# Cunningham

SPP asset profile · https://askthegrid.com/assets/facilities/cunningham

## Current generation inventory

EIA plant 2454 · Inventory reporting month: 2026-08.

- natural gas: 444.20000000000005 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -103.3533, 32.7131
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2026-04-11 15:25:58+00:00
- Map prepared: 2026-10-10T02:28:18.460701+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Cunningham Station is Xcel Energy's natural gas plant west of Hobbs in Lea County, New Mexico, part of the Cunningham-Maddox Generating Complex developed in the 1950s and 1960s. Unit 2, built in 1965, is being upgraded to run until 2027. Cunningham 1 Solar, a 72 MW solar facility with a 36 MW battery, entered service on April 1, 2026, and a 196 MW Cunningham 2 Solar is scheduled for April 2027 to replace Unit 2.

## Reviewed metrics

- **Nameplate capacity:** 444.2000000000001 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 2454 — plant-2454

## Facts

- **Technology:** Natural Gas Fired Combustion Turbine, Natural Gas Steam Turbine
- **Operator:** Xcel Energy
- **Operating status:** Operating

## Related parties

- **Owner / operator:** Xcel Energy — owner ([source](https://www.xcelenergy.com))

## Sources

- [newsroom.xcelenergy.com](https://newsroom.xcelenergy.com/news/xcel-energy-expands-solar-and-battery-energy-storage-to-manage-energy-costs-and-support-electric-reliability) — newsroom.xcelenergy.com · public_source — Source retained for exact-record publication review.
- [newsroom.xcelenergy.com](https://newsroom.xcelenergy.com/news/xcel-energy-files-plan-to-meet-southwest-power-needs-MCWA2MCKS3CJDGDFOYTL3UWZROWE) — newsroom.xcelenergy.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/cunningham
Website: [Xcel Energy](https://www.xcelenergy.com)

Source: Ask the Grid — https://askthegrid.com/
