# Bergen Generating Station

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/bergen-generating-station

Bergen Generating Station is a natural gas-fired power facility with 1,400.8 MW of EIA-reported nameplate capacity and 600 MWh of reported energy capacity in Bergen County, New Jersey, registered as EIA Plant ID 2398. The plant's generating configuration is two combined-cycle natural-gas units, with oil listed as an additional fuel.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 1400.8000000000002 MW
- Energy capacity: 600 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)

## Source-backed facts

- Owner logo domain: alphagen.com — Alpha Generation | Reliable Energy Now And Always · confidence: high
- Description: Bergen Generating Station is an operating 1,400.8 MW natural-gas-fired combined-cycle plant in Ridgefield, Bergen County, New Jersey. Alpha Generation describes the facility as two combined-cycle natural-gas units with fuel oil available as backup. EIA records identify eight generator IDs at the plant, with PJM reporting location BERGEN 18 KV. — Compliance - Alpha Generation · confidence: medium
- Parties: [{"relationship":"Current owner and operator","name":"Alpha Generation","official_url":"https://www.alphagen.com/"},{"relationship":"Parent investment manager / fund sponsor","name":"ArcLight Capital Partners, LLC","official_url":"https://arclight.com/"},{"relationship":"Historical operator; identified in the NJDEP 2020 permit record","name":"Consolidated Asset Management Services (CAMS) LLC","official_url":null},{"relationship":"Former owner / permittee; ownership transferred from PSEG in 2021","name":"Parkway Generation Operating LLC","official_url":null},{"relationship":"Former owner/operator before the 2021 transfer","name":"PSEG Fossil LLC","official_url":"https://www.pseg.com/"}] — Alpha Generation | Reliable Energy Now And Always · confidence: medium
- Parties: [{"relationship":"Current owner and operator","name":"Alpha Generation","official_url":"https://www.alphagen.com/"},{"relationship":"Parent investment manager / fund sponsor","name":"ArcLight Capital Partners, LLC","official_url":"https://arclight.com/"},{"relationship":"Historical operator; identified in the NJDEP 2020 permit record","name":"Consolidated Asset Management Services (CAMS) LLC","official_url":null},{"relationship":"Former owner / permittee; ownership transferred from PSEG in 2021","name":"Parkway Generation Operating LLC","official_url":null},{"relationship":"Former owner/operator before the 2021 transfer","name":"PSEG Fossil LLC","official_url":"https://www.pseg.com/"}] — Statement of Basis · confidence: medium
- Parties.1: {"relationship":"Parent investment manager / fund sponsor","name":"ArcLight Capital Partners, LLC","official_url":"https://arclight.com/"} — Alpha Generation | Reliable Energy Now And Always · confidence: medium
- Parties.2: {"relationship":"Historical operator; identified in the NJDEP 2020 permit record","name":"Consolidated Asset Management Services (CAMS) LLC","official_url":null} — Statement of Basis · confidence: high
- Parties.3: {"relationship":"Former owner / permittee; ownership transferred from PSEG in 2021","name":"Parkway Generation Operating LLC","official_url":null} — Statement of Basis · confidence: high
- Unit configuration: Two combined-cycle natural-gas units, with oil listed as an additional fuel. — Source · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-2000e.html — Gas turbines at combined- cycle power plants... · confidence: medium
- Description: Bergen Generating Station is an operating natural-gas-fired combined-cycle plant in Ridgefield, Bergen County, New Jersey, with fuel oil available as backup. The facility comprises the Bergen 1 and Bergen 2 combined-cycle phases and is associated with Alpha Generation's Parkway Generation portfolio. Alpha Generation is identified as the current owner and asset manager, while CAMS provides operations and maintenance services; the assets are backed by funds managed by ArcLight Capital Partners. Bergen 1 entered service in 1995 and Bergen 2 entered service in 2002 after PSE&G's repowering and expansion work. PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021, and Parkway Generation completed the Bergen-containing portfolio acquisition in February 2022. — About Us - Alpha Generation · confidence: medium
- Description: Bergen Generating Station is an operating natural-gas-fired combined-cycle plant in Ridgefield, Bergen County, New Jersey, with fuel oil available as backup. The facility comprises the Bergen 1 and Bergen 2 combined-cycle phases and is associated with Alpha Generation's Parkway Generation portfolio. Alpha Generation is identified as the current owner and asset manager, while CAMS provides operations and maintenance services; the assets are backed by funds managed by ArcLight Capital Partners. Bergen 1 entered service in 1995 and Bergen 2 entered service in 2002 after PSE&G's repowering and expansion work. PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021, and Parkway Generation completed the Bergen-containing portfolio acquisition in February 2022. — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: medium
