# Amazon AWS IAD-100

PJM data center · https://askthegrid.com/assets/facilities/amazon-aws-iad-100

Amazon AWS IAD-100 is an operating Amazon Web Services data-center building at 10321 Tanner Way in Manassas, Virginia, within PJM. Prince William County's Build Out Analysis records the building as completed with 212,017 square feet of gross floor area; that figure describes building area, not IT load. This profile keeps exact-building evidence separate from AWS campus and portfolio context and does not infer facility demand, a serving substation, or an interconnection point.

## Identity and location

- Operating status: operating
- Asset scope: building
- Location: 10321 Tanner Way, Manassas, Prince William County, VA
- Operator: Amazon Web Services (exact asset)

## Power and grid context

- ISO/RTO: PJM Interconnection, LLC
- Balancing authority: PJM Interconnection, LLC
- Electric utility: Dominion Energy Virginia
- Substation: An unnamed 192 MW substation serving Amazon’s Tanner Way Campus is reported; no substation name or IAD-100-specific point of interconnection is identified.

## Development

- Site status: Operating; county building status is Completed and the associated building permit is Finaled.
- Gross floor area: 212,017 square feet
- Buildings: 1
- Construction: Amazon AWS IAD-100 is a completed, operating data-center building at 10321 Tanner Way. The county record identifies year built 2021, building permit BLD2020-00115 with status Finaled, 212,017 square feet of gross floor area, and an occupancy date of 2021-10-14. A Virginia DEQ permit authorized emergency generator sets at IAD-100; it was approved February 21, 2018 and amended June 28, 2021. No exact construction-start date, scheduled building-completion date, or separate commercial-operation date was identified.

## Compute and operations

- Facility classes: cloud
- Workloads: cloud computing
- Operating context: Operating Amazon Web Services facility in the AWS US East (N. Virginia) region; the exact-site profile describes it as purpose-built and sole-tenant.

