# Chirisa Lancaster AI Hub East Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/chirisa-lancaster-ai-hub-east-data-center-campus--grid-load-079d451d0d9b2a8d

Lancaster AI Hub East is a two-building AI data center development at 216 Greenfield Road in Lancaster, Pennsylvania, built inside part of a former printing plant. CoreWeave is the announced tenant. Reports describe 100 MW of use when the first building opens and 300 MW when the second opens. A PPL Electric filing for an adjacent 138 kV switchyard cites an initial load of 130 MW rising to approximately 350 MW by 2028, though the order does not name the customer. Phase one is under construction; the only generation documented on site is diesel emergency backup.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 216 Greenfield Road, Lancaster, Lancaster County, PA
- Owner: Greenfield Road Owner, LLC (exact asset)
- Owner: LPE 01 PROPCO LLC (exact asset)
- Operator: Greenfield Road Owner, LLC (exact asset)
- Developer: Chirisa Technology Parks (exact asset)
- Developer: Machine Investment Group (exact asset)
- Tenant: CoreWeave (exact asset)

## Power and grid context

- Reported it power: 100 MW · reported · exact asset — Initial capacity announced for the tenant data center
- Reported it power: Up to 300 MW · reported · exact asset — Potential expansion capacity announced for the tenant data center
- Reported unspecified: 100 MW · target · exact asset — Expected electricity use when the first building opens
- Reported unspecified: 300 MW · target · exact asset — Expected electricity use when the second building opens
- Available power: 130 MW · reported · exact asset — Developer-listed utility power for the first building, undated marketing
- Available power: 220 MW · target · exact asset — Developer-listed utility power for the second building
- ISO/RTO: PJM
- Electric utility: Ppl Electric Utilities Corp
- Substation: New 138 kV Pitney Switchyard built by PPL Electric next to the site

## Compute and operations

- Announced tenants: CoreWeave

## Sources

- [Weigh in now on air quality plan for Lancaster city data center's second phase | Local News | lancasteronline.com](https://lancasteronline.com/news/local/weigh-in-now-on-air-quality-plan-for-lancaster-city-data-centers-second-phase/article_1936048d-2651-4fac-ace9-f38f8287d625.html)
- [PA Bulletin, Doc. No. 26-1417a](https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-39/1417a.html)
- [Just a moment...](https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/)
- [Open House Tuesday for PPL upgrades near Lancaster city data center | Local News | lancasteronline.com](https://lancasteronline.com/news/local/open-house-tuesday-for-ppl-upgrades-near-lancaster-city-data-center/article_1e713a88-2912-4a76-af0d-8305457468a0.html)
- [Chirisa Technology Parks |](https://chirisatechnologyparks.com/)
- [Data center noise a concern for Lancaster city Planning Commission | Local News | lancasteronline.com](https://lancasteronline.com/news/local/data-center-noise-a-concern-for-lancaster-city-planning-commission/article_922d4926-885c-4e38-b2a5-1c1fdd9673cc.html)
- [https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1527342[36-05169A]_Issued_v2.pdf](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1527342[36-05169A]_Issued_v2.pdf)
- [www.puc.pa.gov](https://www.puc.pa.gov/pcdocs/1944243.pdf)
- [Chirisa Technology Parks | Blue Owl and Chirisa Technology Parks Close $4 Billion Joint Venture Partnership Including Machine Investment Group for Lancaster Campus - Chirisa Technology Parks](https://chirisatechnologyparks.com/blue-owl-and-chirisa-technology-parks-close-4-billion-joint-venture-partnership-including-machine-investment-group-for-lancaster-campus/)
- [www.srbc.gov](https://www.srbc.gov/waav/search/GetPending?documentType=Application&isABRe=false&projectNumber=2025-128)
- [www.cityoflancasterpa.gov](https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Lancaster-CBA-Draft.pdf)
- [Attention Required! | Cloudflare](https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx)
- [Facility Profile Report | TRI Explorer | US EPA](https://enviro.epa.gov/triexplorer/release_fac_profile?FLD=&FLD=RELLBY&FLD=TSFDSP&OFFDISPD=&ONDISPD=&OTHDISPD=&OTHOFFD=&TRI=17601RRDNN216GR&TRILIB=TRIQ1&V_NA_INDICATOR=.&YEAR=2020)
- [https://lancastercountyplanning.org/DocumentCenter/View/8828/81-250-2A--Lancaster-AI-Hub-CJL](https://lancastercountyplanning.org/DocumentCenter/View/8828/81-250-2A--Lancaster-AI-Hub-CJL)
- [https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-76.256%2C40.049&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false](https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-76.256%2C40.049&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false)

---

Canonical page: https://askthegrid.com/assets/facilities/chirisa-lancaster-ai-hub-east-data-center-campus--grid-load-079d451d0d9b2a8d
Profile generated: 2026-11-02T18:55:37.810765Z
Source: Ask the Grid — https://askthegrid.com/
