Corazon Energy LLC is a solar power facility with 200 MW of EIA-reported operating capacity in Webb County, Texas, registered as EIA Plant ID 64538. Corazon Energy LLC is the registered plant entity or operator. Project filings list 658,000 solar panels and 66 inverters for the facility.

## Profile

- **Grid role:** Utility-scale solar generation in ERCOT's energy-only market.
- **Grid connection:** Corazon Solar 345-kV Substation · 345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station.
- **Context:** BayWa r.e. described Corazon I as among the largest projects in Texas, producing more than 500 GWh annually and materially supported by a dedicated $216.1 million construction financing facility that included a $62.9 million loan from the North American Development Bank.
- **Physical build:** Corazon I (Corazon Energy LLC, EIA 64538) is a 200 MW AC utility-scale solar PV park on ~2,000 acres in Webb County, TX. Project documentation (NADB / BayWa r.e.) states the scope includes approximately 658,000 bifacial monocrystalline PV modules (nominal 400–410 W each) mounted on single-axis tracking arrays, 66 inverters collecting to 34.5 kV, underground collection cables, one step-up substation to 345 kV and a ~3.7-mile aerial transmission line to the ETT Lobo 345 kV station. (NADB procurement/engineering documents list construction start July 2020 and expected commercial operation August 2021; BayWa r.e. and press coverage confirm 266 MWdc / 200 MWac nameplate and commissioning in 2021.)
- **Financing:** A construction credit agreement of up to $216.1 million was arranged in April 2021 to finance design, construction and operation of the 200 MW AC Corazon project; the North American Development Bank (NADB) participated with a $62.9 million loan and served as coordinating lead arranger alongside a syndicate of three other lenders.

## Metrics

- **Reported capacity:** 200 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Solar Photovoltaic — Primary generation technology.
- **Registry anchor:** Plant 64538 — Corazon Energy LLC · Webb County · ERCOT
- **Operating status:** Operating — Corazon Energy LLC is operating.
- **Grid connection:** Corazon Solar 345-kV Substation — 345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station
- **Equipment:** 658,000 panels / 66 inverters — Installed equipment documented in public project records.
- **Project financing:** $216.1M — A construction credit agreement of up to $216.1 million was arranged in April 2021 to finance design, construction and operation of the 200 MW AC Corazon project; the North American Development Bank (NADB) participated with a $62.9 million loan and served as coordinating lead arranger alongside a syndicate of three other lenders.

## Facts

- **Reported capacity:** 200 MW — Solar Photovoltaic · confidence: high
- **Operating status:** operating — Corazon Energy LLC is operating. · confidence: medium
- **Interconnection:** Corazon Solar 345-kV Substation — 345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station · confidence: medium
- **Location:** Webb County — ERCOT · confidence: high
- **Operator:** Corazon Energy LLC · confidence: high
- **Asset role:** solar — ERCOT · Webb County

## Related parties

- **Operator:** Corazon Energy LLC — Owner / developer associated with Corazon Energy LLC. ([source](https://www.corazonenergystorage.com/))
- **Financing arranger:** North American Development Bank (NADB) — Participated in the construction facility with a $62.9 million loan and served as coordinating lead arranger for the up-to-$216.1 million credit agreement signed in April 2021. ([source](https://www.nadb.org/))

## Sources

- [Monthly Outlook for Resource Adequacy (MORA)](https://www.ercot.com/files/docs/2026/05/01/MORA_July2026.pdf) — ercot.com · regulatory — May 1, 2026 — CORAZON_UNIT1. WEBB. SOLAR. SOUTH. 2021. 202.6
- [Corazon Energy Storage](https://www.corazonenergystorage.com/) — corazonenergystorage.com · other — Corazon Energy Storage (Corazon) is ideally located in Albuquerque, New Mexico on approximately 10 acres of undeveloped land
- [corazonenergystorage.com](https://corazonenergystorage.com/) — corazonenergystorage.com · other — Corazon Energy Storage (Corazon) is ideally located in Albuquerque, New Mexico on approximately 10 acres of undeveloped land
- [Sustainable Renewable Energy Development – BayWa r.e.](https://baywa-re.com/en/news/baywa-r-e-sells-corazon-i-and-guajillo) — baywa-re.com · other — We are a leading integrated global renewable energy
- [O&M key to keeping solar power productive](https://www.altenerg.com/back_issues/story.php?sid=2703) — altenerg.com · other — BayWa r.e. developed, engineered and constructed the 2,000 acre, 266 MWdc/200 MWac Corazon I solar project which has been operating since August 2021
- [Draft Bd 2020 Xx Corazon Ene Certification Proposal Public Eng Final](https://nadbank.org/hubfs/projects/draft_bd_2020_xx_corazon_ene_certification_proposal_public_eng_final.pdf?hsLang=en) — nadbank.org · other — Figure 5 shows the location of the main components within the project area, as well as the location of the transmission line and interconnection substation. **Figure 5** **PROJECT LAYOUT** **3.1.3. Technical Feasibility**. The Commercial Operation Date (COD) is expected to occur no later than August 2021

---

Canonical page: https://askthegrid.com/assets/facilities/corazon-energy-llc
Website: [Eni New Energy US Inc.](https://www.eni.com/)
Profile published: 2026-07-17T03:34:10.192Z
Source: Ask the Grid — https://askthegrid.com/