A 240 MW two-hour battery at the Tri-Corner 345 kV substation

Anole Energy Storage is a battery facility in Dallas County, Texas, registered as EIA Plant ID 67740 in ERCOT. esVolta reports 240 MW / 480 MWh of two-hour lithium-iron-phosphate storage operating since July 2025 on a 44-acre site in Seagoville.

## Profile

- **Site:** esVolta reports a 44-acre project site in Dallas County.

## Metrics

- **Storage:** 240 MW / 480 MWh — Two-hour owner/EIA basis.
- **Site:** 44 acres — esVolta exact-project basis.

## Facts

- **Developer / owner / operator:** esVolta
- **EPC:** Quanta Infrastructure Solutions Group

## Related parties

- **Developer / owner / operator:** esVolta — Official operations release ([source](https://www.esvolta.com/post/esvolta-brings-three-large-scale-storage-projects-on-line-in-texas-meeting-2025-summer-peak))
- **Inverter supplier:** Sungrow — Executed SGIA amendment ([source](https://interchange.puc.texas.gov/Documents/35077_1810_1391266.PDF))

## Sources

- [Anole SGIA amendment](https://interchange.puc.texas.gov/Documents/35077_1810_1391266.PDF) — PUCT / Oncor · authoritative — Exact inverter count/model and the capacity path to the 240 MW POI limit.

---

Canonical page: https://askthegrid.com/assets/facilities/anole-energy-storage

Source: Ask the Grid — https://askthegrid.com/