# Daggett 2

CAISO Batteries, Solar Photovoltaic · https://askthegrid.com/assets/facilities/daggett-2

Daggett 2 is a hybrid solar and battery storage facility with 313 MW of EIA-reported total operating capacity and 524 MWh of reported storage energy capacity in San Bernardino County, California, registered as EIA Plant ID 64851. Daggett Solar Power 2 LLC owns and operates the plant. The facility interconnects at SCE Kramer Substation at 230 kV. Its grid role is solar generation paired with battery storage that can store and deploy clean power during peak demand to support grid reliability.

## Key facts

- Technology: Batteries, Solar Photovoltaic
- Power capacity: 313 MW
- Energy capacity: 524 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO (CAISO)
- Substation: SCE Kramer Substation
- Point of interconnection: SCE Kramer Substation
- Transmission owner: Southern California Edison (SCE)
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: clearwayenergygroup.com — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: medium
- Owner logo domain: clearwayenergygroup.com — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: medium
- Identifiers: [{"value":"64851","system":"EIA plant ID"},{"value":"32633","system":"FERC MBR EIA record ID"},{"value":"DAGGP","system":"EIA/FERC generator ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"DAGGETT SOLAR 2","system":"CAISO queue project"},{"value":"1313","system":"CAISO queue position"},{"value":"CMBLND_2_DS2SR1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR3","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT3","system":"CAISO participating resource ID"},{"value":"ER23-1577-000","system":"FERC docket"},{"value":"GA2025-10DS","system":"CPUC audit number"},{"value":"SCE Kramer Substation","system":"Physical point of interconnection"}] — Briefing on Resources available for near term interconnection · confidence: medium
- Identifiers: [{"value":"64851","system":"EIA plant ID"},{"value":"32633","system":"FERC MBR EIA record ID"},{"value":"DAGGP","system":"EIA/FERC generator ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"DAGGETT SOLAR 2","system":"CAISO queue project"},{"value":"1313","system":"CAISO queue position"},{"value":"CMBLND_2_DS2SR1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR3","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT3","system":"CAISO participating resource ID"},{"value":"ER23-1577-000","system":"FERC docket"},{"value":"GA2025-10DS","system":"CPUC audit number"},{"value":"SCE Kramer Substation","system":"Physical point of interconnection"}] — Daggett Solar Power 2 LLC; Supplemental Notice That... · confidence: medium
- Identifiers: [{"value":"64851","system":"EIA plant ID"},{"value":"32633","system":"FERC MBR EIA record ID"},{"value":"DAGGP","system":"EIA/FERC generator ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"DAGGETT SOLAR 2","system":"CAISO queue project"},{"value":"1313","system":"CAISO queue position"},{"value":"CMBLND_2_DS2SR1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR3","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT3","system":"CAISO participating resource ID"},{"value":"ER23-1577-000","system":"FERC docket"},{"value":"GA2025-10DS","system":"CPUC audit number"},{"value":"SCE Kramer Substation","system":"Physical point of interconnection"}] — Source · confidence: medium
- Identifiers: [{"value":"64851","system":"EIA plant ID"},{"value":"32633","system":"FERC MBR EIA record ID"},{"value":"DAGGP","system":"EIA/FERC generator ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"DAGGETT SOLAR 2","system":"CAISO queue project"},{"value":"1313","system":"CAISO queue position"},{"value":"CMBLND_2_DS2SR1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2SR3","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT1","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT2","system":"CAISO participating resource ID"},{"value":"CMBLND_2_DS2BT3","system":"CAISO participating resource ID"},{"value":"ER23-1577-000","system":"FERC docket"},{"value":"GA2025-10DS","system":"CPUC audit number"},{"value":"SCE Kramer Substation","system":"Physical point of interconnection"}] — Source · confidence: medium
- Identifiers.5: {"value":"DAGGETT SOLAR 2","system":"CAISO queue project"} — Briefing on Resources available for near term interconnection · confidence: high
- Identifiers.6: {"value":"1313","system":"CAISO queue position"} — Briefing on Resources available for near term interconnection · confidence: medium
- Identifiers.7: {"value":"CMBLND_2_DS2SR1","system":"CAISO participating resource ID"} — NRI · confidence: medium
- Identifiers.8: {"value":"CMBLND_2_DS2SR2","system":"CAISO participating resource ID"} — NRI · confidence: medium
- Identifiers.9: {"value":"CMBLND_2_DS2SR3","system":"CAISO participating resource ID"} — Curtailed · confidence: medium
- Identifiers.10: {"value":"CMBLND_2_DS2BT1","system":"CAISO participating resource ID"} — NRI · confidence: medium
- Identifiers.11: {"value":"CMBLND_2_DS2BT2","system":"CAISO participating resource ID"} — NRI · confidence: medium
- Identifiers.12: {"value":"CMBLND_2_DS2BT3","system":"CAISO participating resource ID"} — Resource category and phase · confidence: medium
