DataBank Plano Campus comprises DFW3 and its attached DFW8 expansion at 8375 Dominion Parkway. The 16-acre site uses dual feeds from an off-site Oncor substation and metro interconnect links to other Dallas facilities. DataBank lists 12 MW of critical IT capacity for DFW3 and 40 MW for DFW8; these are not measured electricity demand. Both specify N+1 power and cooling. DFW8 supports higher-density configurations, listing air-cooled cabinet densities of 45 kW or more and liquid-cooled densities of 100 kW or more. These are design capabilities, not observed customer loads.

## Identity and location

- Operating status: unknown
- Asset scope: campus
- Location: 8375 Dominion Parkway, Plano, TX
- Operator: DataBank (exact asset) — https://www.databank.com/data-centers/dallas/plano-campus/

## Development

- Site status: The operator describes a 16-acre campus. DFW3 has 72,230 square feet of IT space; the attached DFW8 expansion has 126,000 square feet of IT space.

## Compute and operations

- Facility classes: colocation

## Sources

- [https://www.databank.com/data-centers/dallas/plano-campus/](https://www.databank.com/data-centers/dallas/plano-campus/)
- [https://www.databank.com/data-centers/dallas/plano-campus/dfw8/](https://www.databank.com/data-centers/dallas/plano-campus/dfw8/)
- [https://www.databank.com/data-centers/dallas/plano-campus/plano-data-center/](https://www.databank.com/data-centers/dallas/plano-campus/plano-data-center/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/databank-plano-campus--grid-load-61bdceb2793dd77f