# Chirisa Technology Parks Meadowville Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/chirisa-technology-parks-meadowville-data-center-campus--grid-load-7bdb2a0739d5e980

The Chirisa Technology Parks campus sits in the Meadowville Technology Park in Chesterfield County, Virginia, with an adjacent expansion called Digital Drive. Chesterfield County lists the original site as three existing buildings plus one under construction, and Digital Drive as two buildings under construction. CoreWeave is the tenant named for the original property. Dominion Energy delivers power to the park and is building the Meadowville substation with the developers. Published figures include 120 MW of new critical facilities under the joint-venture program and 300 MW of secured power for Digital Drive, on different bases that should not be added.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 1401 Meadowville Technology Pkwy, Chester, Chesterfield County, VA
- Operator: Chirisa Richmond LLC (exact asset)
- Owner: Chirisa Richmond LLC (exact asset)
- Owner: CTP-02 PropCo LLC (exact asset)
- Owner: CTP-03 PropCo LLC (exact asset)
- Owner: DDC-01 PropCo LLC (exact asset)
- Owner: DDC-02 PropCo LLC (exact asset)
- Developer: Chirisa Technology Parks (exact asset)
- Developer: PowerHouse Data Centers (exact asset)
- Developer: American Real Estate Partners (exact asset)
- Tenant: CoreWeave (exact asset)

## Power and grid context

- Critical it load: 120 MW · under_construction · target 2026 · exact asset — Initial new critical facilities under the joint-venture program at the campus, delivery scheduled in 2025 and 2026
- Utility service: 300 MW · reported · exact asset — Secured power from the adjacent Meadowville substation for the Digital Drive campus
- Reported unspecified: 100 MW · target · exact asset — First of two Digital Drive buildings
- Reported unspecified: 100 MW · target · exact asset — Second of two Digital Drive buildings
- Available power: 200 MW · target · exact asset — Digital Drive campus power available
- Available power: 100 MW · target · exact asset — Additional Digital Drive campus power
- Reported unspecified: 360 MW · target · exact asset — Developer-listed power for the park
- Utility service: 28 MW · operating · exact asset — CTP-01, listed as fully leased and operational
- Utility service: 120 MW · under_construction · exact asset — CTP-02 and CTP-03, listed as reserved
- Utility service: 200 MW · proposed · exact asset — CTP-04, CTP-05 and CTP-06, reserved for future use
- Critical it load: 27 MW · reported · exact asset — Total critical capacity reported for the 1401 Meadowville Technology Parkway property
- ISO/RTO: PJM
- Electric utility: Dominion Energy Inc
- Substation: Adjacent Meadowville substation under construction in partnership with Dominion Energy, supplying Digital Drive

## Development

- Site status: Original campus has three existing buildings and one under construction; the adjacent Digital Drive has two buildings under construction

## Compute and operations

- Announced tenants: CoreWeave
- Critical IT load: 120 MW

## Sources

- [Data Centers | Chesterfield County, VA](https://www.chesterfield.gov/datacenters)
- [Chirisa Technology Parks | Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers Announce Next Phase of $5 Billion Joint Venture Development Partnership - Chirisa Technology Parks](https://chirisatechnologyparks.com/blue-owl-chirisa-technology-parks-and-powerhouse-data-centers-announce-next-phase-of-5-billion-joint-venture-development-partnership/)
- [Chirisa Technology Parks | Chirisa Technology Parks and PowerHouse Data Centers to Launch Next-Generation Hyperscale Campus in Chesterfield County - Chirisa Technology Parks](https://chirisatechnologyparks.com/chirisa-technology-parks-and-powerhouse-data-centers-to-launch-next-generation-hyperscale-campus-in-chesterfield-county/)
- [New data centers eye vacated site in Chesterfield | GRPVA.com](https://www.grpva.com/news/two-new-data-centers-on-vacated-site-in-chesterfield-county/)
- [Chirisa Technology Parks |](https://chirisatechnologyparks.com/)
- [Brookfield Lends $200M on Chirisa’s Latest Data Center Development &#8211; Commercial Observer](https://commercialobserver.com/2023/09/brookfield-lends-200m-on-chirisas-latest-data-center-development/)
- [Two new data centers to rise on formerly stalled Cartograf site in Chesterfield - Richmond BizSense](https://richmondbizsense.com/2026/01/05/two-new-data-centers-to-rise-on-formerly-stalled-cartograf-site-in-chesterfield/)
- [https://deq.zh-cn.virginia.gov/home/showpublisheddocument/25658/638882565564200000](https://deq.zh-cn.virginia.gov/home/showpublisheddocument/25658/638882565564200000)
- [https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/about/power-line-projects/meadowville/pdfs/meadowville-order-notice-hearing.pdf?hash=9C1514CA20C9522877CA3C5859B241C8&rev=68f1695da9c74e7e87623a86464db365](https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/about/power-line-projects/meadowville/pdfs/meadowville-order-notice-hearing.pdf?hash=9C1514CA20C9522877CA3C5859B241C8&rev=68f1695da9c74e7e87623a86464db365)
- [https://apps.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_REG_NUM%3D52432&outFields=*&outSR=4326&f=pjson](https://apps.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_REG_NUM%3D52432&outFields=*&outSR=4326&f=pjson)
- [Roads and Infrastructure in Meadowville Technology Park &#8211; Meadowville Technology Park](https://meadowville.com/roads-and-infrastructure-in-meadowville-technology-park/)

---