- Identifiers.13: {"value":"ER23-1577-000","system":"FERC docket"} — Daggett Solar Power 2 LLC; Supplemental Notice That... · confidence: high
- Identifiers.14: {"value":"GA2025-10DS","system":"CPUC audit number"} — Source · confidence: medium
- Identifiers.15: {"value":"SCE Kramer Substation","system":"Physical point of interconnection"} — Source · confidence: medium
- Parties.1: {"relationship":"Parent/developer and long-term owner/operator group","name":"Clearway Energy Group LLC","official_url":"https://www.clearwayenergygroup.com/"} — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: medium
- Parties.1: {"relationship":"Parent/developer and long-term owner/operator group","name":"Clearway Energy Group LLC","official_url":"https://www.clearwayenergygroup.com/"} — Clearway's Customers · confidence: medium
- Parties.5: {"relationship":"Battery storage supplier and integrator","name":"Wärtsilä Energy Storage & Optimisation","official_url":"https://www.wartsila.com/"} — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Parties.5: {"relationship":"Battery storage supplier and integrator","name":"Wärtsilä Energy Storage & Optimisation","official_url":"https://www.wartsila.com/"} — Supporting the clean energy transition in California and Hawaii, USA · confidence: high
- Parties.6: {"relationship":"Contracted offtaker","name":"Southern California Public Power Authority (SCPPA)","official_url":"https://scppa.org/"} — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: high
- Parties.7: {"relationship":"SCPPA participating member","name":"City of Cerritos","official_url":"https://www.cerritos.gov/"} — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: high
- Parties.8: {"relationship":"SCPPA participating member","name":"City of Vernon Public Utilities","official_url":"https://www.cityofvernon.org/"} — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: high
- Parties.10: {"relationship":"Transmission interconnection utility","name":"Southern California Edison (SCE)","official_url":"https://www.sce.com/"} — Source · confidence: medium
- Parties.11: {"relationship":"Project administration services provider","name":"Clearway Asset Services LLC","official_url":"https://www.clearwayenergygroup.com/"} — March 26, 2026 - EX-99.2 - 10-K/A: Annual report [Section 13 and 15(d), not S-K Item 405] | HA Sustainable Infrastructure Capital, Inc. (HASI) · confidence: high
- Parties.12: {"relationship":"Construction labor partner","name":"I.B.E.W. Local 477","official_url":"https://ibew477.org/"} — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: medium
- Duration hours: 4 — Source · confidence: medium
- Energy mwh: 524 — Source · confidence: medium
- Product url: https://storage.wartsila.com/technology/gridsolv-quantum/ — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: medium
- Product url: https://storage.wartsila.com/technology/gridsolv-quantum/ — GridSolv Quantum · confidence: medium
- Equipment models.0: {"manufacturer_domain":"wartsila.com","product_url":"https://storage.wartsila.com/technology/gridsolv-quantum/","count":null,"unit_mw":null,"name":"GridSolv Quantum"} — GridSolv Quantum · confidence: medium
- Construction scope: Daggett 2 is an operational hybrid facility in San Bernardino County comprising a 182 MW solar-PV generating facility and a 131 MW battery energy-storage system. Wärtsilä’s project case study specifies the Daggett 2 BESS at 131 MW / 524 MWh. The storage system uses Wärtsilä GridSolv Quantum and the GEMS Digital Energy Platform. No exact Daggett-2-only installed count is established for solar modules, PCS/inverters, batteries, or containers. — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: medium
- Product url: https://storage.wartsila.com/technology/gridsolv-quantum/ — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Manufacturer domain: wartsila.com — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: high
- Manufacturer domain: wartsila.com — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Equipment models: [{"manufacturer_domain":"wartsila.com","product_url":"https://storage.wartsila.com/technology/gridsolv-quantum/","count":null,"unit_mw":null,"name":"GridSolv Quantum"},{"manufacturer_domain":"wartsila.com","product_url":"https://www.wartsila.com/energy/energy-storage/technology/gems-digital-energy-platform","count":null,"unit_mw":null,"name":"GEMS Digital Energy Platform"}] — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: medium
- Product family: GridSolv Quantum; GEMS Digital Energy Platform — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Manufacturer name: Wärtsilä Energy Storage & Optimisation — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: high
- Equipment models.0: {"manufacturer_domain":"wartsila.com","product_url":"https://storage.wartsila.com/technology/gridsolv-quantum/","count":null,"unit_mw":null,"name":"GridSolv Quantum"} — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Equipment models.1: {"manufacturer_domain":"wartsila.com","product_url":"https://www.wartsila.com/energy/energy-storage/technology/gems-digital-energy-platform","count":null,"unit_mw":null,"name":"GEMS Digital Energy Platform"} — Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios · confidence: high
