# CHRISTUS DATA CENTER

ERCOT data center · https://askthegrid.com/assets/facilities/christus-data-center

CHRISTUS Health owns and operates the CHRISTUS Data Center at 10002 Rogers Run, San Antonio, a Tier 3 enterprise facility on 10 acres with 47,000 gross square feet: 15,000 square feet of data-center white space, 20,000 of office space, and 12,000 of electrical support. The facility, serving enterprise healthcare IT and communications operations, cost $21 million and draws from Karnes Electric Cooperative.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 10002 Rogers Run, San Antonio, Bexar County, TX
- Owner: CHRISTUS Health (exact asset) — https://www.christushealth.org/
- Operator: CHRISTUS Health (exact asset) — https://www.christushealth.org/
- Design firm: Chesney Morales (phase)

## Power and grid context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: Karnes Electric Cooperative, Inc.

## Development

- Site status: Operating
- Site area: 10 acres
- Gross floor area: 47,000 square feet
- Construction: The CHRISTUS Data Center is a Tier 3, 47,000-square-foot facility comprising 15,000 square feet of data-center white space, 20,000 square feet of office space, and 12,000 square feet of electrical-support space. The associated CHRISTUS ITC Phase I regulatory project was a renovation/alteration at 10002 Rogers Run, with a scheduled construction period from July 1, 2012 through December 1, 2012; the permit record is closed.

## Compute and operations

- Facility classes: enterprise
- Workloads: enterprise healthcare IT and information-management systems, LAN/WAN, network, server, and data/voice communications operations
- Operating context: Operating CHRISTUS enterprise healthcare data center in San Antonio. DPR describes a 47,000-square-foot facility containing 15,000 square feet of data-center white space, 20,000 square feet of office space, and 12,000 square feet of electrical-support space, with Security Operations and Network Operations Centers.

## Sources

- [http://datacenterdynamics.com/en/news/new-health-care-data-center-set-for-san-antonio](http://datacenterdynamics.com/en/news/new-health-care-data-center-set-for-san-antonio)
- [http://dpr.com/projects/christus-data-center](http://dpr.com/projects/christus-data-center)
- [http://tdlr.texas.gov/TABS/Search/Print/EABPRJB2813522](http://tdlr.texas.gov/TABS/Search/Print/EABPRJB2813522)
- [Information Technology Engineer I - IM Data Center Operations in San Antonio, TX at CHRISTUS Health. #343720](https://careers.christushealth.org/opportunity/information-technology-engineer-i-im-data-center-operations-343720)
- [IT Engineer I - Data Center Operations at CHRISTUS Ministry System Office (229248) | CHRISTUS Health Careers](https://careers.christushealth.org/opportunity/job-apply/it-engineer-i-data-center-operations-229248)
- [CHRISTUS Health - "Saved Millions in Hardware Costs!" - Condusiv Technologies](https://condusiv.com/case_studies/case-studies-christus-health/) — Condusiv Technologies · 2025-07-24
- [TCEQ App](https://permit-search.tceq.texas.gov/)
- [CHRISTUS ITC PHASE I - San Antonio, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/christus-itc-phase-i-c08bad96)
- [New health care data center set for San Antonio - DCD](https://www.datacenterdynamics.com/en/news/new-health-care-data-center-set-for-san-antonio/) — Data Center Dynamics · 2007-05-17
- [CHRISTUS Healthcare Data Center | DPR Construction](https://www.dpr.com/projects/christus-data-center) — DPR Construction
- [How it Works: The Role of a Balancing Authority](https://www.energy.gov/sites/default/files/2023-08/Balancing%20Authority%20Backgrounder_2022-Formatted_041723_508.pdf)
- [Electric Reliability Council of Texas](https://www.ercot.com/)
- [Why San Antonio's far West Side is a hot spot for data centers](https://www.expressnews.com/business/real-estate/article/sanantonio-data-centers-west-18285270.php)
- [10002 Rogers Run # 2, San Antonio, TX 78251 - HAR.com](https://www.har.com/homedetail/10002-rogers-run-2-san-antonio-tx-78251/8967404)
- [Real Estate Listing by Rogers Rd, San Antonio, TX - HAR.com](https://www.har.com/rogers-rd-san-antonio-tx/real-estate-by-street)
- [Service Map - Karnes Electric Cooperative](https://www.karnesec.org/service/service-map/)
- [Petition to save Cedar Creek Lake from data centers gains ...](https://www.ketk.com/energy-and-infrastructure-texas/data-centers/petition-to-save-cedar-creek-lake-from-data-centers-gains-over-2k-signatures/)
- [Building Permits Granted Development Services ...](https://www.sanantonio.gov/portals/0/files/dsd/pastgranted/2014/2014-01-25.pdf)
- [Christus Health, Southwest Care Center warn patients of ...](https://www.santafenewmexican.com/news/local_news/christus-health-southwest-care-center-warn-patients-of-possible-data-security-incidents/article_6bb79b0d-45c4-4ecb-841a-f9cb7625773b.html)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/EABPRJB2813522)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/EABPRJB2813522)

## Data quality

- The exact facility is supported by the Texas regulatory record for CHRISTUS ITC Phase I at 10002 Rogers Run, San Antonio, and by DPR’s project page for the CHRISTUS Healthcare Data Center.
- The available community-benefit evidence is primarily operational and healthcare-service related; no site-specific public economic-benefit commitment, community investment, or neighborhood-benefit program was identified.
- The 2007 trade article describes the planned project as a 43,000-square-foot facility, while DPR later describes the completed facility as 47,000 square feet. These figures should not be treated as interchangeable.
- No MW, water-use, PUE, WUE, building-count, tenant, equipment, or commercial-term claims are made because the reviewed exact-site sources do not substantiate them.
- Search results about other San Antonio data centers, including CyrusOne, and unrelated CHRISTUS litigation were excluded from the exact-site findings.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/christus-data-center
Profile generated: 2026-07-27T23:57:57.148833Z
Source: Ask the Grid — https://askthegrid.com/
