Tesla operates Cortex 1, an AI-training-compute data center at Gigafactory Texas in Austin, with more than 100,000 H100-equivalent GPUs installed and an initial 50,000-GPU cluster that went live in Q4 2024. The facility requires 130 MW of data-center power and includes 260 MWh of behind-the-meter battery storage plus a 250 MWh front-of-the-meter ERCOT-participating Megapack system. Tesla also operates 15 MW of rooftop solar generation at the broader Giga Texas facility.

## Identity and location

- Operating status: operating
- Asset scope: building
- Location: 13101 Tesla Road, Austin, Travis County, TX
- Operator: Tesla, Inc. (exact asset) — https://www.tesla.com/giga-texas

## Power and grid context

- Critical it load: 130 MW · reported · exact asset · Cortex 1 · as of 2025-05-15 — Reported data-center power/cooling requirement associated with Cortex 1 at Giga Texas; kept separate from campus gross power and Cortex 2.0.
- Battery storage: 130 MW · reported · building · Cortex 1 · as of 2025-05-15 — Behind-the-meter Megapack system reported for the Giga Texas data center, with 260 MWh of storage; the source identifies it as a backup-power installation.
- Battery storage: 125 MW · reported · building · Cortex 1 · as of 2025-05-15 — Front-of-the-meter ERCOT-participating Megapack system reported at the Tesla Giga Texas facility, with 250 MWh; it is described as capable of backup power during a grid outage.
- Onsite generation: 15 MW · reported · campus · as of 2025-05-15 — Rooftop solar capacity reported for the overall Giga Texas facility; the source does not allocate this generation specifically to Cortex.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT

## Development

- Site status: Operating; Tesla's Cortex 1 is listed as in production. The broader Gigafactory Texas campus is reported by Tesla as covering 2,500 acres, but that acreage is not attributed to Cortex 1 specifically.
- Construction: Tesla's Cortex 1 is a dedicated data-center building at Gigafactory Texas. Tesla completed deployment of a 50,000-Nvidia-H100 training cluster during Q4 2024, and Tesla's later reporting lists Cortex 1 as in production with more than 100,000 H100-equivalent capacity. Cortex 2 is a separate subsequent construction phase and is excluded from this record.

## Compute and operations

- Facility classes: ai_hpc
- Workloads: Full Self-Driving (FSD) and autonomous-driving neural-network training, Autonomous-vehicle and fleet-data processing, Optimus humanoid-robot hardware and software training, Real-world AI, perception, planning, and control model development
- Operating context: Tesla-owned, internally operated AI/HPC training cluster at Gigafactory Texas in Austin. The initial Cortex cluster came online in Q4 2024 with 50,000 Nvidia H100 GPUs; Tesla expanded Cortex in 2025. Cortex 2 is a separate subsequent project and is excluded from this record. It is not presented as a retail colocation or third-party cloud facility.

