# Amazon AWS Ridgeland Campus

MISO data center · https://askthegrid.com/assets/facilities/amazon-aws-ridgeland-campus

Amazon’s Ridgeland campus is under construction at 1626 County Line Road. Mississippi’s JAN200 air construction permit covers emergency generators serving several campus buildings.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 1626 County Line Road, Ridgeland, Madison County, MS
- Operator: Amazon Data Services Inc (exact asset)

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1626+County+Line+Road%2C+Ridgeland%2C+MS&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [GWB Realty, LLC - Joint Venture Opportunity, Madison County, Mississippi](https://gwbrealtyllc.com/)
- [https://opc.deq.state.ms.us/get_doc.aspx?dt=finalp&id=1791725](https://opc.deq.state.ms.us/get_doc.aspx?dt=finalp&id=1791725)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/amazon-aws-ridgeland-campus
Profile generated: 2026-10-15T15:52:57.722816Z
Source: Ask the Grid — https://askthegrid.com/