financier","name":"Citibank","official_url":"https://www.citigroup.com/"} — Citi, Google to invest more in Terra-Gen Power's Alta Wind Energy Center · confidence: high
- Commercial operation date: 2011-04-01 — Clearway Energy LLC · confidence: medium
- Product url: https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf — 1 · confidence: high
- Significance: Alta Wind Energy Center V was one of the facilities included in NRG Yield’s August 2014 acquisition of the 947 MW Alta Wind facility, described at closing as North America’s largest wind facility. — NRG Yield seals Alta Wind deal · confidence: medium
- Quality notes: ["The $870 million August 2014 consideration was for the 947 MW Alta portfolio and was not allocated specifically to Alta V.","The $1.2 billion July 2010 financing covered Alta Projects II-V in aggregate, totaling 570 MW; a plant-specific financing amount for Alta V was not disclosed.","The 2015 Clearway transaction was a broader portfolio drop-down involving 75% of NRG Wind TE Holdco for $209 million, not a disclosed standalone sale price for Alta V.","The cited EIA record continues to identify Alta V as one operational 168 MW generator; no separate expansion, retirement, or repowering milestone is documented in the cited history."] — NRG Yield LLC - Clearway Energy, Inc. · confidence: medium
- Financing summary: Alta Projects II-V closed approximately $1.2 billion of construction financing in July 2010 for 570 MW in aggregate. The package included approximately $580 million of pass-through certificates due 2035, a $499 million construction bridge loan, and $127 million of ancillary credit facilities. The permanent structure was a leveraged lease under which Citibank committed to purchase the projects at commercial operation and lease them back to Terra-Gen; Citibank, Barclays Capital, and Credit Suisse were identified as financing parties. Separately, on August 12, 2014, NRG Yield paid $870 million for the broader 947 MW Alta facility and assumed $1.6 billion of non-recourse project financings; that was portfolio acquisition consideration, not Alta V-specific project financing. — Alta Wind Energy Center (AWEC), California · confidence: medium
- Quality notes.0: The $870 million August 2014 consideration was for the 947 MW Alta portfolio and was not allocated specifically to Alta V. — NRG Yield seals Alta Wind deal · confidence: medium
- Quality notes.2: The 2015 Clearway transaction was a broader portfolio drop-down involving 75% of NRG Wind TE Holdco for $209 million, not a disclosed standalone sale price for Alta V. — NRG Yield LLC - Clearway Energy, Inc. · confidence: medium
- Timeline.3: {"event":"Portfolio acquisition","date":"2014-08-12","detail":"NRG Yield completed its acquisition of the Alta Wind facility from Terra-Gen for $870 million plus assumption of $1.6 billion of non-recourse project financings. The acquired 947 MW portfolio included Alta V."} — NRG Yield seals Alta Wind deal · confidence: high
- Timeline.4: {"event":"Clearway portfolio drop-down","date":"2015-11-03","detail":"Clearway acquired 75% of the Class B interests in NRG Wind TE Holdco from NRG for $209 million as part of a broader portfolio transaction; the disclosed consideration was not allocated to Alta V."} — NRG Yield LLC - Clearway Energy, Inc. · confidence: medium
- Commercial parties.0: {"relationship":"Parent owner","name":"Clearway Energy LLC","detail":"Parent owner associated with the Alta Wind portfolio; Clearway identifies the 947 MW Alta Wind facility in Kern County among its wind assets.","official_url":"https://www.clearwayenergygroup.com/"} — Wind farms and wind energy benefits in the US - Clearway · confidence: medium
- Commercial parties.3: {"relationship":"Acquirer","name":"NRG Yield, Inc.","detail":"Completed the August 12, 2014 acquisition of the 947 MW Alta Wind facility from Terra-Gen for $870 million plus assumed project financings; Alta V was included in the acquired portfolio.","official_url":null} — NRG Yield seals Alta Wind deal · confidence: high
- Commercial parties.4: {"relationship":"Power-purchase agreement counterparty","name":"Southern California Edison Company","detail":"Counterparty for Alta V’s power-purchase agreement, with the disclosed agreement expiration in 2035.","official_url":"https://www.sce.com/"} — Document · confidence: high
- Commercial parties.6: {"relationship":"Financing party and leveraged-lease lessor","name":"Citibank, N.A.","detail":"Committed to purchase Alta Projects II-V at commercial operation and lease them back to Terra-Gen under the leveraged-lease financing structure.","official_url":"https://www.citigroup.com/"} — Terra-Gen Power Announces Closing of $1.2 Billion Construction Financing and Wind Turbine Order - EnergyTrend · confidence: high
- Commercial parties.7: {"relationship":"Financing party","name":"Barclays Capital","detail":"Identified with Citibank and Credit Suisse as a financing party for the aggregate Alta Projects II-V financing.","official_url":"https://home.barclays/"} — Alta Wind Energy Center (AWEC), California · confidence: medium
- Commercial parties.8: {"relationship":"Financing party","name":"Credit Suisse","detail":"Identified with Citibank and Barclays Capital as a financing party for the aggregate Alta Projects II-V financing.","official_url":null} — Alta Wind Energy Center (AWEC), California · confidence: medium

