CyrusOne NYM2 is a data center at 50 Madison Road in Totowa, New Jersey, about 17 miles from Midtown Manhattan. The operator describes two buildings totaling 200,000 sq. ft., with 50,000 sq. ft. of data center space on 36-inch raised floor and 60,000 sq. ft. of work area recovery space. It reports 6 MW of total IT capacity and 2,500 tons of N+1 cooling capacity from water-cooled centrifugal chillers. NYM2 is part of CyrusOne's National IX platform and is designed for 99.999% availability.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 50 Madison Road, Totowa, NJ
- Operator: CyrusOne (exact asset) — https://www.cyrusone.com

## Power and grid context

- Reported unspecified: 6 MW · reported · exact asset — Operator-reported total IT capacity; basis unspecified.

## Development

- Gross floor area: 200,000 square feet

## Compute and operations

- Facility classes: colocation
- Operating context: Designed for 99.999% availability; 60,000 sq. ft. of work area recovery space

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=50+Madison+Road%2C+Totowa%2C+NJ%2C+07512&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [https://www.cyrusone.com/data-centers/north-america/totowa-nj-nym2](https://www.cyrusone.com/data-centers/north-america/totowa-nj-nym2)
- [https://www.peeringdb.com/fac/2356](https://www.peeringdb.com/fac/2356)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/cyrusone-nym2
Profile generated: 2026-10-09T00:03:15.451257Z
Source: Ask the Grid — https://askthegrid.com/