Brandon Shores is a coal-fired power facility with 1,370.2 MW of EIA-reported nameplate capacity in Anne Arundel County, Maryland, registered as EIA Plant ID 602. Its continued operation has a significant PJM-BGE grid-reliability role: the units were retained beyond their scheduled June 1, 2025 retirement under an RMR agreement through May 31, 2029. Reported commercial-operation dates are 1984 (Unit 1); 1991 (Unit 2).

## Key facts

- Technology: Conventional Steam Coal
- Power capacity: 1370.2 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM
- Substation: Brandon Shores 230 kV substation
- Point of interconnection: Brandon Shores 230 kV substation
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: talenenergy.com — Brandon Shores Power Plant - Talen Energy · confidence: high
- Identifiers: [{"value":"602","system":"EIA plant ID"},{"value":"60421","system":"EIA entity ID"},{"value":"1","system":"EIA generator ID (plant 602)"},{"value":"2","system":"EIA generator ID (plant 602)"},{"value":"PJM","system":"ISO/RTO"},{"value":"PJM-BGE","system":"PJM market location"},{"value":"ER24-1790","system":"FERC docket"}] — eLibrary | Docket Search Results · confidence: medium
- Identifiers: [{"value":"602","system":"EIA plant ID"},{"value":"60421","system":"EIA entity ID"},{"value":"1","system":"EIA generator ID (plant 602)"},{"value":"2","system":"EIA generator ID (plant 602)"},{"value":"PJM","system":"ISO/RTO"},{"value":"PJM-BGE","system":"PJM market location"},{"value":"ER24-1790","system":"FERC docket"}] — Brandon Shores Power Plant - Talen Energy · confidence: medium
- Owner name: Talen Energy Corporation — Source · confidence: high
- Description: Brandon Shores is a two-unit coal-fired generating facility outside Baltimore, Maryland, in the PJM-BGE market area. EIA identifies the facility as plant 602 under Brandon Shores LLC and lists generators 1 and 2 as conventional steam coal units with 635 MW and 638 MW of net summer capacity, respectively. The units entered commercial operation in 1984 and 1991, and Talen's reliability-must-run arrangement provides for continued operation through May 31, 2029. — Brandon Shores Power Plant - Talen Energy · confidence: high
- Identifiers.4: {"value":"PJM","system":"ISO/RTO"} — Brandon Shores Power Plant - Talen Energy · confidence: high
- Identifiers.5: {"value":"PJM-BGE","system":"PJM market location"} — Brandon Shores Power Plant - Talen Energy · confidence: medium
- Identifiers.6: {"value":"ER24-1790","system":"FERC docket"} — eLibrary | Docket Search Results · confidence: high
- Parties.0: {"relationship":"Legal owner / EIA-registered plant entity","name":"Brandon Shores LLC","official_url":null} — eLibrary | Docket Search Results · confidence: high
- Parties.1: {"relationship":"Parent owner","name":"Talen Energy Corporation","official_url":"https://www.talenenergy.com/"} — Source · confidence: high
- Parties.1: {"relationship":"Parent owner","name":"Talen Energy Corporation","official_url":"https://www.talenenergy.com/"} — Brandon Shores Power Plant - Talen Energy · confidence: high
- Parties.3: {"relationship":"RTO / reliability-must-run counterparty","name":"PJM Interconnection","official_url":"https://www.pjm.com/"} — Source · confidence: high
- Parties.4: {"relationship":"Boiler OEM","name":"Babcock & Wilcox","official_url":"https://www.babcock.com/"} — Brandon Shores Generating Station · confidence: medium
- Parties.5: {"relationship":"Steam turbine OEM","name":"General Electric","official_url":"https://www.ge.com/"} — Brandon Shores Generating Station · confidence: medium
- Construction scope: Two-unit coal-fired thermal facility comprising two Babcock & Wilcox natural-circulation, balanced-draft boilers and two General Electric tandem-compound, double-flow-reheat steam turbines; each turbine has two double-flow low-pressure turbines. Documented air-quality upgrades include flue-gas desulfurization, baghouse/PJFF systems, SO3 control, activated-carbon mercury reduction, SCR/low-NOx controls, a new 400-foot two-flue stack, approximately 2,000 feet of ductwork, and limestone-handling infrastructure. — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Construction scope: Two-unit coal-fired thermal facility comprising two Babcock & Wilcox natural-circulation, balanced-draft boilers and two General Electric tandem-compound, double-flow-reheat steam turbines; each turbine has two double-flow low-pressure turbines. Documented air-quality upgrades include flue-gas desulfurization, baghouse/PJFF systems, SO3 control, activated-carbon mercury reduction, SCR/low-NOx controls, a new 400-foot two-flue stack, approximately 2,000 feet of ductwork, and limestone-handling infrastructure. — Brandon Shores Generating Station – Maryland – ClearStream · confidence: medium