## Sources

- [http://austinio.com/giga-texas-cortex-compute.php](http://austinio.com/giga-texas-cortex-compute.php)
- [http://ercot.com/about](http://ercot.com/about)
- [Fetched web page](https://assets-ir.tesla.com/tesla-contents/IR/TSLA-Q2-2026-Update.pdf)
- [Fetched web page](https://assets-ir.tesla.com/tesla-contents/IR/TSLA-Q4-2025-Update.pdf)
- [Cortex AI Compute at Giga Texas in Austin | Tesla's FSD & ...](https://austinio.com/giga-texas-cortex-compute.php)
- [Tesla Giga Texas Complex | The Multi-Program Anchor of the Austin ...](https://austinio.com/tesla-giga-texas.php)
- [Commissioners voice support for Tesla factory, community investment plan - Austin Monitor](https://austinmonitor.com/stories/2023/10/commissioners-voice-support-for-tesla-factory-community-investment-plan/) — Austin Monitor · 2023-10-30
- [Cortex supercomputer | Data Center | DataCenter Planet](https://datacenterplanet.com/listings/cortex-supercomputer)
- [Cortex supercomputer — Austin, TX, US Data Center | DC Hub](https://dchub.cloud/facilities/cortex-supercomputer-cortex-supercomputer-b48d56b1)
- [Perceptive Automata LLC v. Tesla, Inc.
         2:2025cv00742        | U.S. District Court for the Eastern District of Texas        | Justia](https://dockets.justia.com/docket/texas/txedce/2%3A2025cv00742/239346)
- [Gigafactory Texas](https://en.wikipedia.org/wiki/Gigafactory_Texas)
- [Tesla's 'Cortex' Supercomputer Is What Its Robotaxi Hopes Ride On](https://insideevs.com/news/731363/tesla-cortex-supercomputer-giga-texas/) — InsideEVs · 2024-08-26
- [Giga Texas Energy LLC - PUC Interchange](https://interchange.puc.texas.gov/Documents/53385_2492_1407435.PDF)
- [Tesla Data Center Permits — MLQ Infrastructure](https://mlq.ai/permit-filings/operators/tesla/)
- [Tesla's Cortex AI Supercomputer Cluster Shows Early Potential, Equipped with 50,000 Nvidia H100 GPUs](https://news.aibase.com/news/11373)
- [Fetched web page](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9226673&Rendition=Web)
- [tsla-20251231](https://sec.gov/Archives/edgar/data/1318605/000162828026003952/tsla-20251231.htm)
- [Giga Texas Is Building a Condensation Reclamation Plant](https://www.basenor.com/blogs/news/giga-texas-is-building-a-condensation-reclamation-plant?srsltid=AfmBOoqV1qkLnbYIHCbEWwpRrXlqh2cpxzMJALmUmrlW-sriTrYPZA1S)
- [Inside Tesla's Cortex AI Cooling: The Infrastructure Behind FSD and Op](https://www.basenor.com/blogs/news/inside-teslas-cortex-ai-cooling-the-infrastructure-behind-fsd-and-optimus?srsltid=AfmBOop1_2JhTGvQldG7nq6NsqDyIGRw43CQeb9I-sxjT48ReFSqFqTq6nqDyIGRw43CQeb9I-sxjT48ReFSqFqTq)
- [Texas county approves tax breaks for a new Tesla factory near Austin](https://www.cnbc.com/2020/07/14/texas-county-approves-tax-breaks-for-a-new-tesla-factory-near-austin.html)
- [News North America (EN), Austin - DCD](https://www.datacenterdynamics.com/en/news/?tag=austin&term=north-america&page=2)
- [Tesla’s 50,000 GPU Cortex supercomputer went live in Q4 2024 - DCD](https://www.datacenterdynamics.com/en/news/teslas-50000-gpu-cortex-supercomputer-went-live-in-q4-2024/)
- [Fetched web page](https://www.ercot.com/files/docs/2025/05/15/11-Megapack-at-Data-Centers-_-ERCOT-LLWG_5.16.25_vShare.pdf)
- [GIS Report](https://www.ercot.com/mp/data-products/data-product-details?id=PG7-200-ER)
- [MPO Cables Power Tesla's AI Supercluster Cortex - FSG Networks Limited](https://www.fsgnetworks.com/teslas-cortex-in-austin-uses-mpo-cables-to-power-hyperscale-ai-training/)
- [Tesla's tax rebate agreement with Travis County ...](https://www.kut.org/austin/2025-11-26/austin-tx-tesla-tax-rebate-deal-travis-county)
- [Tesla leaving Austin regulations leads to environmental concerns | kvue.com](https://www.kvue.com/article/news/local/tesla-avoids-texas-law-concerns/269-19de0eff-73c8-4231-891c-0b0a78b9dcf8)
- [Tesla Gigafactory Texas - Austin, TX](https://www.mapquest.com/us/texas/tesla-gigafactory-texas-477508402)
- [Tesla's 'Cortex' supercomputer for FSD being built in Austin, Texas - MarkLines Automotive Industry Portal](https://www.marklines.com/en/news/313480) — MarkLines · 2024-08-27
- [How Elon Musk hopes his new supercomputers will boost ...](https://www.nbclosangeles.com/news/business/money-report/how-elon-musk-hopes-his-new-supercomputers-will-boost-his-businesses/3516905/) — NBC Los Angeles / CNBC Money Report · 2024-09-21
- [Tesla Building Cortex 2.0 Supercomputer at Giga Texas to ...](https://www.notateslaapp.com/news/2703/tesla-building-cortex-20-supercomputer-at-giga-texas-to-power-fsd)
- [Fetched web page](https://www.oncor.com/content/dam/oncorwww/documents/investorrelations/financial-news/March%202025%20Slide%20Presentation.pdf)
- [PlainSite :: Perceptive Automata LLC v. Tesla, Inc., Texas Eastern District Court Case No. 2:25-cv-00742-JRG Document 1: Complaint](https://www.plainsite.org/dockets/download.html?id=340500154&z=cbb742d4)
- [tsla-20251231](https://www.sec.gov/Archives/edgar/data/1318605/000162828026003952/tsla-20251231.htm)
- [Tesla incentives draw fire as Travis County weighs tax hike](https://www.statesman.com/news/local/article/tesla-tax-rebates-travis-county-property-taxes-20821464.php)
- [AI & Robotics | Tesla](https://www.tesla.com/AI)
- [Giga Texas | Tesla](https://www.tesla.com/giga-texas)
- [Tesla FSD Cortex AI supercluster is running at full capacity, confirms Elon Musk - Tesla Oracle](https://www.teslaoracle.com/2025/06/27/tesla-fsd-cortex-ai-supercluster-is-running-at-full-capacity-confirms-elon-musk/)
- [Tesla is building Cortex 2.0 supercomputer facility in Giga ...](https://www.teslarati.com/tesla-building-cortex-2-supercomputer-facility-giga-texas/)
- [Economic Development Incentive Agreements | Travis County, Texas](https://www.traviscountytx.gov/planning-budget/projects-compliance/economic-development-incentive-agreements)

## Data quality

- Cortex 1 is treated separately from Cortex 2.0; reporting about Cortex 2.0 was excluded from exact-asset findings.
- The strongest exact-asset evidence identifies Cortex as Tesla’s training cluster at Gigafactory Texas in Austin, but generally does not provide a street address or parcel for the dedicated building. Parent-campus hearings, incentives, environmental concerns, and community investments are labeled as campus-level rather than Cortex-specific. No unsupported MW, water-use, PUE, WUE, building-count, tenant, or commercial-term claims are included.
- Removed uncited provider news result: Tesla’s 50,000 GPU Cortex supercomputer went live in Q4 2024
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---