# Edged Project Atlas Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/edged-project-atlas-data-center-campus--grid-load-301f20678070e16b

Project Atlas is a proposed data center campus of three data center buildings, an administration building and a warehouse on about 411 acres along North Cedar Crest Boulevard in South Whitehall Township, Lehigh County, Pennsylvania. Edged US is the sponsor, and the revised plan is reported at 725 MW. The applicant proposes an onsite substation and 356 backup generators, and PPL would supply power through a new substation. The township planning commission took the plan under advisement in September 2026, and the decision deadline was extended to December 31, 2026.

## Identity and location

- Operating status: proposed
- Asset scope: campus
- Location: 2493 North Cedar Crest Boulevard, Allentown, Lehigh County County, PA
- Developer: Edged US (exact asset)
- Developer: CDE Acquisitions, LLC (exact asset)
- Owner: Jeras Corporation (exact asset)

## Power and grid context

- Reported unspecified: About 725 MW · proposed · exact asset — Reported capacity of the revised three-building campus; electrical basis not stated
- ISO/RTO: PJM
- Electric utility: Ppl Electric Utilities Corp
- Substation: Onsite electrical substation proposed with emergency generators at the data centers; the complex would be powered by a new PPL substation

## Development

- Site area: 410.653 acres
- Gross floor area: 1,556,702.71 square feet
- Construction: Industrial campus of three data center buildings, one administration building and one warehouse building, with the three lots consolidated into one

## Sources

- [South Whitehall Planning Commission takes Project Atlas under advisement &#8211; Lehigh Valley Press](https://www.lvpnews.com/20261002/south-whitehall-planning-commission-takes-project-atlas-under-advisement/)
- [Access Denied](https://www.southwhitehall.com/Home/Components/News/News/622/15)
- [www.pacodeandbulletin.gov](https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-42/56-42.pdf)
- [Project Atlas - A Lower-Impact Industrial Use for South Whitehall Township](https://projectatlaspa.com/)
- [Residents push for public hearing as South Whitehall takes new look at hyperscale data center | Lehigh Valley Public Media](https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/)
- [Atlas Data Center Update/Community FAQ - Parkland School District](https://www.parklandsd.org/about-us/atlas-data-center)
- [Just a moment...](https://www.datacenterdynamics.com/en/news/edged-eyes-725mw-data-center-campus-in-pennsylvania/)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2493+North+Cedar+Crest+Boulevard%2C+Allentown%2C+PA&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2493+North+Cedar+Crest+Boulevard%2C+Allentown%2C+PA&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Ahead of key meeting on South Whitehall data center plans, township identifies long list of concerns | Zoning &amp; Planning | wfmz.com](https://www.wfmz.com/news/local_government/zoning_planning/ahead-of-key-meeting-on-south-whitehall-data-center-plans-township-identifies-long-list-of/article_cd5d695d-8a76-497e-9305-c653e2a8ca6d.html)
- [Project Atlas meeting ends without decision; deadline to act on plan pushed to New Year’s Eve | Allentown Area | wfmz.com](https://www.wfmz.com/news/area/lehighvalley/lehigh-county/allentown-area/project-atlas-meeting-ends-without-decision-deadline-to-act-on-plan-pushed-to-new-year/article_098ff206-7c3e-483f-91b7-3765daaad2a6.html)
- [https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-75.541462319663%2C40.634283675953&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false](https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-75.541462319663%2C40.634283675953&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false)

---

Canonical page: https://askthegrid.com/assets/facilities/edged-project-atlas-data-center-campus--grid-load-301f20678070e16b
Profile generated: 2026-11-02T21:31:43.728101Z
Source: Ask the Grid — https://askthegrid.com/