# Arlington Energy Center II

CAISO Batteries, Solar Photovoltaic · https://askthegrid.com/assets/facilities/arlington-energy-center-ii

Arlington Energy Center II is a hybrid solar and battery storage facility with 365 MW of EIA-reported total operating capacity and 528 MWh of reported storage energy capacity in Riverside County, California, registered as EIA Plant ID 64481. Arlington Energy Center II owns and operates the plant. Its grid role is co-located photovoltaic generation with battery storage; the battery component is registered as a New Non-Generation resource in CAISO.

## Key facts

- Technology: Batteries, Solar Photovoltaic
- Power capacity: 365 MW
- Energy capacity: 528 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: California Independent System Operator (CAISO)
- Substation: Colorado River Substation
- Point of interconnection: Colorado River Substation
- Transmission owner: Southern California Edison
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: nexteraenergyresources.com — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: medium
- Owner logo domain: nexteraenergyresources.com — Investor Relations – NextEra Energy, Inc. · confidence: medium
- Identifiers: [{"value":"64481","system":"EIA plant code"},{"value":"32565","system":"FERC MBR / EIA ID"},{"value":"AEC2B","system":"EIA generator ID"},{"value":"CAISO","system":"ISO/RTO market"},{"value":"Arlington Solar Unit 1A BESS","system":"CAISO resource"},{"value":"Arlington Solar Unit 2B","system":"CAISO resource"},{"value":"ER21-2294-000","system":"FERC docket"}] — Resource category and phase · confidence: medium
- Identifiers: [{"value":"64481","system":"EIA plant code"},{"value":"32565","system":"FERC MBR / EIA ID"},{"value":"AEC2B","system":"EIA generator ID"},{"value":"CAISO","system":"ISO/RTO market"},{"value":"Arlington Solar Unit 1A BESS","system":"CAISO resource"},{"value":"Arlington Solar Unit 2B","system":"CAISO resource"},{"value":"ER21-2294-000","system":"FERC docket"}] — Federal Register :: Arlington Energy Center II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization · confidence: medium
- Official project url: https://cleanpoweralliance.org/arlington-energy-center/ — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: high
- Owner name: Arlington Energy Center II, LLC — Federal Register :: Arlington Energy Center II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization · confidence: high
- Description: Arlington Energy Center II is an operating solar-and-battery power plant in Riverside County, California, near Blythe. EIA records identify plant code 64481 and three generating units totaling 365 MW; the project consists of approximately 233 MW of photovoltaic generation and 132 MW/528 MWh of battery storage. The facility connects to the Southern California Edison transmission system at the Colorado River substation. — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: high
- Parties: [{"relationship":"Project company / owner","name":"Arlington Energy Center II, LLC","official_url":null},{"relationship":"Owner / developer","name":"NextEra Energy Resources","official_url":"https://www.nexteraenergyresources.com/"},{"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","official_url":"https://cleanpoweralliance.org/"},{"relationship":"Participating transmission owner","name":"Southern California Edison","official_url":"https://www.sce.com/"},{"relationship":"Environmental compliance manager and monitor","name":"NV5","official_url":"https://www.nv5.com/"},{"relationship":"Land manager / lessor","name":"Bureau of Land Management","official_url":"https://www.blm.gov/"}] — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: medium
- Parties: [{"relationship":"Project company / owner","name":"Arlington Energy Center II, LLC","official_url":null},{"relationship":"Owner / developer","name":"NextEra Energy Resources","official_url":"https://www.nexteraenergyresources.com/"},{"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","official_url":"https://cleanpoweralliance.org/"},{"relationship":"Participating transmission owner","name":"Southern California Edison","official_url":"https://www.sce.com/"},{"relationship":"Environmental compliance manager and monitor","name":"NV5","official_url":"https://www.nv5.com/"},{"relationship":"Land manager / lessor","name":"Bureau of Land Management","official_url":"https://www.blm.gov/"}] — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Identifiers.2: {"value":"AEC2B","system":"EIA generator ID"} — EIA - MBR Portal - Federal Energy Regulatory Commission · confidence: high
