# Amazon PIT100 Data Center Campus at Homer City Energy Campus

PJM data center · https://askthegrid.com/assets/facilities/amazon-pit100-data-center-campus-at-homer-city-energy-campus--grid-load-22efde0f360d97d4

Amazon Data Services, Inc. has filed a preliminary land development plan for a data center campus of 39 buildings on about 2,200 acres in Center and Blacklick Townships, Indiana County, Pennsylvania, at the Homer City Energy Campus. The county accepted the plan for review on October 14, 2026, and it is not yet approved. Power is to come from FirstEnergy, supported by a natural gas plant that Homer City Redevelopment is building on the former coal station. Construction is anticipated to begin in December 2026 and full build-out in 2036.

## Identity and location

- Operating status: proposed
- Asset scope: campus
- Location: 1750 Powerplant Rd., Homer City, Indiana County, PA
- Developer: Amazon Data Services, Inc. (exact asset)
- Operator: Amazon Web Services (exact asset)
- Developer: Homer City Redevelopment, LLC (exact asset)

## Power and grid context

- Reported unspecified: About 3,700 MW · reported · exact asset — Share of the initial plant output the plant's CEO describes as going to data centers
- Campus gross power: 4,400 MW · proposed · exact asset — State Consumer Advocate characterization of the planned campus
- Onsite generation: 4,500 MW · under_construction · campus — Dedicated power supply: Natural gas generation facility that supports the campus supply from FirstEnergy
- Onsite generation: Up to 4,400 MW · approved · campus — Dedicated power supply: Approved generation facility serving multiple large data center customers and the local grid
- Onsite generation: 4,678 MW · approved · campus — Dedicated power supply: Electrical output stated in the state air permit review of the generation project
- ISO/RTO: PJM
- Electric utility: FirstEnergy
- Point of interconnection: Gas Insulated Switchgear building housing the high-voltage equipment that connects the energy campus to the PJM grid

## Development

- Site status: Preliminary land development plan accepted for county review on October 14, 2026
- Buildings: 39
- Construction: Two-story data center buildings of about 225,000 square feet each, about 70 feet high

## Sources

- [Homer City Generation Site Redevelopment | Department of Environmental Protection | Commonwealth of Pennsylvania](https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment)
- [Indiana County, Pa., Planners Accept AWS Plan for 39-Data-Center Homer City Campus for 90-Day Review](https://datacenterfeed.com/article/aws-homer-city-pit100-indiana-county-planning-commission-review-october-2026)
- [https://media-cdn.socastsrm.com/wordpress/wp-content/blogs.dir/2140/files/2026/09/pit100-project-narrative-082726.pdf](https://media-cdn.socastsrm.com/wordpress/wp-content/blogs.dir/2140/files/2026/09/pit100-project-narrative-082726.pdf)
- [Just a moment...](https://www.axios.com/local/pittsburgh/2026/03/31/homer-city-power-plant-grid-data-centers-pennsylvania)
- [www.puc.pa.gov](https://www.puc.pa.gov/pcdocs/1953337.pdf)
- [PRESS RELEASE: Homer City Generation Receives Air Quality Plan Approval from PA DEP](https://www.homercityredevelopment.com/post/press-release-homer-city-generation-receives-air-quality-plan-approval-from-pa-dep)
- [Project Overview | Homer City Redevelopment](https://www.homercityredevelopment.com/project-overview)
- [https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Final-AQ-Plan-Approval/Tech%20Review%20Memo%20Signed%2020251118.pdf](https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Final-AQ-Plan-Approval/Tech%20Review%20Memo%20Signed%2020251118.pdf)
- [https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/7-22-2025%20-%20Prevention_of_Significant_Deterioration_Application_Update.pdf](https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/7-22-2025%20-%20Prevention_of_Significant_Deterioration_Application_Update.pdf)
- [Homer City Redevelopment Crosses the First Steel Threshold](https://www.homercityredevelopment.com/post/homer-city-redevelopment-crosses-the-first-steel-threshold)
- [https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Request%20for%20Determination/RFD%20APPLICATION%20-%2032-00055%20Homer%20City%20Generation%20250121.pdf](https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Request%20for%20Determination/RFD%20APPLICATION%20-%2032-00055%20Homer%20City%20Generation%20250121.pdf)
- [Home](https://www.icopd.org/)
- [PRESS RELEASE: Homer City Redevelopment and Kiewit Announce Country’s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand](https://www.homercityredevelopment.com/post/former-homer-city-pa-coal-plant-officially-reopens-as-state-of-the-art-natural-gas-facility)

---

Canonical page: https://askthegrid.com/assets/facilities/amazon-pit100-data-center-campus-at-homer-city-energy-campus--grid-load-22efde0f360d97d4
Profile generated: 2026-11-02T21:36:20.054391Z
Source: Ask the Grid — https://askthegrid.com/