# Digi Power X North Tonawanda

NYISO data center · https://askthegrid.com/assets/facilities/digi-power-x-north-tonawanda

Digi Power X (formerly Digihost) owns a 60 MW gas-fired power plant in North Tonawanda, New York, the former Fortistar North Tonawanda plant at 1070 Erie Avenue, acquired in February 2023 after FERC and PSC approvals. Its bitcoin mining infrastructure sits beside the plant, and the city approved container slabs there in 2021. The plant also runs as a peaker for NYISO, and Digihost joined a fast-acting NYISO curtailment program. The company reports 123 MW secured in North Tonawanda and is evaluating conversion of its New York facilities to data centers.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 1070 Erie Avenue, North Tonawanda, NY

## Power and grid context

- Reported unspecified: 60 MW · reported · exact asset — 60 MW gas-fired power plant acquired February 2023; basis unspecified.
- Reported unspecified: 123 MW · reported · campus — 123 MW secured in North Tonawanda per the December 2025 shareholder letter; basis unspecified.
- Balancing authority: NYISO

## Compute and operations

- Facility classes: crypto_mining

## Sources

- [FRS Facility Detail Report | Envirofacts | US EPA](https://frs-public.epa.gov/ords/frs_public2/fii_query_dtl.disp_program_facility?p_registry_id=110001599958)
- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1070+Erie+Avenue%2C+North+Tonawanda%2C+NY%2C+14120&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Digi Power X Announces ARMS 200 Commissioning and Timetable for Generating its First AI Revenues](https://investor.wedbush.com/wedbush/article/accwirecq-2026-3-2-digi-power-x-announces-arms-200-commissioning-and-timetable-for-generating-its-first-ai-revenues)
- [Digihost Provides Update on Power Plant Acquisition](https://investor.wedbush.com/wedbush/article/gnwcq-2023-1-20-digihost-provides-update-on-power-plant-acquisition)
- [Digihost Announces Completion of Power Plant Acquisition](https://investor.wedbush.com/wedbush/article/gnwcq-2023-2-8-digihost-announces-completion-of-power-plant-acquisition)
- [Digihost Provides Update on Green Initiatives, Operational Efficiencies and Sustainability](https://investor.wedbush.com/wedbush/article/gnwcq-2023-7-5-digihost-provides-update-on-green-initiatives-operational-efficiencies-and-sustainability)
- [Digi Power X Provides Letter to Shareholders on 2025 Highlights and Strategic Update](https://investor.wedbush.com/wedbush/article/gnwcq-2025-12-24-digi-power-x-provides-letter-to-shareholders-on-2025-highlights-and-strategic-update)
- [Digi Power X Expands Digital Asset Holdings and Accelerates Pivot to AI Infrastructure with Alabama Build-Out and Reports August 2025 Production Results](https://investor.wedbush.com/wedbush/article/gnwcq-2025-9-2-digi-power-x-expands-digital-asset-holdings-and-accelerates-pivot-to-ai-infrastructure-with-alabama-build-out-and-reports-august-2025-production-results)
- [Global Network | DigiPowerX - Multi-region US Footprint](https://www.digipowerx.com/global-network)
- [https://www.northtonawanda.org/file-library/100179/PlanningBoard090821.pdf](https://www.northtonawanda.org/file-library/100179/PlanningBoard090821.pdf)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---