Big Elm Solar is a solar power facility with 200 MW of EIA-reported operating capacity in Bell County, Texas, registered as EIA Plant ID 68180. Apex Clean Energy is the public owner or developer; Big Elm Solar, LLC is the registered plant entity or operator. Big Elm Solar was named as a generation source for a first-of-its-kind Consortium for Climate Solutions virtual power purchase arrangement announced November 22, 2024; Apex identified Big Elm (200 MW) as one of the two projects supplying the consortium’s ~1.3 TWh/year commitment. Commercial operation began in January 2025. The facility interconnects at Temple Pecan Creek Substation (345 kV) at 345 kV.

## Profile

- **Grid role:** Utility-scale solar generation in ERCOT's energy-only market.
- **Context:** Big Elm Solar was named as a generation source for a first-of-its-kind Consortium for Climate Solutions virtual power purchase arrangement announced November 22, 2024; Apex identified Big Elm (200 MW) as one of the two projects supplying the consortium’s ~1.3 TWh/year commitment.
- **Physical build:** EIA / interconnection record: 200 MW AC utility-scale photovoltaic plant (single generating unit reported as BELMS) — operational (first-unit-online in 2025). Local Bell County public project listing shows the Big Elm project scope as 200 MW solar generation plus 200 MW battery storage (storage appears in public/queue records as a separate Big Elm Storage entry; ERCOT / interconnection records show a separate Big Elm Storage project reported at ~120 MW in the queue).

## Metrics

- **Reported capacity:** 200 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Solar Photovoltaic — Primary generation technology.
- **Registry anchor:** Plant 68180 — Big Elm Solar, LLC · Bell County · ERCOT
- **Operating status:** Operating — Big Elm Solar is operating.
- **Commercial operation:** January 2025 — Best-supported operating milestone.

## Facts

- **Reported capacity:** 200 MW — Solar Photovoltaic · confidence: high
- **Operating status:** operating — Big Elm Solar is operating. · confidence: medium
- **Location:** Bell County — ERCOT · confidence: high
- **Operator:** Big Elm Solar, LLC · confidence: high
- **Asset role:** solar — ERCOT · Bell County
- **Commercial operation:** 2024 — Apex online milestone; EIA service month January 2025 · confidence: medium

## Related parties

- **Operator:** Big Elm Solar, LLC — Owner / developer associated with Big Elm Solar. ([source](https://bigelmsolar.com/))
- **Owner / operator:** Apex Clean Energy — Owner / developer associated with Big Elm Solar. ([source](https://www.apexcleanenergy.com/))

## Sources

- [~* TEX>~](https://interchange.puc.texas.gov/Documents/58479_15_1540985.PDF) — interchange.puc.texas.gov · regulatory — Sep 19, 2025 — Generation Resource and Energy Storage Resource that was (1) included in ERCOT' s Network. BIG ELM SOLAR. Solar. 200. <AR_ES.
- [data product details](https://www.ercot.com/misapp/GetReports.do?reportTypeId=10008&reportTitle=Settlement%20Points%20List%20and%20Electrical%20Buses%20Mapping&showHTMLView=&mimicKey) — ercot.com · regulatory — A current list of all Settlement Points that may be used for market processes and transactions; posted with the weekly Model DB Load Hide EMIL Information Show EMIL Information EMIL ID np4-160-sg Report Type ID 10008 Retention Policy N/A Status Active
- [New Project Website Coming Soon](https://bigelmsolar.com/) — bigelmsolar.com · other — apex clean energy logo Coming Soon A new website to stay up to date on your local Apex project We're making some updates and improvements. Check back soon for a refreshed experience. Solar panels reflecting sunlight with wind turbines in the background under a clear sky.

---

Canonical page: https://askthegrid.com/assets/facilities/big-elm-solar
Website: [Apex Clean Energy](https://www.apexcleanenergy.com/)
Profile published: 2026-07-17T03:34:01.552Z
Source: Ask the Grid — https://askthegrid.com/