# DXC Technology Data Center — 15555 Cutten Road

ERCOT data center · https://askthegrid.com/assets/facilities/dxc-technology-data-center-15555-cutten-road

Serverfarm owns and operates the HOU2/CTX1 campus at 15555 Cutten Road in Houston, an existing two-building hyperscale facility totaling 478,257 square feet currently serving 100 MW target critical IT load. The campus is expanding with Project Longhorn (interior remodel, $3 million) and CTX2 (new 438,000-square-foot building with 60 MW capacity, under construction through July 2026).

## Identity and location

- Operating status: expanding
- Asset scope: campus
- Location: 15555 Cutten Road, Houston, Harris County, Texas
- Owner: Serverfarm (campus) — https://www.serverfarmllc.com/
- Operator: Serverfarm (campus) — https://www.serverfarmllc.com/ctx1-houston-data-center/
- Developer: Serverfarm (campus) — https://www.serverfarmllc.com/

## Power and grid context

- Critical it load: 100 MW · target · campus · as of 2024-09-12 — Serverfarm lists 100 MW of IT capacity for CTX1; separate reporting describes HOU2 as having secured customer capacity to scale to 100 MW using available existing grid power.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: CenterPoint Energy
- Substation: On-site substation(s); no substation name was disclosed.

## Development

- Site status: Operating and expanding: CTX1/HOU2 is an existing two-building campus, while Project Longhorn modernization and the separate CTX2 expansion are documented at the same 15555 Cutten Road site.
- Gross floor area: 478,257 square feet
- Buildings: 2
- Construction: Serverfarm acquired the former HP/DXC-associated HOU2 campus in September 2024 and is modernizing the existing two-building CTX1 campus. Project Longhorn is a 264,514-square-foot interior tenant remodel permitted for February 28-August 29, 2025. Separately, CTX2 is a 438,000-square-foot ground-up data center adjacent to the existing campus, permitted for construction from July 11, 2025 through July 10, 2026; it was reported topped out by February 10, 2026.

## Compute and operations

- Facility classes: hyperscale
- Workloads: hyperscale workloads, high-performance workloads
- Operating context: Serverfarm operates CTX1/HOU2 as an expandable, hyperscale-oriented data-center campus with two buildings. The official specification lists 175 MVA of utility capacity, 100 MW of IT capacity, N+1 cooling, and Serverfarm’s DMaaS/InCommand infrastructure-management platform.