## Timeline

- 2010-07 — Construction financing closed
  Terra-Gen closed approximately $1.2 billion of construction financing for Alta Projects II-V, a 570 MW aggregate group that included Alta V.
  Source: Terra-Gen Power Announces Closing of $1.2 Billion Construction Financing and Wind Turbine Order - EnergyTrend (https://www.energytrend.com/news/20100723-394.html)

## Sources

- [Wind farms and wind energy benefits in the US - Clearway](https://www.clearwayenergygroup.com/projects/wind-energy/) — clearwayenergygroup.com · tier other
- [Source](https://investor.clearwayenergy.com/static-files/9c49258b-bf7a-4a96-91fe-e20ea69a8e15) — investor.clearwayenergy.com · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=688) — mbrweb.ferc.gov · tier regulatory
- [Alta Wind Energy Center (AWEC), California](https://www.power-technology.com/projects/alta-wind-energy-center-awec-california/) — power-technology.com · tier other
- [Citi, Google to invest more in Terra-Gen Power's Alta Wind Energy Center](https://www.renewableenergyworld.com/wind-power/citi-google-to-invest-more-in-terra-gen-power-s-alta-wind-energy-center/) — renewableenergyworld.com · tier other
- [Power plant profile: Alta Wind Project, US](https://www.power-technology.com/marketdata/power-plant-profile-alta-wind-project-us/) — power-technology.com · tier other
- [1](https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf) — vestas.com · tier other
- [NRG Yield seals Alta Wind deal](https://www.rechargenews.com/wind/nrg-yield-seals-alta-wind-deal/1-1-864331) — rechargenews.com · tier other
- [Document](https://www.sec.gov/Archives/edgar/data/1637757/000163775720000003/clearwayllc201910-k.htm) — sec.gov · tier regulatory
- [Terra-Gen Power Announces Closing of $1.2 Billion Construction Financing and Wind Turbine Order - EnergyTrend](https://www.energytrend.com/news/20100723-394.html) — energytrend.com · tier other
- [NRG Yield LLC - Clearway Energy, Inc.](https://investor.clearwayenergy.com/static-files/b3c4cc16-2063-4dd0-bc7d-b2daa052f959) — investor.clearwayenergy.com · tier other
- [cwen-20241231](https://stocklight.com/stocks/us/nyse-cwen/clearway-energy/annual-reports/nyse-cwen-2025-10K-25658479.pdf) — stocklight.com · tier other

## Data quality

- The $870 million August 2014 consideration was for the 947 MW Alta portfolio and was not allocated specifically to Alta V. The $1.2 billion July 2010 financing covered Alta Projects II-V in aggregate, totaling 570 MW; a plant-specific financing amount for Alta V was not disclosed. The 2015 Clearway transaction was a broader portfolio drop-down involving 75% of NRG Wind TE Holdco for $209 million, not a disclosed standalone sale price for Alta V. The cited EIA record continues to identify Alta V as one operational 168 MW generator; no separate expansion, retirement, or repowering milestone is documented in the cited history.

---

Canonical page: https://askthegrid.com/assets/facilities/alta-wind-energy-center-v