## Sources

- [http://aws.amazon.com/sustainability/data-centers](http://aws.amazon.com/sustainability/data-centers)
- [Prince William residents complain of "catastrophic noise" from data centers - DCD](http://datacenterdynamics.com/en/news/prince-william-residents-complain-of-catastrophic-noise-from-data-centers) — Data Center Dynamics · 2022-07-19
- [http://datacentermap.com/usa/virginia/manassas/amazon-aws-iad-10301-tanner](http://datacentermap.com/usa/virginia/manassas/amazon-aws-iad-10301-tanner)
- [Amazon AWS IAD - 10321 Tanner - Specs](http://datacentermap.com/usa/virginia/manassas/amazon-aws-iad-10321-tanner/specs)
- [deq.virginia.gov](http://deq.virginia.gov/home/showpublisheddocument/25843/638628762496730000)
- [http://eia.gov/electricity/gridmonitor/dashboard/electric_overview/balancing_authority/PJM](http://eia.gov/electricity/gridmonitor/dashboard/electric_overview/balancing_authority/PJM)
- [Manassas residents protest over noise pollution from Amazon data center | FOX 5 DC](http://fox5dc.com/news/manassas-residents-protest-over-noise-pollution-from-amazon-data-center) — FOX 5 DC · 2022-08-29
- [Build Out Analysis](http://gisweb.pwcva.gov/arcgis/rest/services/Planning/Build_Out_Analysis/MapServer/9/query?f=pjson&outFields=*&returnGeometry=true&where=BuildingName LIKE '%IAD-100%')
- [http://mlq.ai/permit-filings/usa/virginia/prince-william-county/bld2020-00115](http://mlq.ai/permit-filings/usa/virginia/prince-william-county/bld2020-00115)
- [http://openstreetmap.org/way/996899488](http://openstreetmap.org/way/996899488)
- [http://pjm.com/about-pjm](http://pjm.com/about-pjm)
- [Coming crack down on data center noise won't help Great Oak | News | princewilliamtimes.com](http://princewilliamtimes.com/news/coming-crackdown-on-data-center-noise-likely-wont-bring-relief-to-a-community-most-affected/article_5307ae6c-fac1-11ef-89ef-13f721478913.html)
- [Residents turn up the volume on data center noise complaints | News | princewilliamtimes.com](http://princewilliamtimes.com/news/residents-turn-up-the-volume-on-data-center-noise-complaints/article_08a1c042-293b-11ed-8f1c-07644ca3f58b.html) — Prince William Times · 2022-08-31
- [Our Water | Prince William Water](http://princewilliamwater.org/our-water)
- [DPA2023-00019: Data Center Ordinance Advisory Group](http://pwcva.gov/department/planning-office/data-center-ordinance-advisory-group)
- [AWS Cloud - Amazon Sustainability](http://sustainability.aboutamazon.com/products-services/aws-cloud)
- [Amazon purchases $65M data center site in Manassas](http://virginiabusiness.com/amazon-purchases-65m-data-center-site-in-manassas)
- [AWS IAD 100 Data Center](https://baxtel.com/data-center/aws-iad-100)
- [Amazon Tanner Way Campus — Manassas, VA | datacenter.fyi](https://datacenter.fyi/facility/amazon-tanner-way-campus-va-a171447e)
- [Emergency Procedures - Regions](https://emergencyprocedures.pjm.com/ep/pages/regions.jsf)
- [Layer: Data Center Buildings (ID: 9)](https://gisweb.pwcva.gov/arcgis/rest/services/Planning/Build_Out_Analysis/MapServer/9)
- [Build Out Analysis](https://gisweb.pwcva.gov/arcgis/rest/services/Planning/Build_Out_Analysis/MapServer/9/query?f=pjson&outFields=*&returnGeometry=false&where=BuildingID%3D%27IAD100%27)
- [Build Out Analysis](https://gisweb.pwcva.gov/arcgis/rest/services/Planning/Build_Out_Analysis/MapServer/9/query?f=pjson&outFields=*&returnGeometry=false&where=BuildingID='IAD100')
- [Build Out Analysis](https://gisweb.pwcva.gov/arcgis/rest/services/Planning/Build_Out_Analysis/MapServer/9/query?where=BuildingName%20LIKE%20%27%25IAD-100%25%27&outFields=*&returnGeometry=true&f=pjson)
- [Virginia Tax Exemptions for Data Centers – January 2, 2026](https://rga.lis.virginia.gov/Published/2026/RD40/PDF)
- [Prince William Co. protesters say noise from Amazon data center hurting quality of life – WTOP News](https://wtop.com/virginia/2022/08/prince-william-co-protesters-say-noise-from-amazon-data-center-hurting-quality-of-life/) — WTOP News · 2022-08-29
- [Amazon - Manassas, VA | datacenter.fyi](https://www.datacenter.fyi/public-record/196cb995)
- [Amazon Data Services, Inc. IAD-100 IAD-101 IAD-102 IAD-103 - Manassas, VA | datacenter.fyi](https://www.datacenter.fyi/public-record/amazon-data-services-inc-iad-100-iad-101-iad-102-i-ad1042ec)
- [Amazon AWS IAD - 10321 Tanner Data Center in Manassas](https://www.datacentermap.com/usa/virginia/manassas/amazon-aws-iad-10321-tanner/)
- [Amazon AWS Data Center in Manassas Virginia](https://www.datacenters.com/amazon-aws-iad100-manassas)
- [deq.virginia.gov](https://www.deq.virginia.gov/home/showpublisheddocument/25843/638628762496730000)
- [Prince William County backs noise study for Amazon data center | Headlines | insidenova.com](https://www.insidenova.com/headlines/prince-william-county-backs-noise-study-for-amazon-data-center/article_9a1b31ca-4b14-11ed-9981-6b4f709e3254.html) — InsideNoVa · 2022-10-13
- [Way: ‪Amazon IAD100‬ (‪996899488‬) | OpenStreetMap](https://www.openstreetmap.org/way/996899488)
- [Amazon tones down its data center noise after residents sound the alarm | News | princewilliamtimes.com](https://www.princewilliamtimes.com/news/amazon-tones-down-its-data-center-noise-after-residents-sound-the-alarm/article_b81154ea-5178-59cb-ac3b-82228a2a52cf.html) — Prince William Times · 2023-10-23
- [Manassas neighborhood battles noise from data centers | News | princewilliamtimes.com](https://www.princewilliamtimes.com/news/manassas-neighborhood-battles-noise-from-data-centers/article_84b9f0ea-1ef1-11ed-a8a1-9307028db1fd.html) — Prince William Times · 2022-08-18

## Data quality

- The exact asset is the completed county-recorded building Amazon AWS IAD-100 at 10321 Tanner Way, Manassas, Building ID IAD100, GPIN 7695-62-8723, with a finaled permit and 212,017 square feet of gross floor area.
- The local and trade reporting located concerns the broader Amazon Tanner Way campus or the group of Amazon buildings beside Great Oak, rather than naming IAD-100 by building ID. Those articles are therefore classified as campus-or-project-area evidence, not building-specific evidence.
- No supported evidence was located for building-specific jobs, tax payments, water use, power demand, PUE, WUE, tenants, equipment inventories, commercial terms, or a petition or lawsuit specific to IAD-100.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/amazon-aws-iad-100
Profile generated: 2026-09-04T01:22:58.416496Z
Source: Ask the Grid — https://askthegrid.com/
