The Andover Energy Storage Project is a 20 MW / 20 MWh battery energy storage system located in Sussex County, New Jersey, providing ancillary services to PJM. The facility includes an 800 kVA transformer, 1000-amp and 1200-amp switchgear, BESS power conversion system (PCS) skids and enclosures, metering infrastructure, and associated electrical and communications equipment.

## Metrics

- **Nameplate capacity:** 20 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 65952 — plant-65952

## Facts

- **Technology:** Batteries
- **Operator:** VESI 25 LLC

## Related parties

- **EPC contractor / construction contractor:** Riggs Distler, a Centuri company — Turnkey construction contractor ([source](https://riggsdistler.com/projects/andover-bess-project/))

## Sources

- [riggsdistler.com](https://riggsdistler.com/projects/andover-bess-project/) — riggsdistler.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/andover-energy-storage-project
Website: [Ormat Technologies, Inc.](https://www.ormat.com/)

Source: Ask the Grid — https://askthegrid.com/