- Product url: https://www.babcock.com/home/products-services/steam-generators/utility-scale-boilers — Large-Scale Utility Boiler Manufacturer » Babcock & Wilcox · confidence: medium
- Manufacturer domain: babcock.com — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Equipment models: [{"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products-services/steam-generators/utility-scale-boilers","count":2,"unit_mw":null,"name":"Babcock & Wilcox natural-circulation, balanced-draft coal boiler"},{"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/steam-turbines","count":2,"unit_mw":685,"name":"General Electric tandem-compound, double-flow-reheat steam turbine, with two double-flow low-pressure turbines"}] — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Product family: Babcock & Wilcox utility-scale coal boilers; General Electric tandem-compound, double-flow-reheat utility steam turbines — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Manufacturer name: Babcock & Wilcox (boilers); General Electric (steam turbines) — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: high
- Equipment models.0: {"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products-services/steam-generators/utility-scale-boilers","count":2,"unit_mw":null,"name":"Babcock & Wilcox natural-circulation, balanced-draft coal boiler"} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Equipment models.1: {"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/steam-turbines","count":2,"unit_mw":685,"name":"General Electric tandem-compound, double-flow-reheat steam turbine, with two double-flow low-pressure turbines"} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Description: Brandon Shores is a two-unit conventional steam coal-generating station in Anne Arundel County, Maryland, on the western shore of the Patapsco River. The units use Babcock & Wilcox boilers and General Electric steam turbines and entered commercial operation in 1984 and 1991; Talen lists 1,273 MW of owned generating capacity, while nominal-capacity sources cite approximately 1,370 MW. A predecessor of Constellation Energy originally constructed the plant; Exelon acquired Constellation in March 2012 and sold the Maryland generating portfolio to Raven Power Holdings LLC in November 2012. Talen Energy later assumed ownership through the Riverstone-related transaction in June 2015 and now owns the facility through Raven Power. The plant's planned 2025 retirement was deferred under a PJM reliability-must-run arrangement until May 31, 2029. — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Description: Brandon Shores is a two-unit conventional steam coal-generating station in Anne Arundel County, Maryland, on the western shore of the Patapsco River. The units use Babcock & Wilcox boilers and General Electric steam turbines and entered commercial operation in 1984 and 1991; Talen lists 1,273 MW of owned generating capacity, while nominal-capacity sources cite approximately 1,370 MW. A predecessor of Constellation Energy originally constructed the plant; Exelon acquired Constellation in March 2012 and sold the Maryland generating portfolio to Raven Power Holdings LLC in November 2012. Talen Energy later assumed ownership through the Riverstone-related transaction in June 2015 and now owns the facility through Raven Power. The plant's planned 2025 retirement was deferred under a PJM reliability-must-run arrangement until May 31, 2029. — Source · confidence: medium
- Description: Brandon Shores is a two-unit conventional steam coal-generating station in Anne Arundel County, Maryland, on the western shore of the Patapsco River. The units use Babcock & Wilcox boilers and General Electric steam turbines and entered commercial operation in 1984 and 1991; Talen lists 1,273 MW of owned generating capacity, while nominal-capacity sources cite approximately 1,370 MW. A predecessor of Constellation Energy originally constructed the plant; Exelon acquired Constellation in March 2012 and sold the Maryland generating portfolio to Raven Power Holdings LLC in November 2012. Talen Energy later assumed ownership through the Riverstone-related transaction in June 2015 and now owns the facility through Raven Power. The plant's planned 2025 retirement was deferred under a PJM reliability-must-run arrangement until May 31, 2029. — Brandon Shores Power Plant - Talen Energy · confidence: medium
