# DataBank Waco ACT1 Data Center

ERCOT data center · https://askthegrid.com/assets/facilities/databank-waco-act1-data-center

DataBank Waco ACT1 Data Center is a data center at 700 Austin Avenue in Waco, Texas. DataBank operates the facility. The operator reports 0.8 MW of critical IT load.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 700 Austin Avenue, Waco, TX
- Operator: DataBank (exact asset) — https://www.databank.com

## Power and grid context

- Critical it load: 0.8 MW · reported · exact asset — 0.8MW Critical IT Load

## Compute and operations

- Facility classes: colocation, cloud

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/address?street=700+Austin+Avenue&city=Waco&state=TX&zip=76701&benchmark=Public_AR_Current&vintage=Current_Current&format=json&layers=Counties%2CStates)
- [Waco Data Centers & Colocation | DataBank](https://www.databank.com/data-centers/waco/waco-700-austin-avenue/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/databank-waco-act1-data-center
Profile generated: 2026-10-02T04:41:02.288665Z
Source: Ask the Grid — https://askthegrid.com/