# Coyote Wind LLC

ERCOT asset profile · https://askthegrid.com/assets/facilities/coyote-wind-llc

EDF power solutions · Scurry County · ERCOT

Coyote Wind is a 242.5 MW wind facility in Scurry County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 63655, with service beginning in January 2021 and EDF Renewable Asset Holdings as the registered operator. Masdar describes the project as 243 MW with 48 Siemens Gamesa turbines rated at 4.5 MW and 11 rated at 2.4 MW. EDF's current project page separately reports 238 MW and 60 turbines; because the owner-published records conflict, both scopes remain visible rather than being merged.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT.
- **Capacity scope:** 242.5 MW EIA · 243 MW Masdar · 238 MW EDF current project page.
- **Equipment scope:** Masdar: 48 × 4.5 MW + 11 × 2.4 MW · EDF: 60 turbines.
- **Ownership:** EDF and Masdar are project partners under the reviewed portfolio transaction.

## Metrics

- **EIA capacity:** 242.5 MW — May 2026
- **Masdar project rating:** 243 MW — 59 disclosed turbines
- **EDF project rating:** 238 MW — 60 disclosed turbines
- **Operating month:** Jan 2021 — EIA
- **Registry anchor:** Plant 63655 — EDF Renewable Asset Holdings

## Facts

- **Operating capacity:** 242.5 MW — EIA · confidence: high
- **Masdar equipment record:** 48 × 4.5 MW · 11 × 2.4 MW — Masdar · confidence: high
- **EDF project record:** 238 MW · 60 turbines — EDF · confidence: high
- **Completion year:** 2021 — Masdar · confidence: high

## Related parties

- **EIA registered operator and project partner:** EDF Renewable Asset Holdings — EIA May 2026 generator inventory ([source](https://www.edf-re.com/))
- **Wind-turbine supplier:** Siemens Gamesa — Masdar Coyote project page ([source](https://www.siemensgamesa.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Masdar Coyote project page](https://masdar.ae/en/renewables/our-projects/coyote-onshore-wind-farm) — Masdar · official — Masdar's project rating equipment configuration and completion year.

---

Canonical page: https://askthegrid.com/assets/facilities/coyote-wind-llc
Website: [EDF power solutions](https://www.edf-re.com/project/coyote/)
Profile published: 2026-07-17T03:34:10.802Z
Source: Ask the Grid — https://askthegrid.com/