# Cipher Digital Odessa

ERCOT data center · https://askthegrid.com/assets/facilities/cipher-digital-odessa

Cipher Digital (formerly Cipher Mining) operates a bitcoin mining facility at 2200 E I-20 in Odessa, Ector County, Texas. The company lists Odessa at 207 MW with about 11.6 EH/s of operating hashrate; mining began in November 2022, ten months after groundbreaking. Odessa runs on a long-term fixed-price power contract that lets Cipher mine or resell power to the grid, and Cipher reports those power sales monthly. Cipher commits to curtail load during ERCOT grid emergencies under Senate Bill 6.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 2200 E I-20, Odessa, Ector County, TX
- Operator: Cipher Digital (exact asset) — https://www.cipherdigital.com

## Power and grid context

- Reported unspecified: 207 MW · reported · exact asset — Operator lists Odessa at 207 MW of operating capacity for bitcoin mining (~11.6 EH/s); basis unspecified.

## Development

- Construction: Cipher began bitcoin mining at Odessa in November 2022, about ten months after breaking ground; a TDLR filing covers a 6,500 sq ft O&M office building with 180 unoccupied shipping containers and electrical equipment.

## Compute and operations

- Facility classes: crypto_mining
- Operating context: Odessa is Cipher Digital's remaining operating bitcoin mining site, listed at 207 MW and about 11.6 EH/s of operating hashrate.

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/address?street=2200+E+I-20&city=Odessa&state=TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Cipher Mining Provides Third Quarter 2022 Business Update](https://investor.wedbush.com/wedbush/article/gnwcq-2022-11-14-cipher-mining-provides-third-quarter-2022-business-update)
- [Cipher Mining Commences Bitcoin Mining at Odessa Data Center](https://investor.wedbush.com/wedbush/article/gnwcq-2022-11-29-cipher-mining-commences-bitcoin-mining-at-odessa-data-center)
- [Cipher Mining Announces July 2023 Operational Update](https://investor.wedbush.com/wedbush/article/gnwcq-2023-8-1-cipher-mining-announces-july-2023-operational-update)
- [Cipher Digital Supports Governor Abbott's Push for Transparency and Accountability in Texas Data Center Growth](https://investor.wedbush.com/wedbush/article/gnwcq-2026-8-10-cipher-digital-supports-governor-abbotts-push-for-transparency-and-accountability-in-texas-data-center-growth)
- [Infrastructure | Cipher Digital](https://www.cipherdigital.com/infrastructure)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022013592)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/cipher-digital-odessa