- Quality notes: ["The 1,400.8 MW plant-wide capacity and the 1,245 MW combined capacity shown for Bergen 1 and Bergen 2 reflect different source conventions or reporting scopes; they should not be treated as interchangeable.","The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price.","AlphaGen's May 2026 portfolio text identifies Brandywine, not Bergen, as the facility acquired by AlphaGen in May 2026; no separate Bergen sale consideration is assigned here. The documented Bergen ownership chain is PSEG Power to Parkway Generation, with Alpha Generation subsequently identified as owner and manager of the asset."] — Bergen Combined Cycle Power Plant, US · confidence: medium
- Quality notes: ["The 1,400.8 MW plant-wide capacity and the 1,245 MW combined capacity shown for Bergen 1 and Bergen 2 reflect different source conventions or reporting scopes; they should not be treated as interchangeable.","The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price.","AlphaGen's May 2026 portfolio text identifies Brandywine, not Bergen, as the facility acquired by AlphaGen in May 2026; no separate Bergen sale consideration is assigned here. The documented Bergen ownership chain is PSEG Power to Parkway Generation, with Alpha Generation subsequently identified as owner and manager of the asset."] — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: medium
- Quality notes: ["The 1,400.8 MW plant-wide capacity and the 1,245 MW combined capacity shown for Bergen 1 and Bergen 2 reflect different source conventions or reporting scopes; they should not be treated as interchangeable.","The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price.","AlphaGen's May 2026 portfolio text identifies Brandywine, not Bergen, as the facility acquired by AlphaGen in May 2026; no separate Bergen sale consideration is assigned here. The documented Bergen ownership chain is PSEG Power to Parkway Generation, with Alpha Generation subsequently identified as owner and manager of the asset."] — About Us - Alpha Generation · confidence: medium
- Financing summary: The Bergen transaction was financed at the portfolio level rather than through a separately disclosed Bergen project-finance facility. Parkway Generation, an ArcLight Energy Partners Fund VII subsidiary, closed its acquisition from PSEG on 2022-02-18 for $1.37 billion, financed with $1.14 billion of senior secured credit facilities in the institutional term-loan market plus ArcLight equity. S&P described the Q4 2021 structure as a $1.0 billion senior secured term loan B, a $140 million senior secured term loan C, and a $100 million revolving credit facility. Separately, PSEG's August 2021 sale agreement stated aggregate consideration of approximately $1.92 billion, subject to adjustments; this was sale consideration, not project debt. No Bergen-specific financing allocation or lender names were disclosed. — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: medium
- Financing summary: The Bergen transaction was financed at the portfolio level rather than through a separately disclosed Bergen project-finance facility. Parkway Generation, an ArcLight Energy Partners Fund VII subsidiary, closed its acquisition from PSEG on 2022-02-18 for $1.37 billion, financed with $1.14 billion of senior secured credit facilities in the institutional term-loan market plus ArcLight equity. S&P described the Q4 2021 structure as a $1.0 billion senior secured term loan B, a $140 million senior secured term loan C, and a $100 million revolving credit facility. Separately, PSEG's August 2021 sale agreement stated aggregate consideration of approximately $1.92 billion, subject to adjustments; this was sale consideration, not project debt. No Bergen-specific financing allocation or lender names were disclosed. — Presale: Parkway Generation LLC | S&P Global Ratings · confidence: medium
- Financing summary: The Bergen transaction was financed at the portfolio level rather than through a separately disclosed Bergen project-finance facility. Parkway Generation, an ArcLight Energy Partners Fund VII subsidiary, closed its acquisition from PSEG on 2022-02-18 for $1.37 billion, financed with $1.14 billion of senior secured credit facilities in the institutional term-loan market plus ArcLight equity. S&P described the Q4 2021 structure as a $1.0 billion senior secured term loan B, a $140 million senior secured term loan C, and a $100 million revolving credit facility. Separately, PSEG's August 2021 sale agreement stated aggregate consideration of approximately $1.92 billion, subject to adjustments; this was sale consideration, not project debt. No Bergen-specific financing allocation or lender names were disclosed. — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — Bergen station repowered · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — Bergen Combined Cycle Power Plant, US · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — PSEG Power to Expand Bergen, Burlington Projects · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — Statement of Basis · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — Presale: Parkway Generation LLC | S&P Global Ratings · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: medium
