# CyrusOne NVA14

PJM data center · https://askthegrid.com/assets/facilities/cyrusone-nva14

CyrusOne NVA14 is a building data center in Ashburn, Loudoun County, VA. PowerHouse is identified as the operator, and the facility is operating. It is identified as part of PowerHouse ABX-1. Spatial service-territory evidence associates the site with Dominion Virginia Power; the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.

## Identity and location

- Operating status: operating
- Asset scope: building
- Location: 21529 Beaumeade Circle, Ashburn, Loudoun County, VA
- Owner: CyrusOne (exact asset) — http://datacenterdynamics.com/en/news/cyrusone-acquires-leased-data-center-in-ashburn-from-powerhouse
- Operator: PowerHouse (exact asset) — https://www.powerhousedata.com/news/powerhouse-data-centers-announces-lease-agreement-with-cyrusone-for-abx-1-data-center-powered-shell
- Developer: PowerHouse Data Centers (exact asset) — https://www.americanrepartners.com/properties/powerhouse-abx-1
- Utility: Dominion Virginia Power (exact asset) — https://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&where=1%3D1&geometry=-77.4504568%2C39.0195992&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=Provider%2CUtility&returnGeometry=false

## Power and grid context

- Utility service: 60 MW · reported · exact asset — Maximum utility MW capacity
- Critical it load: 36 MW · reported · exact asset — Critical power capacity
- Contracted power: 80 MW · target · exact asset — Expandable power capacity
- Interconnection request: 300 MW · reported · exact asset — On-site substation capacity
- ISO/RTO: PJM Interconnection
- Balancing authority: PJM Interconnection
- Electric utility: Dominion Virginia Power

## Development

- Site status: operating
- Site area: 10 acres
- Gross floor area: 265,000 square feet
- Buildings: 1
- Construction: Groundbreaking began in September 2022, construction completed in October 2023, and the facility became operational in October 2023.

## Compute and operations

- Facility classes: hyperscale, colocation, cloud, ai_hpc, enterprise
- Workloads: hyperscale cloud workloads, dense enterprise deployments, AI / HPC (DGX-ready, high-density power), general colocation / enterprise
- Critical IT load: 36 MW
- Operating context: Purpose-built two‑story 265,000 sq ft powered shell delivered Oct 2023; developed by PowerHouse Data Centers and leased/operated as CyrusOne NVA14 under a long-term (30‑year) lease/acquisition arrangement.

## Sources

- [http://americanrepartners.com/properties/powerhouse-abx-1](http://americanrepartners.com/properties/powerhouse-abx-1)
- [http://baxtel.com/data-center/powerhouse-abx1](http://baxtel.com/data-center/powerhouse-abx1)
- [http://datacenterdynamics.com/en/news/cyrusone-acquires-leased-data-center-in-ashburn-from-powerhouse](http://datacenterdynamics.com/en/news/cyrusone-acquires-leased-data-center-in-ashburn-from-powerhouse)
- [http://datacentermap.com/usa/virginia/ashburn/powerhouse-abx1](http://datacentermap.com/usa/virginia/ashburn/powerhouse-abx1)
- [http://deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers](http://deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers)
- [http://dominionenergy.com/en/About/Delivering-Energy/Electric-Transmission-Access](http://dominionenergy.com/en/About/Delivering-Energy/Electric-Transmission-Access)
- [http://dpr.com/projects/powerhouse-abx-1-beaumeade](http://dpr.com/projects/powerhouse-abx-1-beaumeade)
- [http://hklaw.com/en/insights/publications/2026/08/virginia-preserves-data-center-tax-incentive](http://hklaw.com/en/insights/publications/2026/08/virginia-preserves-data-center-tax-incentive)
- [http://loudounnow.com/business/cyrusone-lands-powerhouse-s-abx-1-data-center/article_14f140c8-0c6d-11ee-accb-5bc004f02320.html](http://loudounnow.com/business/cyrusone-lands-powerhouse-s-abx-1-data-center/article_14f140c8-0c6d-11ee-accb-5bc004f02320.html)
- [http://loudounpossible.com/business-sector/data-centers](http://loudounpossible.com/business-sector/data-centers)
- [http://ocolo.io/colocation/cyrusone/ashburn-nva14](http://ocolo.io/colocation/cyrusone/ashburn-nva14)
- [http://openei.org/wiki/RAPID/BulkTransmission/Virginia](http://openei.org/wiki/RAPID/BulkTransmission/Virginia)
- [http://powerhousedata.com/data-center/powerhouse-abx-1](http://powerhousedata.com/data-center/powerhouse-abx-1)
- [http://powerhousedata.com/news/powerhouse-data-centers-announces-lease-agreement-with-cyrusone-for-abx-1-data-center-powered-shell](http://powerhousedata.com/news/powerhouse-data-centers-announces-lease-agreement-with-cyrusone-for-abx-1-data-center-powered-shell)
- [http://powerhousedata.com/news/powerhouse-tops-out-at-first-data-center-project](http://powerhousedata.com/news/powerhouse-tops-out-at-first-data-center-project)
- [http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5949050,38.7780614&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1](http://services3.arcgis.com/Ww6Zhg5FR2pLMf1C/ArcGIS/rest/services/VA_Electric_2016/FeatureServer/0/query?f=json&geometry=-77.5949050,38.7780614&geometryType=esriGeometryPoint&inSR=4326&outFields=Provider,Utility&returnGeometry=false&spatialRel=esriSpatialRelIntersects&where=1=1)
- [PowerHouse ABX1 Data Center](https://baxtel.com/data-center/powerhouse-abx1)
- [Powerhouse Abx1 Data Center, Ashburn, Virginia | GoDataCenters](https://godatacenters.com/data-centers/virginia/ashburn/powerhouse-abx1-bedc387d)
- [PowerHouse ABX-1](https://www.americanrepartners.com/properties/powerhouse-abx-1)
- [CyrusOne: Home](https://www.cyrusone.com/)
- [PowerHouse Data Centers: PowerHouse ABX-1 (Ashburn, ...](https://www.datacenters.com/powerhouse-powerhouse-abx-1-ashburn-va)
- [Issued Air Permits for Data Centers | Virginia DEQ](https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers)
- [PowerHouse ABX-1 at Beaumeade](https://www.dpr.com/projects/powerhouse-abx-1-beaumeade)
- [CyrusOne: Ashburn NVA14 | OCOLO](https://www.ocolo.io/colocation/cyrusone/ashburn-nva14/)
- [PowerHouse Data Centers Approach](https://www.powerhousedata.com/approach)
- [PowerHouse ABX-1](https://www.powerhousedata.com/data-center/powerhouse-abx-1)
- [50 Percent Completion Milestone for ABX-1 Data Center](https://www.powerhousedata.com/news/powerhouse-data-centers-and-dpr-construction-celebrate-50-percent-completion-milestone-for-abx-1-data-center-2) — PowerHouse Data Centers · 2023-02-28
- [PowerHouse Data Centers Plans New NoVA Campus In ...](https://www.powerhousedata.com/news/powerhouse-data-centers-plans-new-nova-campus-in-spotsylvania-moves-nationally-into-reno-nv-2)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/cyrusone-nva14
Profile generated: 2026-09-04T14:28:32.838652Z
Source: Ask the Grid — https://askthegrid.com/