# Amazon IAD11

PJM data center · https://askthegrid.com/assets/facilities/amazon-iad11

Amazon IAD11 is a building data center in Manassas, Prince William County, VA. Amazon Web Services is identified as the operator. Spatial service-territory evidence associates the site with Dominion Energy Virginia; the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.

## Identity and location

- Operating status: unknown
- Asset scope: building
- Location: 7510 Mason King Court, Manassas, Prince William County, VA
- Operator: Amazon Web Services (exact asset) — https://www.openstreetmap.org/way/45776978
- Owner: GI TC 7510 MASON KING CT LLC (Amazon) (exact asset) — https://www.datacenter.fyi/public-record/gi-tc-7510-mason-king-ct-llc-amazon-fd81413e?ref=interconnection.fyi&utm_source=interconnection.fyi&utm_medium=referral
- Utility: Dominion Energy (exact asset) — https://www.datacenter.fyi/public-record/gi-tc-7510-mason-king-ct-llc-amazon-fd81413e?ref=interconnection.fyi&utm_source=interconnection.fyi&utm_medium=referral
- Utility: Northern Virginia Electric Cooperative (exact asset)

## Power and grid context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection
- Electric utility: Dominion Energy Virginia

## Development

- Site status: permitted
- Site area: 140 acres
- Gross floor area: 125,000 square feet
- Construction: Amazon acquired roughly 140 acres in Manassas in January 2024 for $152 million. A permit for diesel emergency backup generators for the IAD11 data center at 7510 Mason King Court was issued (date not specified). The data center building has a total floor area of 125,000 sq ft. No construction start, completion, or operational dates are available.

## Compute and operations

- Facility classes: hyperscale, cloud, ai_hpc
- Workloads: cloud computing, object storage, networking, database services, analytics, AI, machine learning, HPC
- Critical IT load: 50 MW
- Operating context: Amazon AWS IAD – 7510 Mason (site code IAD11) is a purpose‑built hyperscale cloud data center strategically located on Mason King Court in Manassas, Prince William County, Virginia, within Northern Virginia's internationally recognized 'Data Center Alley,' the world's largest concentration of hyperscale digital. Serving as a core availability zone within the Amazon Web Services (AWS) US East (Northern Virginia / us-east-1) cloud region, the facility plays a vital role in delivering highly available, low‑latency cloud services for enterprises, government agencies, financial institutions, technology companies, and digital platforms. Engineered for high‑density server deployments, the facility provides cloud computing, object storage, networking, database services, analytics, artificial intelligence (AI), machine learning, and high‑performance computing (HPC) capabilities, enabling customers to deploy mission‑critical applications and GPU‑intensive workloads with exceptional performance and scalability.

## Sources

- [Reducing water usage in AWS data centers](http://aboutamazon.com/news/aws/reducing-water-usage-in-aws-data-centers)
- [http://baxtel.com/data-center/equinix-manassas-dc14](http://baxtel.com/data-center/equinix-manassas-dc14)
- [http://costar.com/article/419227157/amazon-buys-700-million-site-in-virginia-as-data-center-demand-surges](http://costar.com/article/419227157/amazon-buys-700-million-site-in-virginia-as-data-center-demand-surges)
- [Manassas residents protest over noise pollution from Amazon data center | FOX 5 DC](http://fox5dc.com/news/manassas-residents-protest-over-noise-pollution-from-amazon-data-center)
- [http://morethanjustparks.com/data-center-tracker/amazon-data-services-inc-iad-500-501-va--4cd17024-93d3-4217-9969-d410c3e9c4f8](http://morethanjustparks.com/data-center-tracker/amazon-data-services-inc-iad-500-501-va--4cd17024-93d3-4217-9969-d410c3e9c4f8)
- [http://openei.org/wiki/RAPID/BulkTransmission/Virginia](http://openei.org/wiki/RAPID/BulkTransmission/Virginia)
- [Data Center Noise Still Shakes Homes in Great Oak, County Slow to Act](http://potomaclocal.com/2025/06/11/data-center-noise-still-shakes-homes-in-great-oak-county-slow-to-act)
- [Virginia Tax Exemptions for Data Centers – January 2, 2026](http://rga.lis.virginia.gov/Published/2026/RD40/PDF)
- [http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5185240,38.7469789&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1](http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5185240,38.7469789&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1)
- [http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5949050,38.7780614&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1](http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5949050,38.7780614&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1)
- [AWS Cloud - Amazon Sustainability](http://sustainability.aboutamazon.com/products-services/aws-cloud)
- [Amazon IAD11 Data Center](https://baxtel.com/data-center/amazon-iad11)
- [Amazon IAD11 — Manassas, VA, US Data Center | PJM grid | DC Hub](https://dchub.cloud/facilities/amazon-web-services-amazon-iad11-3cbc1800)
- [AWS IAD 7510 Mason Data Center Manassas Virginia](https://dcpulse.com/project/aws-iad-7510-mason-data-center-manassas)
- [Virginia Tax Revenue Losses to Data Centers Soar to $1.6 ...](https://goodjobsfirst.org/virginia-tax-revenue-losses-to-data-centers-soar-to-1-6-billion-for-fy25/)
- [Amazon and Dominion Virginia Power Reach Breakthrough Renewable Energy Agreement - RMI](https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/)
- [Amazon data center arm buys 140 acres in Manassas for $152M - Washington Business Journal](https://www.bizjournals.com/washington/news/2024/01/24/amazon-data-centers-prince-william-manassas.html)
- [Amazon buys $700 million site in Virginia as data center ...](https://www.costar.com/article/419227157/amazon-buys-700-million-site-in-virginia-as-data-center-demand-surges)
- [GI TC 7510 MASON KING CT LLC (Amazon) - VA | datacenter.fyi](https://www.datacenter.fyi/public-record/gi-tc-7510-mason-king-ct-llc-amazon-fd81413e?ref=interconnection.fyi&utm_source=interconnection.fyi&utm_medium=referral)
- [Amazon AWS Data Center in Manassas Virginia](https://www.datacenters.com/amazon-aws-iad11-manassas)
- [IAD 7/11/24 Manassas | DocumentCloud](https://www.documentcloud.org/documents/2076996-iad-7-11-24-october-13/?mode=text)
- [Virginia's Data Center Tax Breaks Cost the State $1 Billion](https://www.governing.com/infrastructure/virginias-data-center-tax-breaks-cost-the-state-1-billion)
- [Way: ‪Amazon IAD11‬ (‪45776978‬) | OpenStreetMap](https://www.openstreetmap.org/way/45776978)

## Data quality

- No direct community benefit statements found; evidence limited to noise opposition articles.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---