- Quality notes: ["Capacity figures use different conventions: EIA and Talen report 635 MW and 638 MW of net summer capacity, totaling 1,273 MW, while other sources cite approximately 1,370 MW of nominal capacity.","The major 2009-2010 capital project was an air-quality-control retrofit, including flue-gas desulfurization, baghouses, mercury controls, and related systems; it was not a generation-capacity expansion or documented repowering.","The approximately $400 million figure relates to Exelon's three-plant Maryland portfolio sale to Raven Power. Exelon's SEC filing reports approximately $371 million of net proceeds after purchase-price adjustments; neither figure is a Brandon Shores-only allocation.","The RMR payments are operating compensation and expense reimbursements, not project-financing proceeds. No separate Brandon Shores project-financing debt or equity package is identified in the cited records."] — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Quality notes: ["Capacity figures use different conventions: EIA and Talen report 635 MW and 638 MW of net summer capacity, totaling 1,273 MW, while other sources cite approximately 1,370 MW of nominal capacity.","The major 2009-2010 capital project was an air-quality-control retrofit, including flue-gas desulfurization, baghouses, mercury controls, and related systems; it was not a generation-capacity expansion or documented repowering.","The approximately $400 million figure relates to Exelon's three-plant Maryland portfolio sale to Raven Power. Exelon's SEC filing reports approximately $371 million of net proceeds after purchase-price adjustments; neither figure is a Brandon Shores-only allocation.","The RMR payments are operating compensation and expense reimbursements, not project-financing proceeds. No separate Brandon Shores project-financing debt or equity package is identified in the cited records."] — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: medium
- Financing summary: Exelon announced on 2012-08-09 that it would sell Brandon Shores, C.P. Crane, and H.A. Wagner to Raven Power Holdings LLC for approximately $400 million; the portfolio sale closed on 2012-11-30. Exelon's SEC filing reported approximately $371 million of net proceeds after fuel-inventory, working-capital, capital-expenditure, and closing-timing adjustments. This was a portfolio asset sale rather than project financing. Separately, the January 2025 RMR settlement provided fixed payments to Talen for Brandon Shores of $312/MW-day, or approximately $145 million annually, plus reimbursement of fuel and variable operations-and-maintenance costs through the RMR term. — Source · confidence: medium
- Financing summary: Exelon announced on 2012-08-09 that it would sell Brandon Shores, C.P. Crane, and H.A. Wagner to Raven Power Holdings LLC for approximately $400 million; the portfolio sale closed on 2012-11-30. Exelon's SEC filing reported approximately $371 million of net proceeds after fuel-inventory, working-capital, capital-expenditure, and closing-timing adjustments. This was a portfolio asset sale rather than project financing. Separately, the January 2025 RMR settlement provided fixed payments to Talen for Brandon Shores of $312/MW-day, or approximately $145 million annually, plus reimbursement of fuel and variable operations-and-maintenance costs through the RMR term. — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: medium
- Timeline: [{"event":"Original construction","date":null,"detail":"The station was originally constructed by a predecessor company of Constellation Energy; the cited record does not provide a construction-start date."},{"event":"Unit 1 commercial operation","date":"1984-05","detail":"Unit 1 entered commercial operation in May 1984."},{"event":"Unit 2 commercial operation","date":"1991-05","detail":"Unit 2 entered commercial operation in May 1991."},{"event":"Unit 1 air-quality retrofit completion","date":"2009-12","detail":"The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009."},{"event":"Air-quality-control project completed","date":"2010-03","detail":"Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems."},{"event":"Sale agreement announced","date":"2012-08-09","detail":"Exelon agreed to sell Brandon Shores and the C.P. Crane and H.A. Wagner stations to Raven Power Holdings LLC, a new Riverstone portfolio company, for approximately $400 million in aggregate."