# Diversion Wind Energy LLC

SPP asset profile · https://askthegrid.com/assets/facilities/diversion-wind-energy-llc

## Current generation inventory

EIA plant 67601 · Inventory reporting month: 2026-08.

- wind: 200.6 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -99.02301, 33.719262
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2026-01-08 13:57:39+00:00
- Map prepared: 2026-10-10T02:28:18.299164+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Diversion Wind Energy LLC is a 200.6 MW onshore wind turbine plant in Baylor County. Diversion is a 200.6 MW wind project in Baylor County, Texas, developed by Invenergy. SWEPCO, the American Electric Power utility, sought approval from regulators in Arkansas, Louisiana and Texas to acquire it, with commercial operation expected in December 2024.

## Reviewed metrics

- **Nameplate capacity:** 200.6 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 67601 — plant-67601

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Southwestern Electric Power Co

## Sources

- [aep.com](https://aep.com/news/releases/read/8532/SWEPCO-Seeks-Approval-for-Three-New-Wind-and-Solar-Projects) — aep.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/diversion-wind-energy-llc

Source: Ask the Grid — https://askthegrid.com/