- Identifiers.4: {"value":"Arlington Solar Unit 1A BESS","system":"CAISO resource"} — Resource category and phase · confidence: medium
- Identifiers.5: {"value":"Arlington Solar Unit 2B","system":"CAISO resource"} — Resource category and phase · confidence: medium
- Identifiers.6: {"value":"ER21-2294-000","system":"FERC docket"} — Federal Register :: Arlington Energy Center II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization · confidence: high
- Parties.1: {"relationship":"Owner / developer","name":"NextEra Energy Resources","official_url":"https://www.nexteraenergyresources.com/"} — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: medium
- Parties.3: {"relationship":"Participating transmission owner","name":"Southern California Edison","official_url":"https://www.sce.com/"} — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: high
- Parties.4: {"relationship":"Environmental compliance manager and monitor","name":"NV5","official_url":"https://www.nv5.com/"} — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: high
- Parties.5: {"relationship":"Land manager / lessor","name":"Bureau of Land Management","official_url":"https://www.blm.gov/"} — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: high
- Interconnection: Southern California Edison transmission system at the Colorado River substation — Source · confidence: high
- Site acres: 2500 — Source · confidence: medium
- Unit configuration: 233 MW solar photovoltaic generation coupled with 132 MW / 528 MWh battery storage — Source · confidence: high
- Commercial operation date: 2022-03-21 — Source · confidence: medium
- Duration hours: 4 — Source · confidence: medium
- Energy mwh: 528 — Source · confidence: high
- Construction scope: Arlington Energy Center II is documented as a 233 MW AC solar photovoltaic facility coupled with a 132 MW AC / 528 MWh lithium-ion battery storage facility, totaling approximately 365 MW. The source-backed physical scope includes PV modules, inverter stations, medium-voltage collection equipment, an onsite switchyard, a main step-up transformer increasing voltage to 230 kV, and interconnection to Southern California Edison’s Colorado River Substation. Exact installed counts for PV modules, inverter stations, battery units, and containers were not identified. — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Construction scope: Arlington Energy Center II is documented as a 233 MW AC solar photovoltaic facility coupled with a 132 MW AC / 528 MWh lithium-ion battery storage facility, totaling approximately 365 MW. The source-backed physical scope includes PV modules, inverter stations, medium-voltage collection equipment, an onsite switchyard, a main step-up transformer increasing voltage to 230 kV, and interconnection to Southern California Edison’s Colorado River Substation. Exact installed counts for PV modules, inverter stations, battery units, and containers were not identified. — Source · confidence: medium
- Kind: solar — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Construction scope: Arlington Energy Center II is documented as a 233 MW AC solar photovoltaic facility coupled with a 132 MW AC / 528 MWh lithium-ion battery storage facility, totaling approximately 365 MW. The source-backed physical scope includes PV modules, inverter stations, medium-voltage collection equipment, an onsite switchyard, a main step-up transformer increasing voltage to 230 kV, and interconnection to Southern California Edison’s Colorado River Substation. Exact installed counts for PV modules, inverter stations, battery units, and containers were not identified. — Source · confidence: medium
- Construction scope: Arlington Energy Center II is documented as a 233 MW AC solar photovoltaic facility coupled with a 132 MW AC / 528 MWh lithium-ion battery storage facility, totaling approximately 365 MW. The source-backed physical scope includes PV modules, inverter stations, medium-voltage collection equipment, an onsite switchyard, a main step-up transformer increasing voltage to 230 kV, and interconnection to Southern California Edison’s Colorado River Substation. Exact installed counts for PV modules, inverter stations, battery units, and containers were not identified. — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Kind: solar — Source · confidence: high