- Quality notes: ["The $20.5 million and $129.4 million cash contributions disclosed for February 17, 2023 relate to Daggett 3, not Daggett 2.","Daggett 2 records describe an ownership contribution or transfer into Daggett Renewable Holdco effective January 1, 2024, but do not identify a seller or disclose sale consideration.","The $700 million financing announced in July 2024 covered Luna Valley Solar and the separate 113.5 MW Daggett Standalone Storage project, not the exact 313 MW Daggett 2 plant.","The 2021 construction announcement concerned full construction of Daggett 3 within the broader complex; it did not provide a separately dated construction start for Daggett 2."] — Clearway Closes Financing and Starts Construction on Solar and Battery Energy Storage Facilities in California - Clearway Energy · confidence: medium
- Financing summary: Effective January 1, 2024, Daggett Renewable Holdco assumed the Daggett 2 Financing Agreement, which included a $156.1 million term loan, net of $2.2 million of unamortized debt-issuance costs. Daggett 2 Class B LLC and Daggett Solar Power 2 were identified as co-borrowers, while the lending consortium was not named. HASI participated as a third-party cash-equity investor through HA Lighthouse LLC. The cited records do not disclose a separate Daggett 2 sale price or Daggett 2-specific tax-equity contribution; the $20.5 million and $129.4 million figures belong to Daggett 3. — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: medium
- Timeline: [{"event":"Broader-complex construction announcement","date":"2021-10-19","detail":"Clearway announced full construction at the Daggett 3 phase and stated that the Daggett 3 and Daggett 2 phases were already under contract. The announcement did not provide a separately dated Daggett 2 construction start."},{"event":"Broader Daggett complex commercial-operations announcement","date":"2023-10-18","detail":"Clearway announced that the Daggett Solar + Storage complex had reached commercial operations; this announcement covered the broader complex rather than solely EIA plant 64851."},{"event":"First generating unit online","date":"2023-12-01","detail":"The EIA-based plant record reports the first Daggett 2 unit online in December 2023, with two generating units ultimately operational."},{"event":"Daggett Solar 2 commercial operation","date":"2023-12-12","detail":"SCPPA records the exact Daggett Solar 2 solar-and-storage subproject as achieving commercial operations on December 12, 2023."},{"event":"Ownership transfer and financing assumption","date":"2024-01-01","detail":"Daggett 2 TargetCo consolidated into Daggett Renewable Holdco effective January 1, 2024. The related Contribution Agreement was dated February 13, 2024, and the transferred structure assumed the Daggett 2 Financing Agreement. No seller or sale consideration was disclosed for this transfer."}] — Dagget Solar 2 – SCPPA · confidence: medium
- Timeline.3: {"event":"Daggett Solar 2 commercial operation","date":"2023-12-12","detail":"SCPPA records the exact Daggett Solar 2 solar-and-storage subproject as achieving commercial operations on December 12, 2023."} — Dagget Solar 2 – SCPPA · confidence: high
- Commercial parties.5: {"relationship":"Contracted offtaker and project participant","name":"Southern California Public Power Authority (SCPPA)","detail":"Its Daggett Solar 2 tranche serves Cerritos and Vernon and comprises 65 MW of solar and 33 MWac of battery storage.","official_url":"https://scppa.org/"} — Dagget Solar 2 – SCPPA · confidence: high
- Commercial parties.9: {"relationship":"Construction labor partner","name":"I.B.E.W. Local 477","detail":"Partnered with Clearway on construction of the Daggett Solar + Storage complex and supported more than 500 union construction jobs.","official_url":"https://ibew477.org/"} — Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy · confidence: medium
- Commercial parties.10: {"relationship":"SCPPA participating member","name":"City of Cerritos","detail":"Participates in the SCPPA Daggett Solar 2 project with an 8% share.","official_url":"https://www.cerritos.gov/"} — Dagget Solar 2 – SCPPA · confidence: high
- Commercial parties.11: {"relationship":"SCPPA participating member","name":"City of Vernon Public Utilities","detail":"Participates in the SCPPA Daggett Solar 2 project with a 92% share.","official_url":"https://www.cityofvernon.org/"} — Dagget Solar 2 – SCPPA · confidence: high
- Quality notes.1: Daggett 2 records describe an ownership contribution or transfer into Daggett Renewable Holdco effective January 1, 2024, but do not identify a seller or disclose sale consideration. — Clearway Closes Financing and Starts Construction on Solar and Battery Energy Storage Facilities in California - Clearway Energy · confidence: high
- Later sale or transfer: Effective 2024-01-01, the members contributed 100% of their respective membership interests in Daggett 2 TargetCo LLC to Daggett Renewable Holdco LLC under a Contribution Agreement dated 2024-02-13. This was an internal common-control transfer, not a third-party sale. — cwen-20241231 · confidence: high
- Acquisition date: 2023-08-30 — cwen-20241231 · confidence: high

