# Amazon Pecos County Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/amazon-pecos-county-data-center-campus--grid-load-f42126f91f4acbce

The Amazon Pecos County Data Center Campus is a data center campus near Fort Stockton in Pecos County, Texas, where construction was observed in September 2026. Amazon Data Services, Inc. is the owner named in three state building registrations at 6000 TX-18, each for a building of 189,060 square feet. Power is to come from on-site generation, the GW Ranch Energy Center developed by Pacifico Energy, which is permitted for 5,000 MW nominal output. Amazon says the campus is designed to move to grid-connected service as interconnection timelines allow.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 6000 TX-18, Fort Stockton, Pecos County, TX
- Owner: Amazon Data Services, Inc. (exact asset)
- Operator: Amazon (exact asset)
- Developer: Pacifico Energy (exact asset)

## Power and grid context

- Onsite generation: 5,000 MW · approved · campus — Dedicated power supply: Nominal output of the permitted on-site gas power plant
- Onsite generation: Up to 7,650 MW · approved · campus — Dedicated power supply: Gas generation covered by the air permit, per the developer
- Onsite generation: 1,000 MW · target · target 2028 · campus — Dedicated power supply: Developer target for power online from the on-site complex
- Onsite generation: 5,000+ MW · target · target 2031 · campus — Dedicated power supply: Developer target for full build-out of the on-site complex
- Onsite generation: 1,000 MW · planned · campus — Dedicated power supply: Phase 1 gross capacity of the on-site complex
- Battery storage: 1,800 MW · proposed · campus — Dedicated power supply: Battery storage integrated with the on-site generation
- Onsite generation: Up to 750 MW · proposed · campus — Dedicated power supply: Solar integrated with the on-site generation, rated in MWac
- ISO/RTO: ERCOT
- Point of interconnection: Initial private power system is isolated from the local utility distribution system; Amazon describes a possible later move to grid-connected service

## Compute and operations

- Facility classes: hyperscale

## Sources

- [At MASSIVE New West Texas AI Data Center, We Observed An Active Construction Zone This Week [Notes from the Road] &#8211; Infill Thinking](https://www.infillthinking.com/infill-thoughts/at-massive-new-west-texas-ai-data-center-we-observed-an-active-construction-zone-this-week-notes-from-the-road/)
- [https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_APD_SEARCH_GET_FILE&SearchID=15228583&searchType=External&xAPDParent=8069891](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_APD_SEARCH_GET_FILE&SearchID=15228583&searchType=External&xAPDParent=8069891)
- [www.pacificoenergy.com](https://www.pacificoenergy.com/gw-ranch)
- [www.pacificoenergy.com](https://www.pacificoenergy.com/post/pacifico-energy-secures-7-65-gw-power-generation-permit-for-gw-ranch-project)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026026954)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026026955)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026026959)
- [Page Not Found - Texas Commission on Environmental Quality](https://www2.tceq.texas.gov/airperm/index.cfm?fuseaction=airpermits.project_report&proj_id=396366)
- [Amazon&#x27;s planned data center campus in Pecos County, Texas: Read Amazon’s statement](https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs)
- [Commissioner’s Court Regular Session Agenda 6/22/2026 &#8211; Pecos County](https://www.co.pecos.tx.us/commissioners-court-regular-session-agenda-6222026/)
- [https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&SearchID=15228583&dID=9305207&searchType=External](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&SearchID=15228583&dID=9305207&searchType=External)
- [https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026_01_21_GW_Ranch_Energy_Center_181033__PSDTX167_f6c9943f.pdf](https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026_01_21_GW_Ranch_Energy_Center_181033__PSDTX167_f6c9943f.pdf)
- [https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026_01_21_GW_Ranch_Energy_Center_181033__PSDTX167_ad2421d4.pdf](https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026_01_21_GW_Ranch_Energy_Center_181033__PSDTX167_ad2421d4.pdf)

---