- Description: Arlington Energy Center II is an operating hybrid facility in Riverside County near Blythe, comprising 233 MW AC of photovoltaic generation and 132 MW/528 MWh of lithium-ion battery storage, or approximately 365 MW of nameplate capacity. The facility connects to Southern California Edison’s transmission system at the Colorado River substation. Arlington Energy Center II, LLC is the project company and PPA seller, while the Arlington Solar project was developed, owned, and operated through a NextEra Energy Resources subsidiary. Operations were staged: 100 MW of PV began serving Clean Power Alliance customers in March 2022, the 132 MW battery unit first operated in August 2022, and the additional 133 MW PV unit first operated in October 2023. — Source · confidence: medium
- Description: Arlington Energy Center II is an operating hybrid facility in Riverside County near Blythe, comprising 233 MW AC of photovoltaic generation and 132 MW/528 MWh of lithium-ion battery storage, or approximately 365 MW of nameplate capacity. The facility connects to Southern California Edison’s transmission system at the Colorado River substation. Arlington Energy Center II, LLC is the project company and PPA seller, while the Arlington Solar project was developed, owned, and operated through a NextEra Energy Resources subsidiary. Operations were staged: 100 MW of PV began serving Clean Power Alliance customers in March 2022, the 132 MW battery unit first operated in August 2022, and the additional 133 MW PV unit first operated in October 2023. — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Financing summary: No project-specific financing amount, lender, tax-equity investor, acquisition price, or sale consideration is disclosed. The amended PPA was effective July 10, 2020, defines Financial Close, permits tax-equity or portfolio financing, and includes a placeholder for financing arrangements with lenders. The PPA separately identifies NextEra Energy Capital Holdings, Inc. as a guarantor; that guarantee is not presented as a disclosed project-financing transaction. — Source · confidence: medium
- Timeline: [{"event":"BLM permitting","date":"2013-03","detail":"The Bureau of Land Management originally permitted the Arlington Solar project along with the McCoy Solar Project and a related land-use-plan amendment."},{"event":"PPA award and planned phased delivery","date":"2019-07","detail":"Clean Power Alliance announced a contract for 233 MW from the Arlington Solar project, to be owned and operated by a NextEra Energy Resources subsidiary, with planned delivery in two phases."},{"event":"Amended and restated PPA","date":"2020-07-10","detail":"The amended and restated Renewable Power Purchase Agreement between Arlington Energy Center II, LLC and Clean Power Alliance of Southern California became effective."},{"event":"Construction and financing milestones","date":null,"detail":"The public PPA identifies expected synchronization and commercial-operation milestones, but does not provide a completed construction-start date, financial-close amount, named lender, or named tax-equity investor."},{"event":"Initial solar operation and PPA commencement","date":"2022-03-21","detail":"The PPA commenced and the plant began providing 100 MW of photovoltaic energy to Clean Power Alliance customers in Los Angeles and Ventura counties."},{"event":"Battery operation","date":"2022-08","detail":"EIA-derived generator records show the 132 MW, 528 MWh battery unit first operated in August 2022."},{"event":"Final PV expansion unit operation","date":"2023-10","detail":"EIA-derived generator records show the additional 133 MW photovoltaic unit first operated in October 2023, completing the recorded 233 MW PV configuration."},{"event":"Acquisition, sale, and predecessor-owner history","date":null,"detail":"No specifically identified acquisition, sale, predecessor owner, transaction month/year, or transaction consideration was found for the exact Arlington Energy Center II plant. The public records instead identify Arlington Energy Center II, LLC as the project company and a NextEra Energy Resources subsidiary as owner/operator."}] — Clean energy project on BLM-managed public lands in California goes operational | Bureau of Land Management · confidence: medium