- Timeline: [{"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."},{"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."},{"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."},{"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."},{"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."},{"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."},{"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."},{"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."},{"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."},{"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."},{"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."},{"event":"Planned uprate","date":"2025-05-09","detail":"AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027."}] — AlphaGen Projects Selected by PJM for Expedited Interconnection - NJBIA · confidence: medium
- Commercial parties: [{"relationship":"Current owner and asset manager","name":"Alpha Generation, LLC","detail":"CAMS's 2024 annual report identifies Bergen as owned by Alpha Generation, while AlphaGen's corporate materials describe AlphaGen as managing and operating its generation facilities.","official_url":"https://www.alphagen.com/"},{"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"},{"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null},{"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"},{"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"}] — About Us - Alpha Generation · confidence: medium
- Commercial parties: [{"relationship":"Current owner and asset manager","name":"Alpha Generation, LLC","detail":"CAMS's 2024 annual report identifies Bergen as owned by Alpha Generation, while AlphaGen's corporate materials describe AlphaGen as managing and operating its generation facilities.","official_url":"https://www.alphagen.com/"},{"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"},{"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null},{"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"},{"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"}] — ArcLight Creates AlphaGen to Manage One of the Largest Power Infrastructure Portfolios in the United States - Alpha Generation · confidence: medium
- Commercial parties: [{"relationship":"Current owner and asset manager","name":"Alpha Generation, LLC","detail":"CAMS's 2024 annual report identifies Bergen as owned by Alpha Generation, while AlphaGen's corporate materials describe AlphaGen as managing and operating its generation facilities.","official_url":"https://www.alphagen.com/"},{"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"},{"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null},{"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"},{"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"}] — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: medium
- Commercial parties: [{"relationship":"Current owner and asset manager","name":"Alpha Generation, LLC","detail":"CAMS's 2024 annual report identifies Bergen as owned by Alpha Generation, while AlphaGen's corporate materials describe AlphaGen as managing and operating its generation facilities.","official_url":"https://www.alphagen.com/"},{"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"},{"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null},{"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"},{"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"}] — Statement of Basis · confidence: medium
- Commercial parties: [{"relationship":"Current owner and asset manager","name":"Alpha Generation, LLC","detail":"CAMS's 2024 annual report identifies Bergen as owned by Alpha Generation, while AlphaGen's corporate materials describe AlphaGen as managing and operating its generation facilities.","official_url":"https://www.alphagen.com/"},{"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"},{"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null},{"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"},{"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"}] — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: medium
- Quality notes.0: The 1,400.8 MW plant-wide capacity and the 1,245 MW combined capacity shown for Bergen 1 and Bergen 2 reflect different source conventions or reporting scopes; they should not be treated as interchangeable. — Bergen Combined Cycle Power Plant, US · confidence: medium
- Quality notes.1: The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price. — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: high
- Quality notes.1: The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price. — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: high
