# BMP Wind (TX)

ERCOT asset profile · https://askthegrid.com/assets/facilities/bmp-wind-tx

Clearway Energy Group · Callahan County · ERCOT

EIA's May 2026 inventory reports one 340 MW wind record dated December 2021. An earlier financing announcement described a 345 MW, 69-turbine design; that planned configuration is not added to the completed equipment count.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT.
- **Completed configuration:** 340 MW and 68 wind turbines.
- **Design history:** The 2020 financing announcement described a 345 MW, 69-turbine plan; the completed 68-turbine disclosure governs the current layout.

## Metrics

- **Operating capacity:** 340 MW — EIA and Clearway
- **Completed turbines:** 68 — Clearway
- **Construction jobs:** 450+ — Clearway
- **Local economic contribution:** $173M — Lease and property tax estimate
- **Registry anchor:** Plant 62809 — BMP Wind LLC

## Facts

- **Operating capacity:** 340 MW — EIA May 2026 · confidence: high
- **Completed equipment:** 68 wind turbines — Clearway · confidence: high

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.

---

Canonical page: https://askthegrid.com/assets/facilities/bmp-wind-tx
Website: [Clearway Energy Group](https://clearwayenergygroup.com/)
Profile published: 2026-07-17T03:34:02.632Z
Source: Ask the Grid — https://askthegrid.com/