# Desert Star Energy Center

CAISO Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/desert-star-energy-center

Desert Star Energy Center is a natural gas-fired power facility with 366.4 MW of EIA-reported nameplate capacity in Clark County, Nevada, registered as EIA Plant ID 55077. San Diego Gas & Electric Company (SDG&E) is the current owner; Desert Star Energy Center SDG&E is the registered plant entity or operator. The plant's generating configuration is natural-gas-fired combined cycle with two Siemens 501-FC combustion turbines and one Westinghouse steam turbine. San Diego Gas & Electric Company acquired the project from El Dorado Energy, LLC in 2011.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 366.4 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CAISO

## Source-backed facts

- Owner logo domain: sdge.com — Source · confidence: medium
- Identifiers: [{"value":"55077","system":"EIA plant ID"},{"value":"5695","system":"EIA utility/entity ID"},{"value":"ED01","system":"EIA generator ID"},{"value":"ED02","system":"EIA generator ID"},{"value":"ED03","system":"EIA generator ID"},{"value":"Desert Star Energy Center","system":"CAISO participating-resource name"},{"value":"Desert Star Energy Center (419.25 MW NQC)","system":"CAISO NQC market-resource record"},{"value":"ER12-989-000","system":"FERC docket"},{"value":"ER12-988-000","system":"FERC related docket"}] — Source · confidence: medium
- Identifiers: [{"value":"55077","system":"EIA plant ID"},{"value":"5695","system":"EIA utility/entity ID"},{"value":"ED01","system":"EIA generator ID"},{"value":"ED02","system":"EIA generator ID"},{"value":"ED03","system":"EIA generator ID"},{"value":"Desert Star Energy Center","system":"CAISO participating-resource name"},{"value":"Desert Star Energy Center (419.25 MW NQC)","system":"CAISO NQC market-resource record"},{"value":"ER12-989-000","system":"FERC docket"},{"value":"ER12-988-000","system":"FERC related docket"}] — Source · confidence: medium
- Identifiers: [{"value":"55077","system":"EIA plant ID"},{"value":"5695","system":"EIA utility/entity ID"},{"value":"ED01","system":"EIA generator ID"},{"value":"ED02","system":"EIA generator ID"},{"value":"ED03","system":"EIA generator ID"},{"value":"Desert Star Energy Center","system":"CAISO participating-resource name"},{"value":"Desert Star Energy Center (419.25 MW NQC)","system":"CAISO NQC market-resource record"},{"value":"ER12-989-000","system":"FERC docket"},{"value":"ER12-988-000","system":"FERC related docket"}] — 2026 NQC List · confidence: medium
- Identifiers: [{"value":"55077","system":"EIA plant ID"},{"value":"5695","system":"EIA utility/entity ID"},{"value":"ED01","system":"EIA generator ID"},{"value":"ED02","system":"EIA generator ID"},{"value":"ED03","system":"EIA generator ID"},{"value":"Desert Star Energy Center","system":"CAISO participating-resource name"},{"value":"Desert Star Energy Center (419.25 MW NQC)","system":"CAISO NQC market-resource record"},{"value":"ER12-989-000","system":"FERC docket"},{"value":"ER12-988-000","system":"FERC related docket"}] — Memorandum · confidence: medium
- Description: Desert Star Energy Center is an operating natural gas-fired combined-cycle facility in Boulder City, Clark County, Nevada, identified by EIA as plant 55077. EIA's operating-generator record associates the plant with entity 5695, Desert Star Energy Center SDG&E, and generators ED01, ED02, and ED03. SDG&E describes the facility as a 480 MW plant with two Siemens 501-FC combustion turbines and a Westinghouse steam turbine. Formerly known as the El Dorado Power Plant, it entered SDG&E ownership on October 1, 2011, and is interconnected at the Merchant 230 kV switchyard within the CAISO balancing-authority area. — Source · confidence: medium
- Description: Desert Star Energy Center is an operating natural gas-fired combined-cycle facility in Boulder City, Clark County, Nevada, identified by EIA as plant 55077. EIA's operating-generator record associates the plant with entity 5695, Desert Star Energy Center SDG&E, and generators ED01, ED02, and ED03. SDG&E describes the facility as a 480 MW plant with two Siemens 501-FC combustion turbines and a Westinghouse steam turbine. Formerly known as the El Dorado Power Plant, it entered SDG&E ownership on October 1, 2011, and is interconnected at the Merchant 230 kV switchyard within the CAISO balancing-authority area. — Source · confidence: medium