- Quality notes.2: AlphaGen's May 2026 portfolio text identifies Brandywine, not Bergen, as the facility acquired by AlphaGen in May 2026; no separate Bergen sale consideration is assigned here. The documented Bergen ownership chain is PSEG Power to Parkway Generation, with Alpha Generation subsequently identified as owner and manager of the asset. — About Us - Alpha Generation · confidence: medium
- Timeline.0: {"event":"Original-fuel conversion","date":"1970","detail":"The original coal-fired steam units were converted to heavy fuel oil and natural gas."} — Bergen station repowered · confidence: high
- Timeline.1: {"event":"Bergen 1 commercial operation","date":"1995-06","detail":"Bergen 1 was commissioned and entered service as the first combined-cycle phase."} — Bergen Combined Cycle Power Plant, US · confidence: high
- Timeline.2: {"event":"Major repowering","date":"1996","detail":"PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment."} — PSEG Power to Expand Bergen, Burlington Projects · confidence: medium
- Timeline.3: {"event":"Bergen 2 expansion","date":"2000","detail":"PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002."} — PSEG Power to Expand Bergen, Burlington Projects · confidence: medium
- Timeline.4: {"event":"Bergen 2 commercial operation","date":"2002-06","detail":"EIA-linked generator records identify Bergen 2 equipment as operating in June 2002, consistent with the announced completion schedule."} — Statement of Basis · confidence: high
- Timeline.5: {"event":"Combustion-turbine retirement","date":"2015-05-01","detail":"The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit."} — Statement of Basis · confidence: high
- Timeline.6: {"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."} — Statement of Basis · confidence: high
- Timeline.6: {"event":"Performance upgrades","date":"2017-08-01","detail":"A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1."} — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: high
- Timeline.7: {"event":"Sale agreement and ownership transfer","date":"2021-08-12","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates for approximately $1.92 billion; the NJDEP permit record identifies Bergen's ownership transfer from PSEG Power LLC to Parkway Generation LLC on August 12, 2021."} — Presale: Parkway Generation LLC | S&P Global Ratings · confidence: medium
- Timeline.8: {"event":"Portfolio acquisition financing","date":"2021","detail":"Parkway's acquisition financing reached financial close in Q4 2021 with $1.14 billion of proposed funded debt, consisting of a $1.0 billion term loan B and $140 million term loan C, supported by ArcLight equity and a $100 million revolving facility."} — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: high
- Timeline.9: {"event":"Portfolio acquisition closing","date":"2022-02-18","detail":"Parkway Generation, a wholly owned subsidiary of ArcLight Energy Partners Fund VII, closed the acquisition of the 4.8 GW portfolio from PSEG for $1.37 billion."} — Statement of Basis · confidence: high
- Timeline.10: {"event":"Asset-management transition","date":"2024-09-20","detail":"The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation."} — AlphaGen Projects Selected by PJM for Expedited Interconnection - NJBIA · confidence: high
- Commercial parties.1: {"relationship":"Investment sponsor and 2021 acquisition sponsor","name":"ArcLight Capital Partners, LLC / ArcLight Energy Partners Fund VII, L.P.","detail":"ArcLight affiliates acquired the PSEG fossil portfolio through Parkway Generation and provide the investment sponsorship behind the current portfolio.","official_url":"https://arclight.com/"} — ArcLight Creates AlphaGen to Manage One of the Largest Power Infrastructure Portfolios in the United States - Alpha Generation · confidence: high
- Commercial parties.2: {"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null} — Statement of Basis · confidence: medium
- Commercial parties.2: {"relationship":"Acquisition vehicle and former permittee","name":"Parkway Generation, LLC / Parkway Generation Operating LLC","detail":"Parkway Generation acquired the Bergen-containing portfolio from PSEG in February 2022; NJDEP records identify the ownership and permit-name transition from PSEG Power to Parkway Generation in August 2021.","official_url":null} — ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG · confidence: medium
- Commercial parties.3: {"relationship":"Seller and predecessor owner","name":"Public Service Enterprise Group, Inc. / PSEG Power LLC","detail":"PSEG agreed to sell its fossil-generation portfolio to ArcLight affiliates in August 2021. PSEG Power was the predecessor owner identified in the Bergen permit record.","official_url":"https://www.pseg.com/"} — PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital · confidence: high
- Commercial parties.4: {"relationship":"Operations and maintenance provider","name":"Consolidated Asset Management Services, LLC (CAMS)","detail":"CAMS is identified by NJDEP as Bergen's operator and by its corporate annual report as providing O&M services for the Alpha Generation-owned facility.","official_url":"https://camstex.com/"} — Statement of Basis · confidence: high