- Timeline: [{"event":"BLM permitting","date":"2013-03","detail":"The Bureau of Land Management originally permitted the Arlington Solar project along with the McCoy Solar Project and a related land-use-plan amendment."},{"event":"PPA award and planned phased delivery","date":"2019-07","detail":"Clean Power Alliance announced a contract for 233 MW from the Arlington Solar project, to be owned and operated by a NextEra Energy Resources subsidiary, with planned delivery in two phases."},{"event":"Amended and restated PPA","date":"2020-07-10","detail":"The amended and restated Renewable Power Purchase Agreement between Arlington Energy Center II, LLC and Clean Power Alliance of Southern California became effective."},{"event":"Construction and financing milestones","date":null,"detail":"The public PPA identifies expected synchronization and commercial-operation milestones, but does not provide a completed construction-start date, financial-close amount, named lender, or named tax-equity investor."},{"event":"Initial solar operation and PPA commencement","date":"2022-03-21","detail":"The PPA commenced and the plant began providing 100 MW of photovoltaic energy to Clean Power Alliance customers in Los Angeles and Ventura counties."},{"event":"Battery operation","date":"2022-08","detail":"EIA-derived generator records show the 132 MW, 528 MWh battery unit first operated in August 2022."},{"event":"Final PV expansion unit operation","date":"2023-10","detail":"EIA-derived generator records show the additional 133 MW photovoltaic unit first operated in October 2023, completing the recorded 233 MW PV configuration."},{"event":"Acquisition, sale, and predecessor-owner history","date":null,"detail":"No specifically identified acquisition, sale, predecessor owner, transaction month/year, or transaction consideration was found for the exact Arlington Energy Center II plant. The public records instead identify Arlington Energy Center II, LLC as the project company and a NextEra Energy Resources subsidiary as owner/operator."}] — CPA Signs Three Renewable Energy Power Purchase... · confidence: medium
- Timeline: [{"event":"BLM permitting","date":"2013-03","detail":"The Bureau of Land Management originally permitted the Arlington Solar project along with the McCoy Solar Project and a related land-use-plan amendment."},{"event":"PPA award and planned phased delivery","date":"2019-07","detail":"Clean Power Alliance announced a contract for 233 MW from the Arlington Solar project, to be owned and operated by a NextEra Energy Resources subsidiary, with planned delivery in two phases."},{"event":"Amended and restated PPA","date":"2020-07-10","detail":"The amended and restated Renewable Power Purchase Agreement between Arlington Energy Center II, LLC and Clean Power Alliance of Southern California became effective."},{"event":"Construction and financing milestones","date":null,"detail":"The public PPA identifies expected synchronization and commercial-operation milestones, but does not provide a completed construction-start date, financial-close amount, named lender, or named tax-equity investor."},{"event":"Initial solar operation and PPA commencement","date":"2022-03-21","detail":"The PPA commenced and the plant began providing 100 MW of photovoltaic energy to Clean Power Alliance customers in Los Angeles and Ventura counties."},{"event":"Battery operation","date":"2022-08","detail":"EIA-derived generator records show the 132 MW, 528 MWh battery unit first operated in August 2022."},{"event":"Final PV expansion unit operation","date":"2023-10","detail":"EIA-derived generator records show the additional 133 MW photovoltaic unit first operated in October 2023, completing the recorded 233 MW PV configuration."},{"event":"Acquisition, sale, and predecessor-owner history","date":null,"detail":"No specifically identified acquisition, sale, predecessor owner, transaction month/year, or transaction consideration was found for the exact Arlington Energy Center II plant. The public records instead identify Arlington Energy Center II, LLC as the project company and a NextEra Energy Resources subsidiary as owner/operator."}] — Source · confidence: medium
- Timeline: [{"event":"BLM permitting","date":"2013-03","detail":"The Bureau of Land Management originally permitted the Arlington Solar project along with the McCoy Solar Project and a related land-use-plan amendment."},{"event":"PPA award and planned phased delivery","date":"2019-07","detail":"Clean Power Alliance announced a contract for 233 MW from the Arlington Solar project, to be owned and operated by a NextEra Energy Resources subsidiary, with planned delivery in two phases."},{"event":"Amended and restated PPA","date":"2020-07-10","detail":"The amended and restated Renewable Power Purchase Agreement between Arlington Energy Center II, LLC and Clean Power Alliance of Southern California became effective."},{"event":"Construction and financing milestones","date":null,"detail":"The public PPA identifies expected synchronization and commercial-operation milestones, but does not provide a completed construction-start date, financial-close amount, named lender, or named tax-equity investor."