# Astra Wind Farm

ERCOT asset profile · https://askthegrid.com/assets/facilities/astra-wind-farm

Falvez Energy · Randall County · ERCOT

Astra Wind Farm is an EIA-listed onshore wind turbine facility with 163.0 MW in Randall County, Texas, registered as EIA Plant ID 60856. Falvez Energy is the public owner or developer; Astra Wind LLC is the registered plant entity or operator.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.
- **Context:** Astra Wind Farm (EIA Plant ID 60856) is a 163 MW onshore wind plant.
- **Physical build:** Construction completed June 2017. Installed 68 GE 2.4-107 onshore wind turbines (68 × 2.4 MW = 163.2 MW). GE (GE Renewable Energy / GE Vernova) supplied the turbines and main transformer and was contracted to operate & maintain; TVI Group completed construction.
- **Financing:** Oct 21, 2016 — Marathon Capital announced the tax-equity close for the 163 MW Astra Wind Project: GE Energy Financial Services and BNP Paribas each provided 50% of the project tax equity; GE Energy Financial Services additionally funded the project's construction financing facility.

## Metrics

- **Reported capacity:** 163 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 60856 — Astra Wind LLC · Randall County · ERCOT
- **Operating status:** Operating — Astra Wind Farm is operating.
- **Resource stack:** 1 resource — ASTRA_UNIT1

## Facts

- **Reported capacity:** 163 MW — Onshore Wind Turbine · confidence: high
- **Operating status:** operating — Astra Wind Farm is operating. · confidence: medium
- **Location:** Randall County — ERCOT · confidence: high
- **Operator:** Astra Wind LLC · confidence: high
- **Asset role:** wind — ERCOT · Randall County
- **Owner:** Astra Wind LLC — These citations support 'Astra Wind LLC' as the public owner/operator name. · confidence: medium

## Related parties

- **Operator:** Astra Wind LLC — Owner / developer associated with Astra Wind Farm.
- **EPC contractor:** Tennessee Valley Infrastructure Group (TVIG) — TVIG (through subsidiary Astra Construction, LLC) completed project construction and provided design, civil works, foundations, and O&M facility construction. ([source](https://www.tvigroup.com/))

## Sources

- [9/26/2017 9:51:39 AM](https://downloads.regulations.gov/EPA-R09-OAR-2017-0473-0016/attachment_3.pdf) — downloads.regulations.gov · regulatory — Sep 26, 2017 — Astra Wind LLC IPP Astra Wind Farm TX 60856 ASTRA 163.0 Onshore Wind Turbine WND WT 2017.
- [Filing Receipt - PUC Interchange - Texas.gov](https://interchange.puc.texas.gov/Documents/54639_1_1270479.PDF) — interchange.puc.texas.gov · regulatory — Feb 9, 2023 — Interconnection Facility substation
- [TitlePage](https://www.ercot.com/files/docs/2021/12/29/CapacityDemandandReservesReport_December2021.xlsx) — ercot.com · regulatory — Dec 29, 2021 — ASTRA_UNIT1, RANDALL, WIND-P, PANHANDLE, 2017, 163.2
- [Capacity Demand and Reserves Report December 2021](https://ercot.com/files/docs/2021/12/29/CapacityDemandandReservesReport_December2021.xlsx) — ercot.com · regulatory — Dec 29, 2021 — ASTRA_UNIT1, RANDALL, WIND-P, PANHANDLE, 2017, 163.2
- [Falvez Energy](https://falvez.com/) — falvez.com · other — Falvez Energy is a premiere independent power company developing the future of energy in the Americas by creating consistent long-term cash-flows
- [ASTRA WIND LLC - LEI: 25490067NHRU34J8WV10](https://lei.bloomberg.com/leis/view/25490067NHRU34J8WV10) — lei.bloomberg.com · other — Headquarters Address (English). 1212 New York Avenue, N. W. Suite 1000 Washington, District of Columbia (US-DC), 20005 UNITED STATES.

---

Canonical page: https://askthegrid.com/assets/facilities/astra-wind-farm
Website: [Falvez Energy](https://falvez.com/)
Profile published: 2026-07-17T03:33:59.688Z
Source: Ask the Grid — https://askthegrid.com/