## Timeline

- 1970 — Original-fuel conversion
  The original coal-fired steam units were converted to heavy fuel oil and natural gas.
  Source: Bergen station repowered (https://www.power-eng.com/coal/bergen-station-repowered/)
- 1996 — Major repowering
  PSE&G repowered the approximately 650 MW station, removing a steam unit and installing four combined-cycle combustion turbines, heat-recovery steam generation, and approximately $360 million of new equipment.
  Source: Bergen station repowered (https://www.power-eng.com/coal/bergen-station-repowered/)
- 2000 — Bergen 2 expansion
  PSEG announced a $290 million Bergen 2 combined-cycle project, planned for completion in June 2002.
  Source: PSEG Power to Expand Bergen, Burlington Projects (https://www.poweronline.com/doc/pseg-power-to-expand-bergen-burlington-projec-0001)
- 2015-05-01 — Combustion-turbine retirement
  The FT4 combustion turbine under emission unit U2 was placed into permanent retirement and later removed from the permit.
  Source: Statement of Basis (https://dep.nj.gov/wp-content/uploads/boss/public-notices/02488-bop190002-statementofbasis.pdf)
- 2017-08-01 — Performance upgrades
  A permit modification implemented performance upgrades on the four Siemens V84.2 combined-cycle combustion turbines comprising Bergen Unit 1.
  Source: Statement of Basis (https://dep.nj.gov/wp-content/uploads/boss/public-notices/02488-bop190002-statementofbasis.pdf)
- 2022-02 — Acquisition closed
  Bergen Generating Station was identified as one of the fossil facilities PSEG was selling to ArcLight. Parkway Generation, LLC, an ArcLight subsidiary, closed the acquisition of PSEG's broader 4.8 GW portfolio on February 18, 2022. The disclosed $1.37 billion portfolio purchase price and $1.14 billion portfolio debt financing were not allocated to Bergen Generating Station, so no asset-specific amount is reported.
  Source: ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG (https://www.prnewswire.com/news-releases/arclight-closes-acquisition-of-4-8-gw-power-generation-portfolio-from-pseg-301485739.html)
- 2024-09-20 — Asset-management transition
  The NJDEP permit revision history changed the Bergen asset manager from Kindle Energy to Alpha Generation.
  Source: Statement of Basis (https://dep.nj.gov/wp-content/uploads/boss/public-notices/02488-bop190002-statementofbasis.pdf)
- 2025-05-09 — Planned uprate
  AlphaGen announced a proposed 53 MW Bergen uprate using advanced gas-path upgrades for the gas turbines and a steam-turbine upgrade; completion was described as possible as soon as 2027.
  Source: AlphaGen Projects Selected by PJM for Expedited Interconnection - NJBIA (https://njbia.org/alphagen-projects-selected-by-pjm-for-expedited-interconnection/)