},{"event":"Initial solar operation and PPA commencement","date":"2022-03-21","detail":"The PPA commenced and the plant began providing 100 MW of photovoltaic energy to Clean Power Alliance customers in Los Angeles and Ventura counties."},{"event":"Battery operation","date":"2022-08","detail":"EIA-derived generator records show the 132 MW, 528 MWh battery unit first operated in August 2022."},{"event":"Final PV expansion unit operation","date":"2023-10","detail":"EIA-derived generator records show the additional 133 MW photovoltaic unit first operated in October 2023, completing the recorded 233 MW PV configuration."},{"event":"Acquisition, sale, and predecessor-owner history","date":null,"detail":"No specifically identified acquisition, sale, predecessor owner, transaction month/year, or transaction consideration was found for the exact Arlington Energy Center II plant. The public records instead identify Arlington Energy Center II, LLC as the project company and a NextEra Energy Resources subsidiary as owner/operator."}] — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Commercial parties: [{"relationship":"Project company / PPA seller","name":"Arlington Energy Center II, LLC","detail":"Delaware project company named as the seller in the Arlington Energy Center II PPA. No standalone official corporate website was identified.","official_url":null},{"relationship":"Owner / developer / operator","name":"NextEra Energy Resources","detail":"The Arlington Solar project was described as being owned and operated by a NextEra Energy Resources subsidiary; industry project records identify NextEra Energy Resources as the owner and developer.","official_url":"https://www.nexteraenergyresources.com/"},{"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","detail":"PPA buyer and recipient of the initial 100 MW of photovoltaic energy, serving customers in Los Angeles and Ventura counties.","official_url":"https://cleanpoweralliance.org/"},{"relationship":"Transmission owner / point-of-interconnection host","name":"Southern California Edison","detail":"The facility delivers power to the SCE transmission system at the Colorado River substation.","official_url":"https://www.sce.com/"},{"relationship":"Land manager / lessor","name":"Bureau of Land Management","detail":"The project is located on BLM-managed public land, with project-service records describing approximately 2,500 acres leased from BLM.","official_url":"https://www.blm.gov/"},{"relationship":"Environmental compliance manager and monitor","name":"NV5","detail":"NV5 was selected by BLM to monitor environmental compliance and construction activities for the Arlington Solar Energy Center and BESS during the 2020–2022 project period.","official_url":"https://www.nv5.com/"},{"relationship":"PPA guarantor","name":"NextEra Energy Capital Holdings, Inc.","detail":"Named in the PPA as guarantor for specified project-company obligations; the public PPA does not disclose a separate financing amount associated with the guarantee.","official_url":"https://www.nexteraenergy.com/"}] — Source · confidence: medium
- Commercial parties: [{"relationship":"Project company / PPA seller","name":"Arlington Energy Center II, LLC","detail":"Delaware project company named as the seller in the Arlington Energy Center II PPA. No standalone official corporate website was identified.","official_url":null},{"relationship":"Owner / developer / operator","name":"NextEra Energy Resources","detail":"The Arlington Solar project was described as being owned and operated by a NextEra Energy Resources subsidiary; industry project records identify NextEra Energy Resources as the owner and developer.","official_url":"https://www.nexteraenergyresources.com/"},{"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","detail":"PPA buyer and recipient of the initial 100 MW of photovoltaic energy, serving customers in Los Angeles and Ventura counties.","official_url":"https://cleanpoweralliance.org/"},{"relationship":"Transmission owner / point-of-interconnection host","name":"Southern California Edison","detail":"The facility delivers power to the SCE transmission system at the Colorado River substation.","official_url":"https://www.sce.com/"},{"relationship":"Land manager / lessor","name":"Bureau of Land Management","detail":"The project is located on BLM-managed public land, with project-service records describing approximately 2,500 acres leased from BLM.","official_url":"https://www.blm.gov/"},{"relationship":"Environmental compliance manager and monitor","name":"NV5","detail":"NV5 was selected by BLM to monitor environmental compliance and construction activities for the Arlington Solar Energy Center and BESS during the 2020–2022 project period.","official_url":"https://www.nv5.com/"},{"relationship":"PPA guarantor","name":"NextEra Energy Capital Holdings, Inc.","detail":"Named in the PPA as guarantor for specified project-company obligations; the public PPA does not disclose a separate financing amount associated with the guarantee.","official_url":"https://www.nexteraenergy.com/"}] — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: medium
