ERCOT asset profile · https://askthegrid.com/assets/facilities/brazoria-west

Shikun & Binui Energy (S&B USA) · Brazoria County · ERCOT

Brazoria West is a solar power facility with 200 MW of EIA-reported operating capacity in Brazoria County, Texas, registered as EIA Plant ID 64447. Brazoria West Solar Project, LLC is the registered plant entity or operator. Project filings list 397,000 solar panels for the facility.

## Profile

- **Grid role:** Utility-scale solar generation in ERCOT's energy-only market.
- **Context:** Brazoria West is described by the Shikun & Binui Energy group as that firm’s largest solar PV project.
- **Physical build:** Ground-mounted utility-scale photovoltaic project (260 MWdc / 200 MWac), sited on ~1,100–1,290 acres in Brazoria County, TX; project documentation lists photovoltaic solar panel modules (approx. 397,000 panels), DC-to-AC inverters, tracker racking systems, medium- and high-voltage collection, substation and gen‑tie. Talesun Solar announced a contract to supply 222 MW of bifacial modules to the Brazoria West project.

## Metrics

- **Reported capacity:** 200 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Solar Photovoltaic — Primary generation technology.
- **Registry anchor:** Plant 64447 — Brazoria West Solar Project, LLC · Brazoria County · ERCOT
- **Operating status:** Operating — Brazoria West is operating.
- **Resource stack:** 2 resources — WES_UNIT1 · WES_UNIT2

## Facts

- **Reported capacity:** 200 MW — Solar Photovoltaic · confidence: high
- **Operating status:** operating — Brazoria West is operating. · confidence: medium
- **Location:** Brazoria County — ERCOT · confidence: high
- **Operator:** Brazoria West Solar Project, LLC · confidence: high
- **Asset role:** solar — ERCOT · Brazoria County
- **Owner:** Brazoria West Solar Project, LLC — Therefore the owner_name field is assigned to that EIA-registered project company. · confidence: high
- **Commercial operation:** 2022 · confidence: medium

## Related parties

- **Operator:** Brazoria West Solar Project, LLC — Owner / developer associated with Brazoria West.
- **Financier:** Shikun & Binui Energy (S&B USA) — Owner / developer associated with Brazoria West. ([source](https://www.shikunusa.com/))

## Sources

- [Monthly Outlook for Resource Adequacy (MORA)](https://www.ercot.com/files/docs/2023/10/10/MORA_December2023_v2.pdf) — ercot.com · regulatory — Oct 10, 2023 — WES_UNIT1. BRAZORIA. SOLAR. COASTAL. 2022. 101.6. 101.6. 981 WESTORIA SOLAR U2. WES_UNIT2. BRAZORIA. SOLAR. COASTAL. 2022. 101.6. 101.6. 982
- [Forecasted Capacity](https://www.ercot.com/files/docs/2023/03/08/SARA_Spring2023.xlsx) — ercot.com · regulatory — Mar 8, 2023 — BCH_UNIT1 BRAZORIA GAS-GT COASTAL 2022
- [Shikun & Binui Acquire Savion's Brazoria West Solar...](https://savionenergy.com/shikun-binui-acquire-savions-brazoria-west-solar-project-in-texas/) — savionenergy.com · other — Shikun & Binui USA has acquired 100% of the rights for the development of the 260 megawatts (MWdc) (200 MWac) Brazoria West Solar Project from Savion.
- [Savion Signs Agreement to Sell Brazoria West Solar...](https://savionenergy.com/savion-signs-agreement-to-sell-brazoria-west-solar-project-to-shikun-binui/) — savionenergy.com · other — S&B USA (previously Shikun and Binui America) has signed a definitive agreement to acquire 100% of. Brazoria West Solar Project with 260 megawatts (MWdc)
- [Solar project completes construction in west Brazoria County](https://communityimpact.com/pearland-friendswood/development/solar-project-completes-construction-in-west-brazoria-county/) — communityimpact.com · other — Jan 3, 2023 — The 260-megawatt Brazoria West Solar Project completed construction in late 2022, beginning to generate power in November, commercial power
- [Shikun Binui Energy Finishes Construction And Closes On Debt And Tax Equity Financing](https://shikunusa.com/blog/shikun-binui-energy-finishes-construction-and-closes-on-debt-and-tax-equity-financing) — shikunusa.com · other — Dec 15, 2022 — Shikun & Binui Energy has completed the construction of the 260 megawatts (MWdc) (200 MWac) Brazoria West Solar Project, acquired from Savion

---

Canonical page: https://askthegrid.com/assets/facilities/brazoria-west
Website: [Shikun & Binui Energy (S&B USA)](https://www.shikunusa.com/blog/shikun-binui-energy-finishes-construction-and-closes-on-debt-and-tax-equity-financing)
Profile published: 2026-07-17T03:34:03.483Z
Source: Ask the Grid — https://askthegrid.com/