## Timeline

- 2021-10-19 — Broader-complex construction announcement
  Clearway announced full construction at the Daggett 3 phase and stated that the Daggett 3 and Daggett 2 phases were already under contract. The announcement did not provide a separately dated Daggett 2 construction start.
  Source: Clearway Begins Full Construction on Massive Solar + Energy Storage Project in Southern California - Clearway Energy (https://www.clearwayenergygroup.com/press-releases/clearway-begins-full-construction-on-massive-solar-energy-storage-project-in-southern-california/)
- 2024-01-01 — Ownership transfer and financing assumption
  Daggett 2 TargetCo consolidated into Daggett Renewable Holdco effective January 1, 2024. The related Contribution Agreement was dated February 13, 2024, and the transferred structure assumed the Daggett 2 Financing Agreement. No seller or sale consideration was disclosed for this transfer.
  Source: March 26, 2026 - EX-99.2 - 10-K/A: Annual report [Section 13 and 15(d), not S-K Item 405] | HA Sustainable Infrastructure Capital, Inc. (HASI) (https://investors.hasi.com/filings-financials/sec-filings/content/0001561894-26-000046/ex992-daggettrenewableho.htm)

## Sources

- [Wärtsilä signs contracts to supply energy storage systems for one of the world’s largest solar-plus-storage project portfolios](https://www.wartsila.com/media/news/11-07-2022-wartsila-signs-contracts-to-supply-energy-storage-systems-for-one-of-the-world-s-largest-solar-plus-storage-project-portfolios-3130241) — wartsila.com · tier other
- [Clearway Announces Commercial Operations at the Daggett Clean Energy Complex - Clearway Energy](https://www.clearwayenergygroup.com/press-releases/clearway-announces-commercial-operations-at-the-daggett-clean-energy-complex/) — clearwayenergygroup.com · tier other
- [Briefing on Resources available for near term interconnection](https://www.caiso.com/documents/briefing-resourcesavailable-nearterminterconnection.pdf) — caiso.com · tier other
- [Daggett Solar Power 2 LLC; Supplemental Notice That ...](https://www.federalregister.gov/documents/2023/04/14/2023-07944/daggett-solar-power-2-llc-supplemental-notice-that-initial-market-based-rate-filing-includes-request) — federalregister.gov · tier regulatory
- [Source](https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/safety-and-enforcement-division/esrb/generation/audits/gao-167-audits/2025-gao-audits/daggett-solar-power-2--3-and-bess-may-12-2025.pdf) — cpuc.ca.gov · tier regulatory
- [Source](https://pge.com/tariffs/assets/pdf/adviceletter/ELEC_6033-E.pdf) — pge.com · tier other
- [March 26, 2026 - EX-99.2 - 10-K/A: Annual report [Section 13 and 15(d), not S-K Item 405] | HA Sustainable Infrastructure Capital, Inc. (HASI)](https://investors.hasi.com/filings-financials/sec-filings/content/0001561894-26-000046/ex992-daggettrenewableho.htm) — investors.hasi.com · tier other
- [NRI](https://www.caiso.com/documents/fullnetworkmodel_workscope_db22m11.xlsx) — caiso.com · tier other
- [Curtailed](https://www.caiso.com/documents/curtailed-non-operational-generator-am-report-20231116.xlsx) — caiso.com · tier other
- [Resource category and phase](https://www.caiso.com/documents/resourcecategoryandphaseallparticipatingresourceids.xlsx) — caiso.com · tier other