- Commercial parties: [{"relationship":"Project company / PPA seller","name":"Arlington Energy Center II, LLC","detail":"Delaware project company named as the seller in the Arlington Energy Center II PPA. No standalone official corporate website was identified.","official_url":null},{"relationship":"Owner / developer / operator","name":"NextEra Energy Resources","detail":"The Arlington Solar project was described as being owned and operated by a NextEra Energy Resources subsidiary; industry project records identify NextEra Energy Resources as the owner and developer.","official_url":"https://www.nexteraenergyresources.com/"},{"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","detail":"PPA buyer and recipient of the initial 100 MW of photovoltaic energy, serving customers in Los Angeles and Ventura counties.","official_url":"https://cleanpoweralliance.org/"},{"relationship":"Transmission owner / point-of-interconnection host","name":"Southern California Edison","detail":"The facility delivers power to the SCE transmission system at the Colorado River substation.","official_url":"https://www.sce.com/"},{"relationship":"Land manager / lessor","name":"Bureau of Land Management","detail":"The project is located on BLM-managed public land, with project-service records describing approximately 2,500 acres leased from BLM.","official_url":"https://www.blm.gov/"},{"relationship":"Environmental compliance manager and monitor","name":"NV5","detail":"NV5 was selected by BLM to monitor environmental compliance and construction activities for the Arlington Solar Energy Center and BESS during the 2020–2022 project period.","official_url":"https://www.nv5.com/"},{"relationship":"PPA guarantor","name":"NextEra Energy Capital Holdings, Inc.","detail":"Named in the PPA as guarantor for specified project-company obligations; the public PPA does not disclose a separate financing amount associated with the guarantee.","official_url":"https://www.nexteraenergy.com/"}] — Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5 · confidence: medium
- Quality notes.0: The exact-asset record is EIA plant 64481. Arlington Valley Solar Energy II is a separate, similarly named project and should not be merged with this facility. — Clean energy project on BLM-managed public lands in California goes operational | Bureau of Land Management · confidence: high
- Quality notes.1: Public descriptions vary: the PPA and EIA-derived plant record support 233 MW PV plus 132 MW/528 MWh storage, while some BLM and project-service pages cite 364 MW PV and different storage figures. This directory uses the exact plant-64481 configuration supported by the PPA and generator records. — Clean energy project on BLM-managed public lands in California goes operational | Bureau of Land Management · confidence: high
- Commercial parties.0: {"relationship":"Project company / PPA seller","name":"Arlington Energy Center II, LLC","detail":"Delaware project company named as the seller in the Arlington Energy Center II PPA. No standalone official corporate website was identified.","official_url":null} — Source · confidence: high
- Commercial parties.2: {"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","detail":"PPA buyer and recipient of the initial 100 MW of photovoltaic energy, serving customers in Los Angeles and Ventura counties.","official_url":"https://cleanpoweralliance.org/"} — Source · confidence: high
- Commercial parties.2: {"relationship":"Power purchaser / offtaker","name":"Clean Power Alliance of Southern California","detail":"PPA buyer and recipient of the initial 100 MW of photovoltaic energy, serving customers in Los Angeles and Ventura counties.","official_url":"https://cleanpoweralliance.org/"} — Arlington Energy Center II Contract Commencement | Clean Power Alliance · confidence: high

## Timeline

- 2013-03 — BLM permitting
  The Bureau of Land Management originally permitted the Arlington Solar project along with the McCoy Solar Project and a related land-use-plan amendment.