- Identifiers.0: {"value":"55077","system":"EIA plant ID"} — Source · confidence: high
- Identifiers.1: {"value":"5695","system":"EIA utility/entity ID"} — Source · confidence: high
- Identifiers.2: {"value":"ED01","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.3: {"value":"ED02","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.4: {"value":"ED03","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.5: {"value":"Desert Star Energy Center","system":"CAISO participating-resource name"} — Resource category and phase · confidence: medium
- Identifiers.6: {"value":"Desert Star Energy Center (419.25 MW NQC)","system":"CAISO NQC market-resource record"} — 2026 NQC List · confidence: medium
- Identifiers.7: {"value":"ER12-989-000","system":"FERC docket"} — Memorandum · confidence: medium
- Identifiers.8: {"value":"ER12-988-000","system":"FERC related docket"} — Memorandum · confidence: medium
- Parties.3: {"relationship":"Combustion-turbine OEM","name":"Siemens","official_url":"https://www.siemens-energy.com"} — Source · confidence: medium
- Parties.4: {"relationship":"Steam-turbine OEM","name":"Westinghouse","official_url":null} — Source · confidence: medium
- Unit configuration: Natural-gas-fired combined cycle with two Siemens 501-FC combustion turbines and one Westinghouse steam turbine. — Source · confidence: medium
- Construction scope: Operating natural-gas combined-cycle facility comprising two combustion turbine generators, two heat-recovery steam generators (HRSGs), and one steam-turbine generator. SDG&E identifies the combustion turbines as Siemens 501-FC units and the steam turbine as Westinghouse. — Source · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html — SGT6-5000F Heavy-duty gas turbine (60 Hz) · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html — Steam turbines · confidence: medium
- Kind: thermal — Source · confidence: high
- Equipment models: [{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html","count":2,"unit_mw":null,"name":"Siemens 501-FC combustion turbine"},{"manufacturer_domain":"westinghouse.com","product_url":null,"count":1,"unit_mw":185,"name":"Westinghouse steam turbine generator"},{"manufacturer_domain":null,"product_url":null,"count":2,"unit_mw":null,"name":"Heat recovery steam generator (HRSG)"}] — Source · confidence: medium
- Product family: Siemens 501-FC combustion turbines; Westinghouse steam turbine — Source · confidence: medium
- Manufacturer name: Siemens and Westinghouse — Source · confidence: high
- Equipment models.0: {"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html","count":2,"unit_mw":null,"name":"Siemens 501-FC combustion turbine"} — Source · confidence: medium
- Equipment models.1: {"manufacturer_domain":"westinghouse.com","product_url":null,"count":1,"unit_mw":185,"name":"Westinghouse steam turbine generator"} — Source · confidence: medium
- Description: Desert Star Energy Center is a natural-gas-fired combined-cycle facility near Boulder City in Clark County, Nevada. SDG&E describes the plant as a 480 MW facility with two Siemens 501-FC combustion turbines and a Westinghouse steam turbine. Originally developed as El Dorado Energy by Sempra Energy Resources and Reliant Energy Power Generation, the plant began commercial operations in May 2000, and Sempra acquired full ownership in July 2005. SDG&E acquired El Dorado Energy LLC from the Sempra group on October 1, 2011, renamed the facility Desert Star Energy Center, and subsequently placed it within the CAISO balancing-authority area through the Merchant 230 kV interconnection. — Source · confidence: medium
- Description: Desert Star Energy Center is a natural-gas-fired combined-cycle facility near Boulder City in Clark County, Nevada. SDG&E describes the plant as a 480 MW facility with two Siemens 501-FC combustion turbines and a Westinghouse steam turbine. Originally developed as El Dorado Energy by Sempra Energy Resources and Reliant Energy Power Generation, the plant began commercial operations in May 2000, and Sempra acquired full ownership in July 2005. SDG&E acquired El Dorado Energy LLC from the Sempra group on October 1, 2011, renamed the facility Desert Star Energy Center, and subsequently placed it within the CAISO balancing-authority area through the Merchant 230 kV interconnection. — printmgr file · confidence: medium