},{"event":"Portfolio sale closed","date":"2012-11-30","detail":"An Exelon Generation subsidiary sold Brandon Shores and the other two Maryland generating stations and associated assets to Raven Power Holdings LLC. The reported net proceeds were approximately $371 million after contractual adjustments."},{"event":"Talen ownership assumed","date":"2015-06-01","detail":"Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure."},{"event":"Coal-retirement plan announced","date":"2020-11","detail":"Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval."},{"event":"RMR tariff filing","date":"2024-04-18","detail":"Brandon Shores LLC filed an RMR continuing-operations rate schedule with FERC under docket ER24-1790; the filing proposed an effective date of June 18, 2024."},{"event":"RMR settlement announced","date":"2025-01-27","detail":"Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date."},{"event":"Scheduled retirement deferred","date":"2025-06-01","detail":"The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement."},{"event":"Planned RMR operating end","date":"2029-05-31","detail":"The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability."}] — Brandon Shores Generating Station - Global Energy Monitor · confidence: medium
- Timeline: [{"event":"Original construction","date":null,"detail":"The station was originally constructed by a predecessor company of Constellation Energy; the cited record does not provide a construction-start date."},{"event":"Unit 1 commercial operation","date":"1984-05","detail":"Unit 1 entered commercial operation in May 1984."},{"event":"Unit 2 commercial operation","date":"1991-05","detail":"Unit 2 entered commercial operation in May 1991."},{"event":"Unit 1 air-quality retrofit completion","date":"2009-12","detail":"The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009."},{"event":"Air-quality-control project completed","date":"2010-03","detail":"Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems."},{"event":"Sale agreement announced","date":"2012-08-09","detail":"Exelon agreed to sell Brandon Shores and the C.P. Crane and H.A. Wagner stations to Raven Power Holdings LLC, a new Riverstone portfolio company, for approximately $400 million in aggregate."},{"event":"Portfolio sale closed","date":"2012-11-30","detail":"An Exelon Generation subsidiary sold Brandon Shores and the other two Maryland generating stations and associated assets to Raven Power Holdings LLC. The reported net proceeds were approximately $371 million after contractual adjustments."},{"event":"Talen ownership assumed","date":"2015-06-01","detail":"Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure."},{"event":"Coal-retirement plan announced","date":"2020-11","detail":"Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval."},{"event":"RMR tariff filing","date":"2024-04-18","detail":"Brandon Shores LLC filed an RMR continuing-operations rate schedule with FERC under docket ER24-1790; the filing proposed an effective date of June 18, 2024."},{"event":"RMR settlement announced","date":"2025-01-27","detail":"Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date."},{"event":"Scheduled retirement deferred","date":"2025-06-01","detail":"The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement."},{"event":"Planned RMR operating end","date":"2029-05-31","detail":"The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability."}] — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Timeline: [{"event":"Original construction","date":null,"detail":"The station was originally constructed by a predecessor company of Constellation Energy; the cited record does not provide a construction-start date."},{"event":"Unit 1 commercial operation","date":"1984-05","detail":"Unit 1 entered commercial operation in May 1984."},{"event":"Unit 2 commercial operation","date":"1991-05","detail":"Unit 2 entered commercial operation in May 1991."},{"event":"Unit 1 air-quality retrofit completion","date":"2009-12","detail":"The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009."},{"event":"Air-quality-control project completed","date":"2010-03","detail":"Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems."},{"event":"Sale agreement announced","date":"2012-08-09","detail":"Exelon agreed to sell Brandon Shores and the C.P. Crane and H.A. Wagner stations to Raven Power Holdings LLC, a new Riverstone portfolio company, for approximately $400 million in aggregate."