# DataOne Vineland Data Center Campus (Nebius AI factory)

PJM data center · https://askthegrid.com/assets/facilities/dataone-vineland-data-center-campus-nebius-ai-factory--grid-load-df8a0dab3bc37c12

The DataOne Vineland campus is an AI data center at 3963 S Lincoln Ave in Vineland, Cumberland County, New Jersey. DataOne owns and operates the facility for Nebius, whose racks and GPU clusters serve Microsoft among other clients. Construction continues on a first building and a larger two-story expansion, and developers describe the complex as partially operational. Power is planned from on-site Bloom Energy fuel cells with the city utility supplying a small share, so the load on the surrounding grid depends on how much grid service is added later.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 3963 S Lincoln Ave, Vineland, Cumberland County, NJ
- Owner: DataOne (exact asset)
- Operator: DataOne (exact asset)
- Tenant: Nebius (exact asset)

## Power and grid context

- Reported unspecified: Up to 300 MW · proposed · exact asset — Phased campus expandable up to this total, as announced by the tenant
- Reported unspecified: Up to 350 MW · proposed · exact asset — Maximum capacity stated by the operator, basis not given
- Critical it load: 315 MW · contracted · exact asset — IT capacity committed from the tenant
- Campus gross power: About 300 MW · proposed · exact asset — Anticipated project power requirement in planning testimony, behind the meter
- Onsite generation: About 374 MW · proposed · campus — Dedicated power supply: Fuel-cell nameplate in the revised planning application, includes redundancy
- Onsite generation: About 250 MW · contracted · campus — Dedicated power supply: Guaranteed fuel-cell capacity under the capacity agreement
- Onsite generation: About 328 MW · contracted · campus — Dedicated power supply: System installed fuel-cell capacity under the capacity agreement
- Onsite generation: About 123 MW · reported · campus — Dedicated power supply: Natural-gas generation reported as installed and operated without state air permits
- Onsite generation: 400 MW · requested · campus — Dedicated power supply: Fuel-cell system described in an applicability determination request to the state
- Utility service: 5 MW · operating · exact asset — Supply from the City of Vineland, as reported by the operator
- Utility service: 49 MW · proposed · exact asset — Atlantic City Electric grid feed described by the operator as permanent
- ISO/RTO: PJM
- Electric utility: City of Vineland electric utility

## Development

- Site area: 106.6 acres

## Compute and operations

- Facility classes: AI data center
- Announced tenants: Nebius, Microsoft, through Nebius capacity
- Critical IT load: 315 MW

## Sources

- [Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey](https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey)
- [DataOne Q&amp;A | Sustainable AI Factory - Vineland, NJ](https://askvineland.dataone.eu/)
- [Home - DataOne](https://dataone.eu/)
- [www.vinelandcity.org](https://www.vinelandcity.org/Archive/Planning%20Board/Minutes/2026/Minutes%208-5-2026%20%28Special%20Meeting%29.pdf)
- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/1513845/000110465926064092/nbis-20260331xex99d2.htm)
- [NJ Fines Data Center $1M Over 123 MW of Unpermitted Generation | Engineering News-Record](https://www.enr.com/articles/63694-nj-fines-data-center-1m-over-123-mw-of-unpermitted-generation)
- [https://earthjustice.org/wp-content/uploads/2026/10/2026-10-21-sustain-sj-notice-of-intent-to-sue-dataone-for-clean-air-act-violations.pdf](https://earthjustice.org/wp-content/uploads/2026/10/2026-10-21-sustain-sj-notice-of-intent-to-sue-dataone-for-clean-air-act-violations.pdf)
- [www.vinelandcity.org](https://www.vinelandcity.org/Archive/Planning%20Board/Minutes/2026/Minutes%208-17-26%20%20%28Special%20Meeting%29.pdf)
- [Sustain SJ sues Vineland over DataOne approval | NJ Spotlight News](https://www.njspotlightnews.org/2026/10/sustain-sj-sues-vineland-over-dataone-approval-challenging-stormwater-plans-and-planning-board-authority/)
- [https://dep.nj.gov/wp-content/uploads/newsrel/2026/dataone75894-aonocapa.pdf](https://dep.nj.gov/wp-content/uploads/newsrel/2026/dataone75894-aonocapa.pdf)
- [Nebius x Vineland, New Jersey](https://nebius.com/vinelandnj)
- [Vineland residents fall asleep to the hum of the nearby data center, and &#x27;wake up angry&#x27;](https://www.inquirer.com/business/technology/vineland-nj-dataone-data-center-residents-noise-water-20261001.html)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3963+S+Lincoln+Ave%2C+Vineland%2C+NJ&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3963+S+Lincoln+Ave%2C+Vineland%2C+NJ&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Vinson &amp; Elkins Advises Industrial Development Funding and Oaktree on $1.7 Billion Investment in AI Infrastructure Build-Out - velaw.com](https://www.velaw.com/news/vinson-elkins-advises-industrial-development-funding-and-oaktree-on-1-7-billion-investment-in-ai-infrastructure-build-out/)

---