- Description: Desert Star Energy Center is a natural-gas-fired combined-cycle facility near Boulder City in Clark County, Nevada. SDG&E describes the plant as a 480 MW facility with two Siemens 501-FC combustion turbines and a Westinghouse steam turbine. Originally developed as El Dorado Energy by Sempra Energy Resources and Reliant Energy Power Generation, the plant began commercial operations in May 2000, and Sempra acquired full ownership in July 2005. SDG&E acquired El Dorado Energy LLC from the Sempra group on October 1, 2011, renamed the facility Desert Star Energy Center, and subsequently placed it within the CAISO balancing-authority area through the Merchant 230 kV interconnection. — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: medium
- Quality notes: ["Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW.","The original project-finance record identifies a $158 million senior-secured credit facility covering construction and 15-year term financing; this is distinct from the later $132 million purchase of Reliant's interest and SDG&E's approximately $214 million acquisition consideration.","The cited history establishes operation through the ownership-transfer and interconnection records but does not establish a retirement, expansion, or repowering milestone."] — Sempra Energy 1999 Annual Report · confidence: medium
- Quality notes: ["Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW.","The original project-finance record identifies a $158 million senior-secured credit facility covering construction and 15-year term financing; this is distinct from the later $132 million purchase of Reliant's interest and SDG&E's approximately $214 million acquisition consideration.","The cited history establishes operation through the ownership-transfer and interconnection records but does not establish a retirement, expansion, or repowering milestone."] — S I M P LY S TAT E D. S I M P LY S TAT E D. · confidence: medium
- Quality notes: ["Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW.","The original project-finance record identifies a $158 million senior-secured credit facility covering construction and 15-year term financing; this is distinct from the later $132 million purchase of Reliant's interest and SDG&E's approximately $214 million acquisition consideration.","The cited history establishes operation through the ownership-transfer and interconnection records but does not establish a retirement, expansion, or repowering milestone."] — Source · confidence: medium
- Financing summary: El Dorado Energy was initially funded equally by Sempra Energy Resources and Reliant Energy Power Generation. In October 1998, the project obtained a $158 million senior-secured credit facility covering construction and 15-year term financing; Sempra reported $55 million invested by December 31, 1999, and a 2000 annual report described total project cost as $280 million. In July 2005, Sempra Generation acquired Reliant's remaining 50% interest for $132 million including assumed debt; the expected payment to Reliant net of project debt and closing adjustments was approximately $75 million. On October 1, 2011, SDG&E acquired El Dorado Energy LLC at approximately $214 million, based on member equity and the net balance of affiliate loans; a regulatory filing had estimated the purchase price at $215.1 million. — Sempra Energy 1999 Annual Report · confidence: medium
- Financing summary: El Dorado Energy was initially funded equally by Sempra Energy Resources and Reliant Energy Power Generation. In October 1998, the project obtained a $158 million senior-secured credit facility covering construction and 15-year term financing; Sempra reported $55 million invested by December 31, 1999, and a 2000 annual report described total project cost as $280 million. In July 2005, Sempra Generation acquired Reliant's remaining 50% interest for $132 million including assumed debt; the expected payment to Reliant net of project debt and closing adjustments was approximately $75 million. On October 1, 2011, SDG&E acquired El Dorado Energy LLC at approximately $214 million, based on member equity and the net balance of affiliate loans; a regulatory filing had estimated the purchase price at $215.1 million. — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: medium
