# Amazon IAD-55

PJM data center · https://askthegrid.com/assets/facilities/amazon-iad-55

Amazon IAD-55 is a building data center in Haymarket, VA. Amazon Web Services is identified as the operator. Spatial service-territory evidence associates the site with Dominion Energy Virginia; the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.

## Identity and location

- Operating status: unknown
- Asset scope: building
- Location: 15395 John Marshall Highway, Haymarket, VA
- Operator: Amazon Web Services (exact asset) — https://aws.amazon.com
- Utility: Dominion Virginia Power (exact asset) — https://www.dominionenergy.com

## Power and grid context

- Energized power: 50 MW · reported · building — Commercial directory listing reporting 50.0 MW building-level power capacity at 15395 John Marshall Hwy (Haymarket) for Amazon IAD-55
- Energized power: 223.5 MW · reported · building — Public record listing that groups IAD-55 with nearby IAD sites and reports 223.5 MW in that combined record
- ISO/RTO: PJM
- Balancing authority: PJM Interconnection
- Electric utility: Dominion Energy Virginia
- Queue IDs: no discrete Dominion/PJM queue identifier located in consulted records

## Development

- Site status: operational
- Gross floor area: 236,082 square feet
- Construction: Operational Amazon Web Services data center at 15395 John Marshall Highway (IAD-55). Reported as operational on Apr 25, 2023, connected to the Dominion Energy Virginia grid, reported power capacity ~223.5 MW and a reported facility area of roughly 236,082 sq ft. No public primary-source permit schedule or land-transaction record for this exact asset was found in the consulted sources.

## Compute and operations

- Facility classes: hyperscale, cloud
- Workloads: cloud services
- Operating context: Operational Amazon Web Services hyperscale cloud data center at 15395 John Marshall Hwy, Haymarket, VA (IAD-55). Public records list the site as operational (permit/registration date shown Apr 25, 2023) and list a power capacity entry; operator is Amazon Web Services. Public listings report facility square footage in the ~236k sqft range and list the site as part of AWS US East (N. Virginia).

## Sources

- [http://aboutamazon.com/news/aws/reducing-water-usage-in-aws-data-centers](http://aboutamazon.com/news/aws/reducing-water-usage-in-aws-data-centers)
- [http://dominionenergy.com/en/Virginia/Large-Business-Services/Data-Center-Requests](http://dominionenergy.com/en/Virginia/Large-Business-Services/Data-Center-Requests)
- [http://rga.lis.virginia.gov/Published/2026/RD40/PDF](http://rga.lis.virginia.gov/Published/2026/RD40/PDF)
- [http://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement](http://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement)
- [http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5040881,38.7369848&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1](http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5040881,38.7369848&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1)
- [http://sustainability.aboutamazon.com/products-services/aws-cloud](http://sustainability.aboutamazon.com/products-services/aws-cloud)
- [Amazon IAD-55 Data Center](https://baxtel.com/data-center/amazon-iad-55)
- [Amazon data center protests fail to stop development getting green light](https://baxtel.com/news/amazon-data-center-protests-fail-to-stop-development-getting-green-light) — Baxtel News · 2023-02-24
- [AWS Amazon IAD-55 — Haymarket, VA Data Center | PJM grid](https://dchub.cloud/facilities/aws-amazon-iad-55-ac259230)
- [Amazon AWS IAD55 Haymarket | gotcolo.com](https://gotcolo.com/data-center/amazon-aws-iad55-haymarket/)
- [Project Report Card | GridWatcher](https://gridwatcher.app/Project?id=6a8d39a3bd7c4a19e561af6b)
- [NO! to Data Centers next to Homes and National Parks! – The Coalition to Protect Prince William County](https://protectpwc.org/2021/03/12/no-to-data-centers-next-to-homes-and-in-national-parks/) — The Coalition to Protect Prince William County · 2021-03-12
- [COMMONWEALTH of VIRGINIA](https://s3.amazonaws.com/s3.documentcloud.org/documents/2077000/iad-55-jan-14.pdf)
- [Nova Power Systems | Haymarket](https://www.buildzoom.com/contractor/nova-power-systems-llc)
- [Amazon buys $700 million site in Virginia as data center ...](https://www.costar.com/article/419227157/amazon-buys-700-million-site-in-virginia-as-data-center-demand-surges)
- [Amazon Data Services, Inc. IAD-55 IAD-64 IAD-84](https://www.datacenter.fyi/public-record/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549)
- [Haymarket, Virginia Data Center Permits & Public Records](https://www.datacenter.fyi/state/va/haymarket)
- [Amazon pays $700m for planned data center site in Virginia’s Prince William County – report - DCD](https://www.datacenterdynamics.com/en/news/amazon-pays-700m-for-planned-data-center-site-in-virginias-prince-william-county-report/)
- [Amazon to expand number of data centers using recycled water to 120 - DCD](https://www.datacenterdynamics.com/en/news/amazon-to-expand-number-of-data-centers-using-recycled-water-to-120/)
- [Amazon AWS Data Center in Haymarket Virginia](https://www.datacenters.com/amazon-aws-iad55-haymarket)
- [Issued Air Permits for Data Centers | Virginia DEQ](https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers)
- [Way: ‪Amazon IAD-55‬ (‪222672860‬) | OpenStreetMap](https://www.openstreetmap.org/way/222672860)
- [Haymarket 230 kilovolt (kV) Transmission Line Project](https://www.power-viz.com/haymarket/)
- [Application, Appendix, DEQ Supplement, Direct Testimony ...](https://www.scc.virginia.gov/docketsearch/DOCS/35f@01!.PDF)

## Data quality

- Evidence limited to news and advocacy sources; no official impact studies found.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/amazon-iad-55
Profile generated: 2026-09-04T14:28:32.838652Z
Source: Ask the Grid — https://askthegrid.com/