# DataBank Red Oak Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/databank-red-oak-data-center-campus--grid-load-66f926fb712959eb

The DataBank Red Oak campus is a data center development on Batchler Road in Red Oak, Ellis County, Texas. DataBank is building it on a 292-acre site, planned as eight two-story buildings. The first phase, four buildings leased to an AI company, is under construction, with a 400 MW Oncor substation on site. DataBank describes the full campus as 480 MW of critical IT power by a planned 2030 completion.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 3080 Batchler Rd., Red Oak, Ellis County, TX
- Operator: DataBank (exact asset)
- Owner: DB Data Center Red Oak, LLC (exact asset)

## Power and grid context

- Critical it load: 480 MW · proposed · exact asset — Full campus of eight buildings after the second phase, original announcement
- Critical it load: 480 MW · target · target 2030 · exact asset — Planned completion of the full campus
- Critical it load: Up to 240 MW · proposed · exact asset — First-phase design of four buildings in the original announcement
- Critical it load: Up to 300 MW · reported · exact asset — Current campus page statement for the first phase; differs from the original 240 MW figure
- Utility service: 400 MW · proposed · exact asset — First-phase Oncor substation rating, not IT load
- Utility service: Up to 800 MW · proposed · exact asset — Substation expansion ceiling, not IT load
- Critical it load: 60 MW · reported · exact asset — DFW9 design critical IT load
- Critical it load: 60 MW · reported · exact asset — DFW10 design critical IT load
- Critical it load: 60 MW · reported · exact asset — DFW11 design critical IT load
- Critical it load: 60 MW · reported · exact asset — DFW12 design critical IT load
- Reported unspecified: 180 MW · under_construction · exact asset — First three leased buildings, basis not specified
- ISO/RTO: ERCOT
- Electric utility: Oncor
- Substation: On-site 400 MW substation, expandable to 800 MW

## Development

- Buildings: 8

## Compute and operations

- Facility classes: hyperscale
- Critical IT load: 480 MW

## Sources

- [Just a moment...](https://www.tradelineinc.com/news/2026-8/databank-constructs-red-oak-data-center-campus)
- [DataBank Develops 480MW South Dallas Data Campus](https://www.databank.com/resources/press-releases/databank-announces-development-of-480mw-data-center-campus-in-south-dallas/)
- [Inside look at construction in DataBank&#x27;s Red Oak data center campus](https://www.dallasnews.com/business/energy/article/construction-red-oak-databank-data-centers-campus-22316548.php)
- [Red Oak Campus Expansion at DataBank](https://www.databank.com/data-centers/dallas/red-oak-campus/)
- [Red Oak Campus Virtual Tour: DataBank&#039;s 480MW AI Data Center Near Dallas](https://www.databank.com/resources/videos/inside-databanks-red-oak-campus-data-centers/)
- [Red Oak Data Center - DataBank](https://www.databank.com/data-centers/dallas/red-oak-campus/dfw9/)
- [Red Oak Data Center - DataBank](https://www.databank.com/data-centers/dallas/red-oak-campus/dfw10/)
- [Red Oak Data Center - DataBank](https://www.databank.com/data-centers/dallas/red-oak-campus/dfw11/)
- [Red Oak Data Center - DataBank](https://www.databank.com/data-centers/dallas/red-oak-campus/dfw12/)
- [DataBank Secures $2B for South Dallas Campus](https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/)
- [Inside DataBank’s Red Oak Data Center Campus](https://www.databank.com/resources/news/inside-databanks-multibillion-dollar-red-oak-data-center-campus/)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024020821)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026027681)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2027000733)
- [DataBank Closes $1.45B in New Financing Deals](https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/)
- [https://maps.co.ellis.tx.us/arcgis/rest/services/External/External_Web_Map/MapServer/1048/query?where=UPPER%28St_Name%29+%3D+%27BATCHLER%27+AND+Add_Number+IN+%283080%2C3330%2C3320%2C3440%29&outFields=%2A&outSR=4326&returnGeometry=true&f=pjson](https://maps.co.ellis.tx.us/arcgis/rest/services/External/External_Web_Map/MapServer/1048/query?where=UPPER%28St_Name%29+%3D+%27BATCHLER%27+AND+Add_Number+IN+%283080%2C3330%2C3320%2C3440%29&outFields=%2A&outSR=4326&returnGeometry=true&f=pjson)

---

Canonical page: https://askthegrid.com/assets/facilities/databank-red-oak-data-center-campus--grid-load-66f926fb712959eb
Profile generated: 2026-11-02T21:31:36.095917Z
Source: Ask the Grid — https://askthegrid.com/