- Timeline: [{"event":"El Dorado Energy partnership formed","date":"1997","detail":"Sempra Energy Resources and Reliant Energy Power Generation formed the El Dorado Energy project as a joint venture."},{"event":"Construction began","date":"1998-04","detail":"El Dorado Energy began construction of a 480 MW natural-gas-fired power plant near Boulder City, Nevada."},{"event":"Construction and term financing arranged","date":"1998-10","detail":"The project obtained a $158 million senior-secured credit facility covering construction financing and 15-year term financing."},{"event":"Commercial operation began","date":"2000-05","detail":"The El Dorado power plant began commercial operations near Las Vegas; contemporary Sempra records described it as a 480 MW plant, while an older annual-report passage used a 500 MW rating."},{"event":"Sempra acquired Reliant's ownership interest","date":"2005-07","detail":"Sempra Generation purchased Reliant Energy's remaining 50% interest in El Dorado for $132 million including assumed debt, giving Sempra full ownership."},{"event":"CPUC approved SDG&E purchase option","date":"2007-11-16","detail":"CPUC Decision D.07-11-046 approved SDG&E's request to exercise an option to purchase the El Dorado power plant from El Dorado Energy LLC, a Sempra affiliate."},{"event":"SDG&E acquired and renamed the facility","date":"2011-10-01","detail":"SDG&E assumed ownership of El Dorado Energy LLC and the plant was renamed Desert Star Energy Center. The final acquisition consideration was approximately $214 million, compared with an earlier estimate of $215.1 million."},{"event":"CAISO interconnection transition planned","date":"2012-05","detail":"The CAISO large-generator interconnection agreement anticipated reconfiguration of the Merchant and El Dorado substations so the facility would move from the Nevada Energy balancing area into the CAISO balancing-authority area, with direct CAISO interconnection anticipated around May 1, 2012."}] — Sempra Energy 1999 Annual Report · confidence: medium
- Timeline: [{"event":"El Dorado Energy partnership formed","date":"1997","detail":"Sempra Energy Resources and Reliant Energy Power Generation formed the El Dorado Energy project as a joint venture."},{"event":"Construction began","date":"1998-04","detail":"El Dorado Energy began construction of a 480 MW natural-gas-fired power plant near Boulder City, Nevada."},{"event":"Construction and term financing arranged","date":"1998-10","detail":"The project obtained a $158 million senior-secured credit facility covering construction financing and 15-year term financing."},{"event":"Commercial operation began","date":"2000-05","detail":"The El Dorado power plant began commercial operations near Las Vegas; contemporary Sempra records described it as a 480 MW plant, while an older annual-report passage used a 500 MW rating."},{"event":"Sempra acquired Reliant's ownership interest","date":"2005-07","detail":"Sempra Generation purchased Reliant Energy's remaining 50% interest in El Dorado for $132 million including assumed debt, giving Sempra full ownership."},{"event":"CPUC approved SDG&E purchase option","date":"2007-11-16","detail":"CPUC Decision D.07-11-046 approved SDG&E's request to exercise an option to purchase the El Dorado power plant from El Dorado Energy LLC, a Sempra affiliate."},{"event":"SDG&E acquired and renamed the facility","date":"2011-10-01","detail":"SDG&E assumed ownership of El Dorado Energy LLC and the plant was renamed Desert Star Energy Center. The final acquisition consideration was approximately $214 million, compared with an earlier estimate of $215.1 million."},{"event":"CAISO interconnection transition planned","date":"2012-05","detail":"The CAISO large-generator interconnection agreement anticipated reconfiguration of the Merchant and El Dorado substations so the facility would move from the Nevada Energy balancing area into the CAISO balancing-authority area, with direct CAISO interconnection anticipated around May 1, 2012."}] — printmgr file · confidence: medium