},{"event":"Portfolio sale closed","date":"2012-11-30","detail":"An Exelon Generation subsidiary sold Brandon Shores and the other two Maryland generating stations and associated assets to Raven Power Holdings LLC. The reported net proceeds were approximately $371 million after contractual adjustments."},{"event":"Talen ownership assumed","date":"2015-06-01","detail":"Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure."},{"event":"Coal-retirement plan announced","date":"2020-11","detail":"Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval."},{"event":"RMR tariff filing","date":"2024-04-18","detail":"Brandon Shores LLC filed an RMR continuing-operations rate schedule with FERC under docket ER24-1790; the filing proposed an effective date of June 18, 2024."},{"event":"RMR settlement announced","date":"2025-01-27","detail":"Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date."},{"event":"Scheduled retirement deferred","date":"2025-06-01","detail":"The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement."},{"event":"Planned RMR operating end","date":"2029-05-31","detail":"The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability."}] — Source · confidence: medium
- Timeline: [{"event":"Original construction","date":null,"detail":"The station was originally constructed by a predecessor company of Constellation Energy; the cited record does not provide a construction-start date."},{"event":"Unit 1 commercial operation","date":"1984-05","detail":"Unit 1 entered commercial operation in May 1984."},{"event":"Unit 2 commercial operation","date":"1991-05","detail":"Unit 2 entered commercial operation in May 1991."},{"event":"Unit 1 air-quality retrofit completion","date":"2009-12","detail":"The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009."},{"event":"Air-quality-control project completed","date":"2010-03","detail":"Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems."},{"event":"Sale agreement announced","date":"2012-08-09","detail":"Exelon agreed to sell Brandon Shores and the C.P. Crane and H.A. Wagner stations to Raven Power Holdings LLC, a new Riverstone portfolio company, for approximately $400 million in aggregate."},{"event":"Portfolio sale closed","date":"2012-11-30","detail":"An Exelon Generation subsidiary sold Brandon Shores and the other two Maryland generating stations and associated assets to Raven Power Holdings LLC. The reported net proceeds were approximately $371 million after contractual adjustments."},{"event":"Talen ownership assumed","date":"2015-06-01","detail":"Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure."},{"event":"Coal-retirement plan announced","date":"2020-11","detail":"Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval."},{"event":"RMR tariff filing","date":"2024-04-18","detail":"Brandon Shores LLC filed an RMR continuing-operations rate schedule with FERC under docket ER24-1790; the filing proposed an effective date of June 18, 2024."},{"event":"RMR settlement announced","date":"2025-01-27","detail":"Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date."},{"event":"Scheduled retirement deferred","date":"2025-06-01","detail":"The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement."},{"event":"Planned RMR operating end","date":"2029-05-31","detail":"The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability."}] — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: medium
- Timeline.0: {"event":"Original construction","date":null,"detail":"The station was originally constructed by a predecessor company of Constellation Energy; the cited record does not provide a construction-start date."} — Brandon Shores Generating Station - Global Energy Monitor · confidence: medium
- Timeline.1: {"event":"Unit 1 commercial operation","date":"1984-05","detail":"Unit 1 entered commercial operation in May 1984."} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Timeline.2: {"event":"Unit 2 commercial operation","date":"1991-05","detail":"Unit 2 entered commercial operation in May 1991."} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Timeline.3: {"event":"Unit 1 air-quality retrofit completion","date":"2009-12","detail":"The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009."} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Timeline.4: {"event":"Air-quality-control project completed","date":"2010-03","detail":"Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems."} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: medium
