# Chirisa Piscataway PNJ-01/-02

PJM data center · https://askthegrid.com/assets/facilities/chirisa-piscataway-pnj-01-02

Chirisa Piscataway PNJ-01/-02 is a campus data center in Piscataway, Middlesex, NJ. Chirisa Technology Parks is identified as the operator, and the facility is proposed. It is identified as part of Standalone campus (no parent campus name found in reviewed sources). Spatial service-territory evidence associates the site with Public Service Electric & Gas (PSE&G); the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.

## Identity and location

- Operating status: proposed
- Asset scope: campus
- Location: 201 Centennial Ave, Piscataway, Middlesex County, NJ
- Operator: Chirisa Technology Parks (exact asset) — https://chirisatechnologyparks.com/

## Power and grid context

- ISO/RTO: PJM
- Balancing authority: PJM
- Electric utility: Public Service Electric & Gas (PSE&G)

## Development

- Site status: proposed
- Site area: 20 acres
- Construction: Chirisa Piscataway PNJ-01/-02 is a planned 20‑acre data center campus at 201 Centennial Ave, Piscataway, NJ, with 90 MW of utility power scheduled by mid‑2026 and commercial operation targeted for 2027. Construction is expected to start in 2024 and the project is currently in the proposed stage.

## Compute and operations

- Facility classes: hyperscale, ai_hpc, colocation, mixed
- Workloads: hyperscale compute, AI / HPC workloads, colocation / bare-metal hosting
- Critical IT load: 90 MW
- Operating context: Planned / proposed 20-acre Chirisa Technology Parks Piscataway campus (PNJ-01 / PNJ-02). Site description: adaptive reuse of an existing building shell plus adjacent two-story greenfield development; operator: Chirisa Technology Parks. Announced power capacity: 90 MW of utility power (announced target by mid-2026). Status: reserved/planned (targeted delivery in 2027 per project disclosures).

## Sources

- [http://baxtel.com/data-center/chirisa-piscataway](http://baxtel.com/data-center/chirisa-piscataway)
- [http://chirisatechnologyparks.com/](http://chirisatechnologyparks.com/)
- [http://digital-fortress.com/piscataway-data-center](http://digital-fortress.com/piscataway-data-center)
- [http://marketplace.upstack.com/data-centers/digital-fortress-data-center-new-jersey](http://marketplace.upstack.com/data-centers/digital-fortress-data-center-new-jersey)
- [http://morethanjustparks.com/data-center-tracker/coresite-ny3-nj--c872f29a-9d74-4901-9bba-9dee2c6aa87b](http://morethanjustparks.com/data-center-tracker/coresite-ny3-nj--c872f29a-9d74-4901-9bba-9dee2c6aa87b)
- [Chirisa: Piscataway Data Center](https://baxtel.com/data-center/chirisa-piscataway)
- [Acquisition of 4MW New Jersey data center - Chirisa](https://chirisa.com/201b-centennial-avenue-data-center/)
- [Chirisa Technology Parks |](https://chirisatechnologyparks.com/)
- [Piscataway Data Center Locations Map](https://cloudandcolocation.com/city/piscataway/)
- [Digital Fortress · 201B Centennial Avenue](https://datacenterhawk.com/marketplace/providers/digital-fortress/201b-centennial-avenue/1045884)
- [Chirisa PNJ-01 / PNJ-02 Piscataway Campus: 90 MW](https://servercountry.org/data/projects/chirisa-pnj-01-pnj-02-piscataway-campus-nj/)
- [Chirisa acquires two data centers in Washington and New ...](https://www.datacenterdynamics.com/en/news/chirisa-acquires-two-data-centers-in-washington-and-new-jersey-expands-existing-sites-in-virginia-and-illinois/)
- [Digital Fortress Data Center in Piscataway, NJ](https://www.datacenters.com/digital-fortress-new-jersey-pnj)
- [Chirisa Technology Parks Data Centers Locations (5)](https://www.datacenters.com/providers/chirisa-technology-parks/data-center-locations)
- [201 Centennial Ave, Piscataway, NJ 08854](https://www.zillow.com/homedetails/201-Centennial-Ave-Piscataway-NJ-08854/248884869_zpid/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---