## Sources

- [Alpha Generation | Reliable Energy Now And Always](https://www.alphagen.com/) — alphagen.com · tier other
- [Portfolio - Alpha Generation](https://www.alphagen.com/portfolio/) — alphagen.com · tier other
- [Compliance - Alpha Generation](https://www.alphagen.com/compliance/) — alphagen.com · tier other
- [Statement of Basis](https://dep.nj.gov/wp-content/uploads/boss/public-notices/02488-bop190002-statementofbasis.pdf) — dep.nj.gov · tier regulatory
- [Source](https://alphagen.com/portfolio) — alphagen.com · tier other
- [Bergen Combined Cycle Power Plant, US](https://www.power-technology.com/marketdata/bergen-combined-cycle-power-plant-us/) — power-technology.com · tier other
- [Bergen station repowered](https://www.power-eng.com/coal/bergen-station-repowered/) — power-eng.com · tier other
- [Gas turbines at combined- cycle power plants ...](https://assets.siemens-energy.com/dam/8224a82f-9ed8-475e-b946-b26c0169f8fd/brochure-combined-cycle-technical-Data-250121b-pdf_Original%20file.pdf) — assets.siemens-energy.com · tier other
- [7F Heavy Duty Gas Turbine | 7F.04/7F.05](https://www.gevernova.com/gas-power/products/gas-turbines/7f) — gevernova.com · tier other
- [About Us - Alpha Generation](https://www.alphagen.com/about-us/) — alphagen.com · tier other
- [ArcLight Closes Acquisition of 4.8 GW Power Generation Portfolio from PSEG](https://www.prnewswire.com/news-releases/arclight-closes-acquisition-of-4-8-gw-power-generation-portfolio-from-pseg-301485739.html) — prnewswire.com · tier other
- [Presale: Parkway Generation LLC | S&P Global Ratings](https://www.spglobal.com/ratings/en/regulatory/article/211027-presale-parkway-generation-llc-s12156271) — spglobal.com · tier other
- [PSEG Agrees to Sell PSEG Fossil Generating Portfolio to ArcLight Capital](https://nj.pseg.com/newsroom/newsrelease241) — nj.pseg.com · tier other
- [PSEG Power to Expand Bergen, Burlington Projects](https://www.poweronline.com/doc/pseg-power-to-expand-bergen-burlington-projec-0001) — poweronline.com · tier other
- [AlphaGen Projects Selected by PJM for Expedited Interconnection - NJBIA](https://njbia.org/alphagen-projects-selected-by-pjm-for-expedited-interconnection/) — njbia.org · tier other
- [ArcLight Creates AlphaGen to Manage One of the Largest Power Infrastructure Portfolios in the United States - Alpha Generation](https://www.alphagen.com/newsroom/press-releases/arclight-creates-alphagen-to-manage-one-of-the-largest-power-infrastructure-portfolios-in-the-united-states) — alphagen.com · tier other
- [Reliability Resource Initiative Additional Summaries](https://www.pjm.com/-/media/DotCom/committees-groups/committees/pc/2025/20250506/20250506-rri-addendum---post-meeting.pdf) — pjm.com · tier other

## Data quality

- The 1,400.8 MW plant-wide capacity and the 1,245 MW combined capacity shown for Bergen 1 and Bergen 2 reflect different source conventions or reporting scopes; they should not be treated as interchangeable. The August 2021 agreement cited approximately $1.92 billion for PSEG's 6,750 MW fossil portfolio, while the February 2022 closing cited $1.37 billion for a 4.8 GW portfolio. Neither figure is a Bergen-specific sale price. AlphaGen's May 2026 portfolio text identifies Brandywine, not Bergen, as the facility acquired by AlphaGen in May 2026; no separate Bergen sale consideration is assigned here. The documented Bergen ownership chain is PSEG Power to Parkway Generation, with Alpha Generation subsequently identified as owner and manager of the asset.

---

Canonical page: https://askthegrid.com/assets/facilities/bergen-generating-station

Source: Ask the Grid — https://askthegrid.com/