CoreSpace, Inc. operates CoreSpace Dallas at 7505 John W Carpenter Freeway, a 30,000-square-foot facility on 1.65 acres that received its certificate of occupancy in April 2009 and became operational in 2011. Reported utility-power figures conflict across sources (2.0–2.5 MW); the facility serves enterprise hosting and critical business applications.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 7505 John W Carpenter Freeway, Dallas, Dallas County, TX
- Operator: CoreSpace, Inc. (exact asset) — https://corespace.com/

## Power and grid context

- Utility service: 2.5 MW · operating · exact asset — Reported utility power available to the exact CoreSpace Dallas facility; this is utility-service capacity, not a critical-IT-load or campus-gross-power figure.
- Utility service: 2 MW · reported · exact asset — Alternative directory-reported power figure for the exact CoreSpace Dallas facility; retained separately because it conflicts with the 2.5 MW utility-power report.
- ISO/RTO: ERCOT
- Electric utility: Oncor

## Development

- Site status: Operating data-center facility as of 2025; CoreSpace's official site lists the Dallas location at 7505 John W Carpenter Fwy.
- Site area: 1.648 acres
- Gross floor area: 30,000 square feet
- Construction: Existing 30,000-square-foot facility with a certificate of occupancy issued in April 2009; third-party facility data describes it as retrofitted. CoreSpace moved into the facility in 2011. No later construction phase at this exact site was identified.

## Compute and operations

- Facility classes: enterprise
- Workloads: enterprise hosting, critical business applications
- Operating context: Operational CoreSpace data center operated by CoreSpace, Inc., occupying 30,000 square feet. CoreSpace describes its facilities as supporting critical business applications on a 24/7/365 basis, with redundant power, cooling, and network capabilities and third-party audits for SSAE-18, HIPAA, and PCI standards.

## Sources

- [http://corespace.com/data-centers](http://corespace.com/data-centers)
- [http://loopnet.com/property/7505-john-w-carpenter-fwy-dallas-tx-75247/48113-00000779119000000](http://loopnet.com/property/7505-john-w-carpenter-fwy-dallas-tx-75247/48113-00000779119000000)
- [CoreSpace Dallas Data Center](https://baxtel.com/data-center/corespace-dallas)
- [Google Red Oak TX Data Center](https://baxtel.com/data-center/google-red-oak-tx)
- [CoreSpace - Dallas Data Center - Cloud and Colocation](https://cloudandcolocation.com/datacenters/corespace-dallas-data-center/)
- [DATA CENTERS - CoreSpace](https://corespace.com/data-centers/)
- [LEGAL](https://corespace.com/legal/)
- [Future Page - Sustainability - CoreSpace](https://corespace.com/sustainability)
- [Certificates of Occupancy April 2009](https://dallascityhall.com/departments/sustainabledevelopment/buildinginspection/DCH%20documents/co_permits/COsIssuedApr2009.pdf)
- [CO 2012](https://dallascityhall.com/departments/sustainabledevelopment/buildinginspection/DCH%20documents/excel/CO%27s%202012.xlsx)
- [Certificate of Occupancy Issued](https://dallascityhall.com/departments/sustainabledevelopment/buildinginspection/DCH%20documents/excel/CO_Jan2012.xls)
- [CITY OF DALLAS 1 CITY PLAN COMMISSION Thursday, ...](https://dallascityhall.com/government/meetings/DCH%20Documents/plan-commission/cpc_agenda_072513.pdf)
- [CoreSpace: Dallas Data Center](https://datacenters.com/corespace-dallas)
- [Corespace Dallas: See All services with pricing](https://inflect.com/building/7505-john-w-carpenter-freeway-dallas/corespace/datacenter/dallas)
- [CoreSpace Dallas: data center in Dallas, TX | Data Center Tracker](https://morethanjustparks.com/data-center-tracker/corespace-dallas-tx--5ba0829c-e4d1-4138-b552-cba7ec575ce8)
- [Corespace, Inc. Vs. Michael Lindell, Frank Speech, Inc., Lindell Management, Llc Lawsuit | Trellis.Law](https://trellis.law/case/48085/471-09130-2025/corespace-inc-vs-michael-lindell-frank-speech-inc-lindell-management-llc)
- [CORESPACE - DALLAS, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/corespace-e7d58a7f)
- [Texas colo firm CoreSpace and data center up for sale - DCD](https://www.datacenterdynamics.com/en/news/texas-colo-firm-corespace-and-data-center-up-for-sale/) — Data Center Dynamics · 2025-06-02
- [CoreSpace Dallas Data Center | CoreSpace, Inc. (2 MW)](https://www.datacentermap.com/usa/texas/dallas/corespace/)
- [CoreSpace Dallas Data Center - Specs](https://www.datacentermap.com/usa/texas/dallas/corespace/specs/)
- [CoreSpace: Dallas Data Center](https://www.datacenters.com/corespace-dallas)
- [Inside D CEO's Closed-Doors Meeting With Dallas ...](https://www.dmagazine.com/publications/d-ceo/2026/may/getting-real-about-downtown-dallas/)
- [7505 John W Carpenter Fwy, Dallas, TX 75247 - APN/Parcel ID: 00000779119000000](https://www.loopnet.com/property/7505-john-w-carpenter-fwy-dallas-tx-75247/48113-00000779119000000/)
- [Hilco Streambank Seeks Offers for Dallas, TX-Based Data Center Business](https://www.prnewswire.com/news-releases/hilco-streambank-seeks-offers-for-dallas-tx-based-data-center-business-302471229.html)

## Data quality

- The exact-site identity is strongly supported by CoreSpace’s official location page, which lists the Dallas facility at 7505 John W Carpenter Freeway, and by trade coverage naming the same address.
- The strongest exact-site news source is Data Center Dynamics’ June 2, 2025 article, which identifies the 7505 John W. Carpenter Fwy facility and discusses its sale.
- A PR Newswire release on the same sale identifies CoreSpace and its Dallas facility but does not state the street address in the retrieved text; it is therefore classified as operator-and-city evidence rather than exact-address evidence.
- CoreSpace’s sustainability page is not reliable evidence of a Dallas-site benefit: the retrieved content primarily reproduces VMware sustainability material and does not identify a CoreSpace Dallas program. Nearby facilities listed by third-party directories were excluded.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/corespace-dallas
Profile generated: 2026-07-27T23:45:57.088200Z
Source: Ask the Grid — https://askthegrid.com/