# Amazon Northeast Creek Technology Campus

PJM data center · https://askthegrid.com/assets/facilities/amazon-northeast-creek-technology-campus--grid-load-25b93899235291b3

The Northeast Creek Technology Campus is an Amazon Web Services data center campus under construction on Jefferson Highway in Louisa County, Virginia, known to the county as the North Creek Technology Campus. The first phase has ten buildings and three substations, and local reporting puts its data center capacity at a minimum of 700 MW. Rappahannock Electric Cooperative is the county-identified electric provider. Construction began in about March 2025 and is scheduled to finish around 2031.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 2694 Jefferson Highway, Louisa, Louisa County, VA
- Operator: Amazon Data Services Inc. (exact asset)
- Developer: Amazon Data Services Inc. (exact asset)
- Owner: Amazon (campus)

## Power and grid context

- Reported unspecified: 700+ MW · proposed · phase — First phase of ten data centers; the basis (IT, gross or utility) is not stated
- Utility service: 900 MW · proposed · phase — Combined capability stated for the three first-phase substations
- Utility service: Up to 3,000 MW · proposed · campus — Potential supply ceiling under the ten-substation preliminary plan, stated by the cooperative as 300 MW per substation; not contracted or energized load
- ISO/RTO: PJM
- Electric utility: Rappahannock Electric Cooperative
- Substation: Three proposed campus substations

## Development

- Site area: 367.2 acres
- Buildings: 10

## Sources

- [Just a moment...](https://virginiamercury.com/2026/07/28/brown-water-dust-and-loud-noises-louisa-homeowner-sues-amazon-over-data-center-construction/)
- [Supes ok more money for turf fields; Election roundup; AWS plans 10 data centers for first phase of North Creek Tech Campus; Louisa Town Council appoints Carter as interim mayor; PC preview](https://tammypurcell.substack.com/p/supes-ok-more-money-for-turf-fields)
- [Supervisors approve AWS infrastructure project; Board appoints Painting to PC; Mineral TC votes to expel Hempstead; Louisa town manager resigns](https://tammypurcell.substack.com/p/supervisors-approve-aws-infrastructure)
- [Contractors Meet To Discuss Construction Plan At Lake Anna Technology Campus | Lake Anna Life](https://lakeannalife.com/amazon-planning-to-commence-work-at-lake-anna-technology-campus/)
- [Access Denied](https://www.nao.usace.army.mil/Media/Public-Notices/Article/3952905/nao-2024-01939-amazon-data-services-louisa-virginia/)
- [https://webapps.mrc.virginia.gov/public/habitat/getADD.php?id=262510](https://webapps.mrc.virginia.gov/public/habitat/getADD.php?id=262510)
- [www.louisacounty.gov](https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County)
- [Access Denied](https://www.deq.virginia.gov/news-info/shortcuts/controversial-permits/amazon-data-services-inc-louisa-county)
- [FAQs - CivicPlus.CMS.FAQ](https://www.louisacounty.gov/Faq.aspx?QID=280)
- [Access Denied](https://www.deq.virginia.gov/home/showpublisheddocument/38978/639250810715670000)
- [https://valawyersweekly.com/files/2026/07/VAUSWD026-3-290-Newsom.pdf](https://valawyersweekly.com/files/2026/07/VAUSWD026-3-290-Newsom.pdf)

---

Canonical page: https://askthegrid.com/assets/facilities/amazon-northeast-creek-technology-campus--grid-load-25b93899235291b3
Profile generated: 2026-11-02T19:00:13.757864Z
Source: Ask the Grid — https://askthegrid.com/