- Timeline.6: {"event":"Portfolio sale closed","date":"2012-11-30","detail":"An Exelon Generation subsidiary sold Brandon Shores and the other two Maryland generating stations and associated assets to Raven Power Holdings LLC. The reported net proceeds were approximately $371 million after contractual adjustments."} — Source · confidence: high
- Timeline.7: {"event":"Talen ownership assumed","date":"2015-06-01","detail":"Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure."} — Brandon Shores Generating Station - Global Energy Monitor · confidence: medium
- Timeline.8: {"event":"Coal-retirement plan announced","date":"2020-11","detail":"Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval."} — Brandon Shores Generating Station - Global Energy Monitor · confidence: medium
- Timeline.10: {"event":"RMR settlement announced","date":"2025-01-27","detail":"Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date."} — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: high
- Timeline.11: {"event":"Scheduled retirement deferred","date":"2025-06-01","detail":"The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement."} — Brandon Shores Power Plant - Talen Energy · confidence: high
- Timeline.12: {"event":"Planned RMR operating end","date":"2029-05-31","detail":"The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability."} — Brandon Shores Power Plant - Talen Energy · confidence: medium
- Commercial parties.1: {"relationship":"Parent owner / current portfolio owner","name":"Talen Energy Corporation","detail":"Talen owns the Brandon Shores facility through its Raven Power subsidiary and lists 100% ownership and commercial operating years of 1984 and 1991.","official_url":"https://www.talenenergy.com/"} — Brandon Shores Power Plant - Talen Energy · confidence: medium
- Commercial parties.3: {"relationship":"2012 buyer / intermediate owner","name":"Raven Power Holdings LLC","detail":"Raven Power Holdings LLC, a newly formed Riverstone portfolio company, acquired Brandon Shores and two other Maryland coal plants from Exelon in the November 2012 portfolio transaction.","official_url":null} — Source · confidence: high
- Commercial parties.4: {"relationship":"2012 seller","name":"Exelon Corporation","detail":"An Exelon Generation subsidiary sold Brandon Shores and the associated Maryland generating assets on November 30, 2012, following Exelon's 2012 acquisition of Constellation.","official_url":"https://www.exeloncorp.com/"} — Source · confidence: medium
- Commercial parties.5: {"relationship":"Predecessor owner / original developer lineage","name":"Constellation Energy","detail":"The station was originally constructed by a predecessor company of Constellation Energy, whose generation assets became part of Exelon through the March 2012 merger.","official_url":null} — Brandon Shores Generating Station - Global Energy Monitor · confidence: medium
- Commercial parties.7: {"relationship":"RTO / RMR counterparty","name":"PJM Interconnection","detail":"PJM is the regional transmission organization associated with the PJM-BGE market location and the RMR arrangement that supports continued operation for Baltimore-area reliability.","official_url":"https://www.pjm.com/"} — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: high
- Commercial parties.8: {"relationship":"State regulatory and settlement party","name":"Maryland Public Service Commission","detail":"The Maryland Public Service Commission was part of the 2025 settlement supporting continued Brandon Shores operation under the RMR structure.","official_url":"https://www.psc.state.md.us/"} — Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 · confidence: medium
- Commercial parties.9: {"relationship":"Boiler OEM","name":"Babcock & Wilcox","detail":"The original natural-circulation, balanced-draft boilers for both units were supplied by Babcock & Wilcox.","official_url":"https://www.babcock.com/"} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: high
- Commercial parties.10: {"relationship":"Steam-turbine OEM","name":"General Electric","detail":"The original steam turbines were General Electric tandem-compound, double-flow reheat units with double-flow low-pressure turbines.","official_url":"https://www.ge.com/"} — Top Plant: Brandon Shores Generating Station, Pasadena, Maryland · confidence: high

## Timeline

- 1984 (Unit 1); 1991 (Unit 2) — Commercial operation
  Brandon Shores entered commercial operation.