- [Clearway's Customers](https://www.clearwayenergygroup.com/customers/) — clearwayenergygroup.com · tier other
- [Supporting the clean energy transition in California and Hawaii, USA](https://wartsila.com/docs/default-source/energy-docs/energy-storage/project-spotlights/eb-eso-casestudy-amer-clearway.pdf?sfvrsn=d7d01243_5) — wartsila.com · tier other
- [Source](https://clearwayenergygroup.com/press-releases/clearway-announces-commercial-operations-at-the-daggett-clean-energy-complex) — clearwayenergygroup.com · tier other
- [Supporting the clean energy transition in California and ...](https://www.wartsila.com/docs/default-source/energy-docs/energy-storage/project-spotlights/eb-eso-casestudy-amer-clearway.pdf?sfvrsn=d7d01243_5) — wartsila.com · tier other
- [Q3 2023 - Golden State glory - harvesting sunshine : BackIssues, altenerG.com - enerG Alternative Sources Magazine - enerG,Archives](https://www.altenerg.com/back_issues/story.php?sid=3035) — altenerg.com · tier other
- [GridSolv Quantum](https://www.wartsila.com/docs/default-source/power-plants-documents/downloads/specification-sheets/gridsolv-quantum-specification-sheet.pdf) — wartsila.com · tier other
- [Source](https://lus.sbcounty.gov/wp-content/uploads/sites/48/Environmental/Daggett%20for%20website/2.0-Project-Description.pdf) — lus.sbcounty.gov · tier regulatory
- [Dagget Solar 2 – SCPPA](https://scppa.org/projects-programs/solar-energy/dagget-solar-2/) — scppa.org · tier other
- [Clearway Closes Financing and Starts Construction on Solar and Battery Energy Storage Facilities in California - Clearway Energy](https://www.clearwayenergygroup.com/press-releases/clearway-closes-financing-and-starts-construction-on-solar-and-battery-energy-storage-facilities-in-california/) — clearwayenergygroup.com · tier other
- [Clearway Begins Full Construction on Massive Solar + Energy Storage Project in Southern California - Clearway Energy](https://www.clearwayenergygroup.com/press-releases/clearway-begins-full-construction-on-massive-solar-energy-storage-project-in-southern-california/) — clearwayenergygroup.com · tier other
- [Pacific Gas & Electric Company ELC (Corp ID 39) Status of Advice Letter 6033E Disposition: Signed Effective Date: 04-15-2021](https://www.pge.com/tariffs/assets/pdf/adviceletter/ELEC_6033-E.pdf) — pge.com · tier other
- [cwen-20241231](https://www.sec.gov/Archives/edgar/data/1567683/000156768325000007/cwen-20241231.htm) — sec.gov · tier regulatory
- [Clearway Brings Online Luna Valley and Daggett Energy Centers in California - Clearway Energy](https://www.clearwayenergygroup.com/press-releases/clearway-brings-online-luna-valley-and-daggett-energy-centers-in-california/) — clearwayenergygroup.com · tier other

## Data quality

- The $20.5 million and $129.4 million cash contributions disclosed for February 17, 2023 relate to Daggett 3, not Daggett 2. The $700 million financing announced in July 2024 covered Luna Valley Solar and the separate 113.5 MW Daggett Standalone Storage project, not the exact 313 MW Daggett 2 plant. The 2021 construction announcement concerned full construction of Daggett 3 within the broader complex; it did not provide a separately dated construction start for Daggett 2.

---

Canonical page: https://askthegrid.com/assets/facilities/daggett-2