  Source: Clean energy project on BLM-managed public lands in California goes operational | Bureau of Land Management (https://www.blm.gov/press-release/clean-energy-project-blm-managed-public-lands-california-goes-operational)

## Sources

- [Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5](https://www.nv5.com/projects/arlington-solar-energy-center-and-bess-nextera-energy-resources/) — nv5.com · tier other
- [Investor Relations – NextEra Energy, Inc.](https://www.investor.nexteraenergy.com/) — investor.nexteraenergy.com · tier other
- [EIA - MBR Portal - Federal Energy Regulatory Commission](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=647) — mbrweb.ferc.gov · tier regulatory
- [Resource category and phase](https://www.caiso.com/documents/resourcecategoryandphaseallparticipatingresourceids.xlsx) — caiso.com · tier other
- [Federal Register :: Arlington Energy Center II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization](https://www.federalregister.gov/documents/2021/07/14/2021-14906/arlington-energy-center-ii-llc-supplemental-notice-that-initial-market-based-rate-filing-includes) — federalregister.gov · tier regulatory
- [Arlington Energy Center II Contract Commencement | Clean Power Alliance](https://cleanpoweralliance.org/arlington-energy-center/) — cleanpoweralliance.org · tier other
- [Source](https://files.cleanpoweralliance.org/uploads/2021/02/Arlington-II-PUBLIC.pdf) — files.cleanpoweralliance.org · tier other
- [Source](https://cleanpoweralliance.org/arlington-energy-center) — cleanpoweralliance.org · tier other
- [Source](https://nv5.com/projects/arlington-solar-energy-center-and-bess-nextera-energy-resources) — nv5.com · tier other
- [Arlington Solar Energy Center and BESS - Nextera Energy Resources - NV5](https://www.nv5.com/projects/arlington-solar-energy-center-and-bess-nextera-energy-resources) — nv5.com · tier other
- [NextEra Energy Resources](https://www.nexteraenergyresources.com/) — nexteraenergyresources.com · tier other
- [Arlington Energy Center Improves Grid Reliability and Now Providing Power to CPA Customers](https://cleanpoweralliance.org/arlington-energy-center-improves-grid-reliability-and-now-providing-power-to-cpa-customers/) — cleanpoweralliance.org · tier other
- [CPA Signs Three Renewable Energy Power Purchase ...](https://cleanpoweralliance.org/2020/11/05/clean-power-alliance-signs-three-new-renewable-energy-power-purchase-agreements/) — cleanpoweralliance.org · tier other
- [Clean energy project on BLM-managed public lands in California goes operational | Bureau of Land Management](https://www.blm.gov/press-release/clean-energy-project-blm-managed-public-lands-california-goes-operational) — blm.gov · tier regulatory
- [NextEra Energy Resources readies significant portfolio of California energy storage projects to enhance reliability and support the state's clean energy goals – NextEra Energy, Inc.](https://www.investor.nexteraenergy.com/news-and-events/news-releases/2020/08-31-2020-170028306) — investor.nexteraenergy.com · tier other
- [Source](https://psc.ky.gov/pscecf/2022-00131/brittany%40hloky.com/09052023024522/Sebree_Solar_II_-_Response_to_Siting_Board_Staff_PHDR_FINAL_Part2.pdf) — psc.ky.gov · tier regulatory
- [2026 NQC List](https://www.caiso.com/documents/net-qualifying-capacity-report-for-compliance-year-2026.xlsx) — caiso.com · tier other
- [2025 NQC List](https://www.caiso.com/documents/final-net-qualifying-capacity-report-for-compliance-year-2025.xlsx) — caiso.com · tier other

## Data quality

- The exact-asset record is EIA plant 64481. Arlington Valley Solar Energy II is a separate, similarly named project and should not be merged with this facility. This directory uses the exact plant-64481 configuration supported by the PPA and generator records. No project-specific debt amount, tax-equity investor, lender, acquisition price, sale consideration, predecessor owner, or repowering event was disclosed in the reviewed public materials. The PPA contains generic financing provisions and blank lender placeholders rather than completed financing terms.

---