# Bobcat Bluff Wind Project LLC

ERCOT asset profile · https://askthegrid.com/assets/facilities/bobcat-bluff-wind-project-llc

Archer County · ERCOT

Bobcat Bluff Wind Project LLC is an EIA-listed onshore wind turbine facility with 161.0 MW in Archer County, Texas, registered as EIA Plant ID 57974 The project record shows a federal subsidy payment of $80,535,223 recorded to Bobcat Bluff Wind Project LLC in 2013, a notable fiscal support entry tied to the facility.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.
- **Market node:** ARCHER.
- **Context:** The project record shows a federal subsidy payment of $80,535,223 recorded to Bobcat Bluff Wind Project LLC in 2013, a notable fiscal support entry tied to the facility.
- **Physical build:** 100 GE onshore wind turbines (reported at commissioning as 100 × 1.5 MW GE turbines); project spans ~12,500–14,000 acres and was commissioned in December 2012 / January 2013 (owner: EDF Renewable Asset Holdings, Inc.; EIA plant capacity ~161 MW).

## Metrics

- **Reported capacity:** 161 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 57974 — Archer County · ERCOT
- **Operating status:** Operating — Bobcat Bluff Wind Project LLC is operating.
- **Settlement point:** BCATWD_WD_1 — ERCOT settlement point.
- **Resource stack:** 1 resource — BCATWIND_WIND_1

## Facts

- **Reported capacity:** 161 MW — Onshore Wind Turbine · confidence: high
- **Operating status:** operating — Bobcat Bluff Wind Project LLC is operating. · confidence: medium
- **Location:** Archer County — ERCOT · confidence: high
- **Asset role:** wind — ERCOT · Archer County
- **Owner:** EDF Renewable Asset Holdings, Inc. — as owner. These independent records converge on the same corporate owner name. · confidence: medium

## Sources

- [Seasonal Assessment of Resource Adequacy for the ERCOT...](https://downloads.regulations.gov/EPA-R06-OAR-2016-0611-0267/attachment_16.pdf) — downloads.regulations.gov · regulatory — Seasonal Assessment of Resource Adequacy for the ERCOT. BCATWIND_WIND_1. ARCHER. WIND-O. WEST. 2020. 162.0
- [Schedule 2, 'Plant Data'](https://downloads.regulations.gov/OSHA-H005C-2006-0870-0430/attachment_2.pdf) — downloads.regulations.gov · regulatory — Form EIA-860 Data - Schedule 2, 'Plant Data' Utility … 57974 Bobcat Bluff Wind Project LLC 1354 Cowan Rd Archer TX
- [Introducing GE's 1.6-100](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BEE123896-B87A-4533-AE46-C652FFACB4C6%7D) — documents.dps.ny.gov · regulatory — GE's 1.6-100 turbine has a 53% gross capacity factor, at 7.5 m/s; 48.7 meter blade. Available in 80 meter and 100 meter tower heights, carbon fiber, Low Noise
- [Federal Register/Vol. 77, No. 151/Monday, August 6, 2012/...](https://www.govinfo.gov/content/pkg/FR-2012-08-06/pdf/2012-19098.pdf) — govinfo.gov · regulatory — Aug 6, 2012 — Bobcat Bluff Wind Project, LLC. Description: Notice of Self- Certification of Exempt Wholesale Generator of Bobcat Bluff. Filed Date: 7/27/12.
- [Forecasted Capacity](https://www.ercot.com/files/docs/2023/03/08/SARA_Spring2023.xlsx) — ercot.com · regulatory — Mar 8, 2023 — WIND BCATWIND_WIND_1 ARCHER … it assumes average May peak weather occuring in April. ERCOT used 90th percentile weather occurring at the time
- [Resource to Region](https://www.ercot.com/files/docs/2023/02/23/WindPowerForecastMonthly_Jan2023_WMWG.xlsx) — ercot.com · regulatory — Feb 23, 2023 — BCATWIND_WIND_1 West 162 2958101 85 44927

---

Canonical page: https://askthegrid.com/assets/facilities/bobcat-bluff-wind-project-llc

Profile published: 2026-07-17T03:34:02.712Z
Source: Ask the Grid — https://askthegrid.com/