  Source: Source (https://talenenergy.com/plant/brandon-shores-power-plant)
- 2009-12 — Unit 1 air-quality retrofit completion
  The Unit 1 portion of Constellation's Brandon Shores air-quality-control project was completed in December 2009.
  Source: Top Plant: Brandon Shores Generating Station, Pasadena, Maryland (https://www.powermag.com/top-plantbrandon-shores-generating-station-pasadena-maryland/)
- 2010-03 — Air-quality-control project completed
  Constellation announced completion of the Brandon Shores AQCS project on March 1, 2010. The approximately $885 million project brought both units into compliance with Maryland's Healthy Air Act and included FGD, fabric filters, mercury controls, and related systems.
  Source: Top Plant: Brandon Shores Generating Station, Pasadena, Maryland (https://www.powermag.com/top-plantbrandon-shores-generating-station-pasadena-maryland/)
- 2012 — Acquisition closed
  Exelon sold Brandon Shores Generating Station to Raven Power Holdings LLC (Riverstone Holdings subsidiary) for $178.35 million in 2012. This was the plant-specific allocation from the $400 million portfolio sale of three Maryland stations (Brandon Shores, H. A. Wagner, C. P. Crane). Arm's-length transaction completed as divestiture condition for Exelon–Constellation Energy merger regulatory approval.
  Source: Price tag of $720 million to keep Brandon Shores and Wagner power plants open imposes unreasonable costs on customers, OPC tells federal regulators (https://content.govdelivery.com/accounts/MDOPC/bulletins/3d3e5c3)
- 2012-08-09 — Sale agreement announced
  Exelon agreed to sell Brandon Shores and the C. P. Crane and H. A. Wagner stations to Raven Power Holdings LLC, a new Riverstone portfolio company, for approximately $400 million in aggregate.
  Source: Brandon Shores Generating Station - Global Energy Monitor (https://www.gem.wiki/Brandon_Shores_Generating_Station)
- 2015-06-01 — Talen ownership assumed
  Talen Energy assumed ownership of the plant under Riverstone Holdings' ownership structure.
  Source: Brandon Shores Generating Station - Global Energy Monitor (https://www.gem.wiki/Brandon_Shores_Generating_Station)
- 2020-11 — Coal-retirement plan announced
  Talen announced plans to end coal-fired generation at Brandon Shores by the end of 2025, subject to regulatory approval.
  Source: Brandon Shores Generating Station - Global Energy Monitor (https://www.gem.wiki/Brandon_Shores_Generating_Station)
- 2025-01-27 — RMR settlement announced
  Talen, PJM, the Maryland Public Service Commission, Maryland customers, utilities, and the Sierra Club reached a settlement to keep Brandon Shores operating beyond its scheduled retirement date.
  Source: Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26 (https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-other-parties-reach-reliability-must-run-settlement)
- 2025-06-01 — Scheduled retirement deferred
  The scheduled June 1, 2025 retirement did not end operations; the units continued under the reliability-must-run arrangement.
  Source: Brandon Shores Power Plant - Talen Energy (https://www.talenenergy.com/plant/brandon-shores-power-plant/)
- 2029-05-31 — Planned RMR operating end
  The RMR agreement provides for continued operation of Brandon Shores through May 31, 2029 to support Baltimore-area grid and transmission reliability.
