# Crocker Wind Farm

MISO asset profile · https://askthegrid.com/assets/facilities/crocker-wind-farm

## Current generation inventory

EIA plant 60505 · Inventory reporting month: 2026-08.

- wind: 200 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -97.82642, 45.051544
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2022-01-20 23:58:36+00:00
- Map prepared: 2026-10-10T23:05:22.240324+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Crocker Wind Farm is a 200 MW onshore wind turbine plant in Clark County. The South Dakota PUC counts 77 turbines in Phase I. Its output is contracted through virtual power purchase agreements with Walmart and Cargill, and the developer places it in the SPP market.

## Reviewed metrics

- **Nameplate capacity:** 200 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 60505 — plant-60505

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Geronimo Power

## Related parties

- **Offtaker:** Walmart — offtaker
- **Offtaker:** Cargill — offtaker

## Sources

- [geronimopower.com](https://geronimopower.com/projects/crocker/) — geronimopower.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/crocker-wind-farm
Website: [Geronimo Power](https://geronimopower.com)

Source: Ask the Grid — https://askthegrid.com/