# Digital Realty — 1505 Ferris Road

ERCOT data center · https://askthegrid.com/assets/facilities/digital-realty-1505-ferris-road

Digital Realty's Project Gold Garland is a permitted 181,200-square-foot colocation facility at 1505 Ferris Road in Garland, Texas, with scheduled construction completion in August 2024. The facility was designed to deliver 16 MW and was reported under construction in 2024; actual commercial operation was not explicitly verified.

## Identity and location

- Operating status: unknown
- Asset scope: building
- Location: 1505 Ferris Road, Garland, Dallas County, TX
- Operator: Digital Realty (exact asset) — https://www.digitalrealty.com/
- Regulator: Texas Department of Licensing and Regulation (exact asset) — https://www.tdlr.texas.gov/

## Power and grid context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: Oncor (primary, reported by local data‑center directories); Trinity Valley Elec Coop reported by datacenter.fyi (unverified)

## Development

- Site status: Permitted and reported under construction in 2024; the permit's scheduled construction completion was August 1, 2024. Actual commercial operation was not explicitly verified.
- Site area: 15 acres
- Gross floor area: 181,200 square feet
- Buildings: 1
- Construction: Digital Realty’s Project Gold Garland at 1505 Ferris Road is a privately funded, privately owned new-construction data center. The TDLR permit describes a one-story approximately 181,200-square-foot facility with core and shell, a visitor center, guard house, and associated site improvements. The permit listed construction from February 1, 2023, through August 1, 2024; a later industry report described the project as under construction in March 2024. Commercial operation was not explicitly documented.

## Compute and operations

- Facility classes: colocation
- Announced tenants: Wells Fargo
- Operating context: Digital Realty's Project Gold Garland is a one-story, approximately 181,200-square-foot data-center building at 1505 Ferris Road. The official permit record lists new construction with an August 1, 2024 completion date and review complete; a secondary facility listing describes the exact site as operational. Public sources describe Digital Realty's broader operating model as colocation and interconnection for enterprise and cloud customers, but do not disclose site-specific operating procedures.

## Sources

- [Digital Realty: 1505 Ferris Data Center](https://baxtel.com/data-center/digital-realty-1505-ferris)
- [Dec 06, 2022 City Council - Garland, TX](https://garlandtx.new.swagit.com/videos/190629)
- [Digital Realty DFW37: See All services with pricing](https://inflect.com/building/1505-ferris-road-garland/digital-realty/datacenter/dfw37)
- [Form 10-K for Digital Realty Trust INC filed 02/23/2024](https://investor.digitalrealty.com/static-files/161d3ffe-ffde-4cd6-9577-29d2602af5f5)
- [Digital Realty GRL-DR-DFW37 — Garland, TX](https://mlq.ai/permit-filings/usa/texas/garland/grl-dr-dfw37/)
- [Digital Realty TABS2023013251 — Garland, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/garland/tabs2023013251/)
- [Fetched web page](https://public.destinyhosted.com/garladocs/2022/CCWS/20221017_3635/AGENDApacket__10-17-22_0124_3628.pdf)
- [Digital Realty: 1505 Ferris Data Center](https://www.baxtel.com/data-center/digital-realty-1505-ferris)
- [Digital Realty: DFW37 Data Center](https://www.baxtel.com/data-center/digital-realty-dfw37)
- [Digital Realty Project Gold](https://www.carrcopainting.com/projects/digital-realty)
- [Digital Realty, Mitsubishi Form Data Center JV](https://www.commercialsearch.com/news/digital-realty-mitsubishi-form-data-center-jv/)
- [Digital Realty-Project Gold Garland PBB - Garland, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/digital-realty-project-gold-garland-pbb-3e0b0e33)
- [Digital Realty files to expand planned data center campus in Garland, Texas - DCD](https://www.datacenterdynamics.com/en/news/digital-realty-files-to-expand-planned-data-center-campus-in-garland-texas/) — Data Center Dynamics · 2024-09-14
- [Dallas Data Centers - 192 Facilities from 51 Operators](https://www.datacentermap.com/usa/texas/dallas/)
- [1505 Ferris Rd Data Center in Dallas | Digital Realty](https://www.datacentermap.com/usa/texas/dallas/1505-ferris-rd/)
- [Digital Realty | Data Center Services & Colocation](https://www.digitalrealty.com/)
- [News Flash • Garland, TX • CivicEngage](https://www.garlandtx.gov/CivicAlerts.asp?AID=205&ARC=6048)
- [ERCOT adopts stricter rules for data center seeking grid ...](https://www.houstonchronicle.com/business/energy/article/ercot-grid-data-centers-22288310.php)
- [Atlanta Data Center Market Update Q3 2023 | PDF](https://www.scribd.com/document/754551168/Americas-Oct-2023-Data-Center-Update)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023002649)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023002649)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013251)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013252)
- [DLR DFW39 Project Gold Garland | U.S. Green Building Council](https://www.usgbc.org/projects/dlr-dfw39-project-gold-garland) — U.S. Green Building Council

## Data quality

- The official TDLR record identifies the exact asset as Digital Realty-Project Gold Garland, TABS2023002649, at 1505 Ferris Road, Garland, Dallas County, Texas. It describes new construction of an approximately 181,200-square-foot, one-story data center, with an estimated cost of $59.4 million and a completion date of August 1, 2024.
- The official TDLR record lists the owner as Digital Lewisville, LLC and the tenant as not assigned. The Wells Fargo tenant claim comes from Data Center Dynamics and is not confirmed in the TDLR record.
- Projects at 1502 Ferris Road and 1702 West Campbell Road were excluded from exact-asset findings even though they are part of the broader Digital Realty Garland campus.
- The reviewed sources did not establish MW, water use, PUE, WUE, generator counts, or other technical operating characteristics for this exact building.
- The city agenda endpoint for the 2024 incentive items returned a database error; the incentive terms are therefore reported as trade-news claims rather than independently verified city-record facts.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/digital-realty-1505-ferris-road
Profile generated: 2026-07-27T23:45:13.397201Z
Source: Ask the Grid — https://askthegrid.com/