  Source: Brandon Shores Generating Station - Global Energy Monitor (https://www.gem.wiki/Brandon_Shores_Generating_Station)

## Sources

- [Brandon Shores Power Plant - Talen Energy](https://www.talenenergy.com/plant/brandon-shores-power-plant/) — talenenergy.com · tier other
- [eLibrary | Docket Search Results](https://elibrary.ferc.gov/eLibrary/docketsheet?docket_number=ER24-1790) — elibrary.ferc.gov · tier regulatory
- [Source](https://dnr.maryland.gov/pprp/Documents/Case-9748-BGE-Brandon-Shores-Project-Fact-Sheet-8-30-24.pdf) — dnr.maryland.gov · tier regulatory
- [Brandon Shores Generating Station](https://en.wikipedia.org/wiki/Brandon_Shores_Generating_Station) — en.wikipedia.org · tier other
- [Source](https://talenenergy.com/plant/brandon-shores-power-plant) — talenenergy.com · tier other
- [Top Plant: Brandon Shores Generating Station, Pasadena, Maryland](https://www.powermag.com/top-plantbrandon-shores-generating-station-pasadena-maryland/) — powermag.com · tier other
- [Brandon Shores Generating Station – Maryland – ClearStream](https://www.clearstreameng.com/case-studies/brandon-shores-generating-station-maryland/) — clearstreameng.com · tier other
- [Large-Scale Utility Boiler Manufacturer » Babcock & Wilcox](https://www.babcock.com/home/products-services/steam-generators/utility-scale-boilers) — babcock.com · tier other
- [Steam Turbine Power Plant Solutions](https://www.gevernova.com/gas-power/products/steam-turbines) — gevernova.com · tier other
- [Talen Energy, Other Parties Reach Reliability Must Run Settlement Agreement for Brandon Shores and H.A. Wagner Power Plants | Mon, 01/27/2025 - 16:26](https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-other-parties-reach-reliability-must-run-settlement) — ir.talenenergy.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/9466/000119312515049964/d858551d10k.htm) — sec.gov · tier regulatory
- [Brandon Shores Generating Station - Global Energy Monitor](https://www.gem.wiki/Brandon_Shores_Generating_Station) — gem.wiki · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1622536/000162253616000111/tln-20151231x10k.htm) — sec.gov · tier regulatory
- [August 11 BGE Load Shed Event](https://www.pjm.com/-/media/DotCom/committees-groups/committees/oc/2025/20250911/20250911-item-04---bge-load-shed-event.pdf) — pjm.com · tier other
- [FERC Approves Reliability Must Run Settlement Agreement for Units at Talen Energy’s Brandon Shores and H.A. Wagner Power Plants | Thu, 05/01/2025 - 18:00](https://ir.talenenergy.com/news-releases/news-release-details/ferc-approves-reliability-must-run-settlement-agreement-units) — ir.talenenergy.com · tier other
- [BESS Technical Viability – Wagner and Brandon Shores Retirements](https://www.pjm.com/-/media/DotCom/library/reports-notices/special-reports/2024/20240503-bess-technical-viability-wagner-and-brandon-shores-retirements-study.pdf) — pjm.com · tier other
- [Brandon Shores Retirement Mitigation FAQ](https://www.goodenergyinprogress.com/wp-content/uploads/2025/05/BGE-BSRMP-FAQs-FINAL.pdf) — goodenergyinprogress.com · tier other

## Data quality

- Capacity figures use different conventions: EIA and Talen report 635 MW and 638 MW of net summer capacity, totaling 1,273 MW, while other sources cite approximately 1,370 MW of nominal capacity. The major 2009-2010 capital project was an air-quality-control retrofit, including flue-gas desulfurization, baghouses, mercury controls, and related systems; it was not a generation-capacity expansion or documented repowering. The approximately $400 million figure relates to Exelon's three-plant Maryland portfolio sale to Raven Power. Exelon's SEC filing reports approximately $371 million of net proceeds after purchase-price adjustments; neither figure is a Brandon Shores-only allocation. The RMR payments are operating compensation and expense reimbursements, not project-financing proceeds. No separate Brandon Shores project-financing debt or equity package is identified in the cited records.

---

Canonical page: https://askthegrid.com/assets/facilities/brandon-shores

Source: Ask the Grid — https://askthegrid.com/