# Balko Wind LLC

SPP asset profile · https://askthegrid.com/assets/facilities/balko-wind-llc

## Current generation inventory

EIA plant 58900 · Inventory reporting month: 2026-08.

- wind: 299.7 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -100.8472, 36.518056
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2025-01-01 03:00:36+00:00
- Map prepared: 2026-10-10T02:28:22.708647+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Balko Wind LLC is a 299.7 MW onshore wind turbine plant in Beaver County. Balko Wind is a 300 MW wind project in Beaver County, Oklahoma. Apex Clean Energy began developing it in 2009 and sold it to an affiliate of D. E. Shaw Renewable Investments in late 2014, with Mortenson Construction as engineering, procurement and construction contractor. It uses 162 GE 1.85-87 turbines and sells power under agreements with the Public Service Company of Oklahoma and Western Farmers Electric Cooperative. Commercial operation began in 2015.

## Reviewed metrics

- **Nameplate capacity:** 299.7 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 58900 — plant-58900

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Balko Wind LLC

## Related parties

- **Owner / acquirer / asset manager:** D. E. Shaw Renewable Investments (DESRI) — owner ([source](https://www.desri.com))
- **EPC contractor / construction contractor:** Mortenson Construction — epc_contractor
- **Equipment supplier:** GE — equipment_supplier ([source](https://www.ge.com))
- **Offtaker:** Public Service Company of Oklahoma — offtaker ([source](https://www.psoklahoma.com))
- **Offtaker:** Western Farmers Electric Cooperative — offtaker ([source](https://www.wfec.com))
- **Lender:** Santander Bank, N.A. — lender
- **Lender:** KeyBank, N.A. — lender
- **Lender / tax equity investor:** Citi — lender
- **Lender:** Banco de Sabadell, S.A. — lender
- **Tax equity investor:** Bank of America Merrill Lynch — tax_equity_investor
- **Tax equity investor:** Google — tax_equity_investor

## Sources

- [apexcleanenergy.com](https://www.apexcleanenergy.com/news/de-shaw-renewable-investments-acquires-300-mw-balko-wind-apex-clean-energy/) — apexcleanenergy.com · public_source — Source retained for exact-record publication review.
- [psoklahoma.com](https://www.psoklahoma.com/info/news/viewRelease.aspx?releaseID=2818) — psoklahoma.com · public_source — Source retained for exact-record publication review.
- [wfec.com](https://www.wfec.com/about-our-history) — wfec.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/balko-wind-llc
Website: [D. E. Shaw Renewable Investments (DESRI)](https://www.desri.com)

Source: Ask the Grid — https://askthegrid.com/