## Sources

- [Serverfarm Tops Out 60MW CTX2 A.I Campus Facility in Houston, Texas.](https://constructionreviewonline.com/serverfarm-tops-out-latest-60-mw-ctx2-a-i-campus-facility-in-houston-texas/)
- [Serverfarm Data Center (CTX 1, CTX 2) Construction Change](https://datacenterbuildout.com/site/serverfarm-data-center-ctx-1-ctx-2/)
- [Serverfarm CTX1 | 15555 Cutten Road, Houston - datacenterHawk](https://datacenterhawk.com/marketplace/providers/serverfarm/15555-cutten-road/ctx1)
- [Serverfarm Buys Two Houston Data Centers](https://www.connectcre.com/stories/serverfarm-buys-two-houston-data-centers/)
- [News | Developer lands $3 billion to finance North American data center pipeline](https://www.costar.com/article/1119520037/developer-lands-3-billion-to-finance-north-american-data-center-pipeline)
- [DXC Technology Data Center(bc6b9f32) - Austin, TX](https://www.datacenter.fyi/public-record/dxc-technology-bc6b9f32)
- [Serverfarm acquires two data centers in Houston, Texas - DCD](https://www.datacenterdynamics.com/en/news/serverfarm-acquires-two-data-centers-in-houston-texas/) — Data Center Dynamics · 2024-09-12
- [Serverfarm files to build two more data centers in Houston, Texas - DCD](https://www.datacenterdynamics.com/en/news/serverfarm-files-to-build-two-more-data-centers-in-houston-texas/) — Data Center Dynamics · 2025-03-25
- [Serverfarm tops out Houston data center in Texas - DCD](https://www.datacenterdynamics.com/en/news/serverfarm-tops-out-houston-data-center-in-texas/) — Data Center Dynamics · 2026-02-09
- [About ERCOT](https://www.ercot.com/about)
- [How does the PUC regulate ERCOT and CenterPoint?](https://www.houstonchronicle.com/business/energy/article/public-utility-commission-texas-ercot-19553378.php)
- [15555 Cutten Rd, Houston, TX 77070 - APN/Parcel ID](https://www.loopnet.com/property/15555-cutten-rd-houston-tx-77070/48201-1200060010008/)
- [Dxc - 15555 Cutten Rd, Houston, TX, 77070-3958](https://www.mapquest.com/us/texas/dxc-476079401)
- [Manulife-backed Serverfarm acquires two data centers providing over 500MW of new potential capacity in the Houston market](https://www.prnewswire.com/news-releases/manulife-backed-serverfarm-acquires-two-data-centers-providing-over-500mw-of-new-potential-capacity-in-the-houston-market-302244468.html)
- [Data center being build right next to the vintage on Cutten ...](https://www.reddit.com/r/houston/comments/1psg066/data_center_being_build_right_next_to_the_vintage/) — Reddit — r/houston
- [Data center being build right next to the vintage on Cutten and louetta? : r/houston](https://www.reddit.com/r/houston/comments/1psg066/data_center_being_build_right_next_to_the_vintage_on_cutten/)
- [Serverfarm | Data Center Developer & Operator](https://www.serverfarmllc.com/)
- [HOU1 & HOU2 - AI Campuses for Near Term Capacity](https://www.serverfarmllc.com/blog/serverfarm-hou1-and-hou2-ai-campuses-for-near-term-capacity-and-phased-development-of-scale-out-sustainable-data-centers/)
- [CTX1 | Houston Data Center | Serverfarm](https://www.serverfarmllc.com/ctx1-houston-data-center)
- [CTX1 | Houston Data Center | Serverfarm](https://www.serverfarmllc.com/ctx1-houston-data-center/)
- [Data Center Locations | Digital Transformation | Serverfarm](https://www.serverfarmllc.com/data-centers/)
- [CTX1 | Houston Data Center | Serverfarm](https://www.serverfarmllc.com/hou2-houston-data-center/)
- [Manulife-Backed Serverfarm Acquires Two Data Centers Providing Over 500MW of New Potential Capacity in the Houston Market](https://www.serverfarmllc.com/press-releases/manulife-backed-serverfarm-acquires-two-data-centers-providing-over-500mw-of-new-potential-capacity-in-the-houston-market/)
- [Data Center Sustainability | Sustainable IT | Serverfarm](https://www.serverfarmllc.com/sustainability/)
- [Advanced Water Free Cooling System Eliminating Water Waste | AI-Ready Infrastructure](https://www.serverfarmllc.com/water-cooling-system/)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025014250)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025017595)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025010109)

## Data quality

- The exact asset is the former DXC-associated HOU2 campus at 15555 Cutten Road, now identified by Serverfarm as CTX1/HOU2; CTX2 is an expansion phase on the same campus.
- The TDLR CTX2 record identifies Serverfarm as owner, 15555 Cutten Road as the location, a 438,000-square-foot new data center, a $137 million estimated cost, and Review Complete status.
- Project Longhorn is a separate recorded renovation at 15515 and 15555 Cutten Road involving an interior tenant remodel of a server building.
- The 28401 Betka Road/HOU1 facility is a different Serverfarm site and was excluded.
- The Reddit source supports the existence of informal local discussion, but its technical claims about water, emissions, noise, and construction were not independently verified.
- The Reddit community is included as an informal discussion venue, not as a verified incorporated neighborhood or advocacy organization.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---