# Altavista Solar

PJM asset profile · https://askthegrid.com/assets/facilities/altavista-solar

## Current generation inventory

EIA plant 64019 · Inventory reporting month: 2026-08.

- solar: 80 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -79.3475, 37.148199
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2025-12-23 01:49:11+00:00
- Map prepared: 2026-10-10T23:05:26.636756+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Altavista Solar is a 80 MW solar photovoltaic plant in Campbell County. Facebook agreed to buy power from a 61.6 MW portion of the project. DEPCOM Power engineered and constructed the plant, which spans about 720 acres.

## Reviewed metrics

- **Nameplate capacity:** 80 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 64019 — plant-64019

## Facts

- **Technology:** Solar Photovoltaic
- **Operator:** Altavista Solar, LLC

## Related parties

- **EPC contractor:** DEPCOM Power — EPC contractor
- **Offtaker:** Facebook — offtaker

## Sources

- [ippjournal.com](https://ippjournal.com/update/depcom-launches-construction-of-113-mw-altavista-solar-project-in-campbell-county) — ippjournal.com · public_source — Source retained for exact-record publication review.
- [apexcleanenergy.com](https://www.apexcleanenergy.com/news/facebook-to-purchase-renewable-power-from-apexs-altavista-solar-project/) — apexcleanenergy.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/altavista-solar

Source: Ask the Grid — https://askthegrid.com/