- Timeline: [{"event":"El Dorado Energy partnership formed","date":"1997","detail":"Sempra Energy Resources and Reliant Energy Power Generation formed the El Dorado Energy project as a joint venture."},{"event":"Construction began","date":"1998-04","detail":"El Dorado Energy began construction of a 480 MW natural-gas-fired power plant near Boulder City, Nevada."},{"event":"Construction and term financing arranged","date":"1998-10","detail":"The project obtained a $158 million senior-secured credit facility covering construction financing and 15-year term financing."},{"event":"Commercial operation began","date":"2000-05","detail":"The El Dorado power plant began commercial operations near Las Vegas; contemporary Sempra records described it as a 480 MW plant, while an older annual-report passage used a 500 MW rating."},{"event":"Sempra acquired Reliant's ownership interest","date":"2005-07","detail":"Sempra Generation purchased Reliant Energy's remaining 50% interest in El Dorado for $132 million including assumed debt, giving Sempra full ownership."},{"event":"CPUC approved SDG&E purchase option","date":"2007-11-16","detail":"CPUC Decision D.07-11-046 approved SDG&E's request to exercise an option to purchase the El Dorado power plant from El Dorado Energy LLC, a Sempra affiliate."},{"event":"SDG&E acquired and renamed the facility","date":"2011-10-01","detail":"SDG&E assumed ownership of El Dorado Energy LLC and the plant was renamed Desert Star Energy Center. The final acquisition consideration was approximately $214 million, compared with an earlier estimate of $215.1 million."},{"event":"CAISO interconnection transition planned","date":"2012-05","detail":"The CAISO large-generator interconnection agreement anticipated reconfiguration of the Merchant and El Dorado substations so the facility would move from the Nevada Energy balancing area into the CAISO balancing-authority area, with direct CAISO interconnection anticipated around May 1, 2012."}] — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: medium
- Commercial parties.2: {"relationship":"Former owner and 2011 seller","name":"El Dorado Energy, LLC","detail":"Sempra Energy affiliate that owned the El Dorado plant before SDG&E acquired the company and facility on October 1, 2011.","official_url":null} — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: high
- Commercial parties.4: {"relationship":"Combustion-turbine OEM","name":"Siemens","detail":"SDG&E identifies two Siemens 501-FC combustion turbines at the facility.","official_url":"https://www.siemens-energy.com"} — Source · confidence: medium
- Commercial parties.5: {"relationship":"Steam-turbine OEM","name":"Westinghouse","detail":"SDG&E identifies a Westinghouse steam turbine in the combined-cycle configuration.","official_url":null} — Source · confidence: medium
- Timeline.0: {"event":"El Dorado Energy partnership formed","date":"1997","detail":"Sempra Energy Resources and Reliant Energy Power Generation formed the El Dorado Energy project as a joint venture."} — Sempra Energy 1999 Annual Report · confidence: high
- Timeline.1: {"event":"Construction began","date":"1998-04","detail":"El Dorado Energy began construction of a 480 MW natural-gas-fired power plant near Boulder City, Nevada."} — Sempra Energy 1999 Annual Report · confidence: high
- Timeline.2: {"event":"Construction and term financing arranged","date":"1998-10","detail":"The project obtained a $158 million senior-secured credit facility covering construction financing and 15-year term financing."} — Sempra Energy 1999 Annual Report · confidence: high
- Timeline.3: {"event":"Commercial operation began","date":"2000-05","detail":"The El Dorado power plant began commercial operations near Las Vegas; contemporary Sempra records described it as a 480 MW plant, while an older annual-report passage used a 500 MW rating."} — printmgr file · confidence: high
- Timeline.4: {"event":"Sempra acquired Reliant's ownership interest","date":"2005-07","detail":"Sempra Generation purchased Reliant Energy's remaining 50% interest in El Dorado for $132 million including assumed debt, giving Sempra full ownership."} — printmgr file · confidence: high
- Timeline.5: {"event":"CPUC approved SDG&E purchase option","date":"2007-11-16","detail":"CPUC Decision D.07-11-046 approved SDG&E's request to exercise an option to purchase the El Dorado power plant from El Dorado Energy LLC, a Sempra affiliate."} — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: high
- Timeline.6: {"event":"SDG&E acquired and renamed the facility","date":"2011-10-01","detail":"SDG&E assumed ownership of El Dorado Energy LLC and the plant was renamed Desert Star Energy Center. The final acquisition consideration was approximately $214 million, compared with an earlier estimate of $215.1 million."} — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: high
