# DataNovaX Pioneer Park Phase I

ERCOT data center · https://askthegrid.com/assets/facilities/datanovax-pioneer-park-phase-i--grid-load-395ad1cacd7276e4

DataNovaX Pioneer Park Phase I is the 37,000-square-foot data-center project at 2236 Airport Drive in Wichita Falls. It is the first facility in a larger phased development marketed for enterprise, AI and high-performance computing workloads. The city placed its data-center use request on the August 12, 2026 Planning and Zoning Commission agenda. DataNovaX advertises 12 MW for Phase I and a carrier-neutral network offering; that advertised power figure is distinct from measured demand, and the proposed Phase II capacity belongs to a separate expansion.

## Identity and location

- Operating status: unknown
- Asset scope: building
- Location: 2236 Airport Drive, Wichita Falls, TX
- Developer: DataNovaX (exact asset) — https://datanovax.com/pioneer-park-dfw-alternative-data-center/

## Development

- Gross floor area: 37,000 square feet
- Buildings: 1
- Construction: DataNovaX identifies Phase I as a 37,000-square-foot facility. Its separately marketed Phase II is a 550,000-square-foot expansion, not additional floor space in this building. The developer's US$1 billion campus concept is likewise broader than Phase I.

## Compute and operations

- Operating context: DataNovaX advertises Phase I as available with 12 MW of power. The published figure does not distinguish utility-service capacity from IT load, and it is not a measured-demand value. The website gives inconsistent dates for a further 40 MW expansion, so that expansion is not represented as installed capacity.

## Sources

- [https://datanovax.com/pioneer-park-dfw-alternative-data-center/](https://datanovax.com/pioneer-park-dfw-alternative-data-center/)
- [https://datanovax.com/wp-content/uploads/2024/06/DataNovaX_Wichita-Falls-Spec-Sheet.pdf](https://datanovax.com/wp-content/uploads/2024/06/DataNovaX_Wichita-Falls-Spec-Sheet.pdf)
- [https://onboard.wichitafallstx.gov/meeting/16056/document1/download](https://onboard.wichitafallstx.gov/meeting/16056/document1/download)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---