# Amadeus Wind Farm

ERCOT asset profile · https://askthegrid.com/assets/facilities/amadeus-wind-farm

Fengate and BayWa r.e. · Fisher County · ERCOT

Amadeus Wind Farm is a 250 MW wind facility in Fisher County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62142, with service beginning in December 2020 and Amadeus Wind LLC as the registered operator. BayWa r.e. developed the project and remains minority owner and asset manager; Fengate acquired a majority interest. The facility uses 96 GE turbines rated at 2.7 MW each.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT.
- **Equipment:** 96 GE onshore wind turbines rated at 2.7 MW each.
- **Ownership and management:** Fengate majority owner · BayWa r.e. minority owner and asset manager.

## Metrics

- **Operating capacity:** 250 MW — EIA May 2026
- **Turbines:** 96 — GE · 2.7 MW
- **Operating month:** Dec 2020 — EIA
- **Settlement point:** AMADEUS_ALL — ERCOT settlement point.
- **Registry anchor:** Plant 62142 — Amadeus Wind LLC

## Facts

- **Operating capacity:** 250 MW — EIA May 2026 · confidence: high
- **Equipment:** 96 GE 2.7 MW turbines — BayWa r.e. · confidence: high
- **Majority owner:** Fengate — Official transaction record · confidence: high
- **Minority owner and manager:** BayWa r.e. — Official transaction record · confidence: high

## Related parties

- **Project company and EIA registered operator:** Amadeus Wind LLC — EIA May 2026 generator inventory
- **Majority owner:** Fengate Asset Management — Fengate Amadeus investment ([source](https://fengate.com/))
- **Developer minority owner and asset manager:** BayWa r.e. — Fengate Amadeus investment ([source](https://us.baywa-re.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [BayWa r.e. Amadeus project page](https://us.baywa-re.com/en/projects/ipp-projects/amadeus) — BayWa r.e. · official — Capacity equipment site area and operating context.
- [Fengate Amadeus investment](https://fengate.com/news/fengate-announces-structured-equity-investment-in-250-megawatt-wind-project) — Fengate Asset Management · official — Majority ownership BayWa role GE service and commercial structure.

---

Canonical page: https://askthegrid.com/assets/facilities/amadeus-wind-farm
Website: [BayWa r.e.](https://us.baywa-re.com/en/projects/ipp-projects/amadeus)
Profile published: 2026-07-17T03:33:58.448Z
Source: Ask the Grid — https://askthegrid.com/