- Quality notes.0: Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW. — Sempra Energy 1999 Annual Report · confidence: medium
- Quality notes.0: Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW. — S I M P LY S TAT E D. S I M P LY S TAT E D. · confidence: medium
- Quality notes.1: The original project-finance record identifies a $158 million senior-secured credit facility covering construction and 15-year term financing; this is distinct from the later $132 million purchase of Reliant's interest and SDG&E's approximately $214 million acquisition consideration. — Sempra Energy 1999 Annual Report · confidence: high
- Quality notes.1: The original project-finance record identifies a $158 million senior-secured credit facility covering construction and 15-year term financing; this is distinct from the later $132 million purchase of Reliant's interest and SDG&E's approximately $214 million acquisition consideration. — E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account · confidence: high
- Quality notes.2: The cited history establishes operation through the ownership-transfer and interconnection records but does not establish a retirement, expansion, or repowering milestone. — Source · confidence: medium

## Sources

- [Source](https://www.sdge.com/sites/default/files/regulatory/Prepared%20Direct%20Testimony%20of%20Kevin%20Counts.pdf) — sdge.com · tier other
- [Source](https://api.eia.gov/v2/electricity/operating-generator-capacity/data/?api_key=DEMO_KEY&frequency=monthly&data%5B0%5D=nameplate-capacity-mw&data%5B1%5D=net-summer-capacity-mw&data%5B2%5D=net-winter-capacity-mw&data%5B3%5D=operating-year-month&data%5B4%5D=county&facets%5Bplantid%5D%5B%5D=55077&sort%5B0%5D%5Bcolumn%5D=period&sort%5B0%5D%5Bdirection%5D=desc&offset=0&length=5000) — api.eia.gov · tier regulatory
- [February 3, 2012 The Honorable Kimberly D. Bose ...](https://www.caiso.com/documents/2012-02-03_er12-989_desertstarenergylgia.pdf) — caiso.com · tier other
- [2026 NQC List](https://www.caiso.com/documents/net-qualifying-capacity-report-for-compliance-year-2026.xlsx) — caiso.com · tier other
- [Memorandum](https://www.caiso.com/documents/regulatoryreport-may2012.pdf) — caiso.com · tier other
- [E-4465 Final Res approves SDG&E's purchase price of the El Dorado Power Plant and the proposed revenue requirement for non-fuel costs beginning 10/1/11 - 12/1/15. Revenues will be tracked through SDG&E's Non-Fuel Generation Balancing Account](https://docs.cpuc.ca.gov/PUBLISHED/FINAL_RESOLUTION/172153.htm) — docs.cpuc.ca.gov · tier regulatory
- [Source](https://www.sdge.com/sites/default/files/regulatory/SDGE-14-E_Errata_Direct_Testimony_of_Daniel_Baerman_Electric_Generation_Clean_0.pdf) — sdge.com · tier other
- [Resource category and phase](https://www.caiso.com/documents/resourcecategoryandphaseallparticipatingresourceids.xlsx) — caiso.com · tier other
- [Source](https://sdge.com/sites/default/files/regulatory/Prepared%20Direct%20Testimony%20of%20Kevin%20Counts.pdf) — sdge.com · tier other
- [SGT6-5000F Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html) — siemens-energy.com · tier other
- [Steam turbines](https://www.siemens-energy.com/global/en/home/products-services/product-offerings/steam-turbines.html) — siemens-energy.com · tier other
- [Sempra Energy 1999 Annual Report](https://www.nrc.gov/docs/ml0037/ML003743149.pdf) — nrc.gov · tier regulatory
- [printmgr file](https://www.annualreports.com/HostedData/AnnualReportArchive/s/NYSE_SRE_2005.pdf) — annualreports.com · tier other
- [S I M P LY S TAT E D . S I M P LY S TAT E D .](https://www.annualreports.com/HostedData/AnnualReportArchive/s/NYSE_SRE_2000.pdf) — annualreports.com · tier other
- [Table_6_06](https://www.eia.gov/electricity/monthly/xls/table_6_06.xlsx) — eia.gov · tier regulatory
- [Desert Star energy center](https://www.gem.wiki/Desert_Star_energy_center) — gem.wiki · tier other

## Data quality

- Capacity figures vary by source and rating convention: later SDG&E and CAISO records identify a 480 MW nominal or maximum-net facility, with one CAISO record also stating a 492 MW nameplate rating, while an older Sempra annual report describes the plant as 500 MW. The cited history establishes operation through the ownership-transfer and interconnection records but does not establish a retirement, expansion, or repowering milestone.

---