Edwards Sanborn E1B is a hybrid solar and battery storage facility with 290.4 MW of EIA-reported total operating capacity and 136 MWh of reported storage energy capacity in Kern County, California, registered as EIA Plant ID 65674. Terra-Gen Operating Co-Hybrid is the registered plant entity or operator. Edwards Sanborn E1B is a phase of the broader Edwards Sanborn solar-plus-storage development, which has been described as one of the largest solar-and-storage facilities in the world and as a major contributor to the CAISO grid. The broader development was also described as the largest public-private collaboration in U.S. Department of Defense history; these distinctions apply to the combined development rather than to E1B alone.

## Key facts

- Technology: Batteries, Solar Photovoltaic
- Power capacity: 290.4 MW
- Energy capacity: 136 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO (CAISO)
- Substation: Winhub
- Point of interconnection: Winhub
- Transmission owner: Southern California Edison Company (SCE)
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: terra-gen.com — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Official project url: https://terra-gen.com/terragen_project/edwards-sanborn-1b — Edwards Sanborn 1B - Terra-Gen · confidence: medium
- Description: Edwards Sanborn E1B is an operational solar-and-battery power plant in Kern County, California, with EIA plant ID 65674. EIA's operating-generator inventory lists two generators: 154.4 MW of Solar Photovoltaic capacity and 136 MW of Batteries capacity, totaling 290.4 MW. The plant is in the California Independent System Operator balancing area. — Source · confidence: high
- Identifiers.0: {"value":"65674","system":"EIA plant ID"} — Source · confidence: high
- Identifiers.1: {"value":"64366","system":"EIA entity/operator ID"} — Source · confidence: high
- Identifiers.2: {"value":"BESS","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.3: {"value":"PV","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.4: {"value":"21GEN19759","system":"CAISO network-model resource"} — NRI · confidence: medium
- Identifiers.5: {"value":"866","system":"CAISO participating resource ID"} — Resource category and phase · confidence: medium
- Identifiers.6: {"value":"SANBRN_2_ES1BT3","system":"CAISO participating resource name"} — Resource category and phase · confidence: medium
- Parties.0: {"relationship":"Developer and owner","name":"Terra-Gen, LLC","official_url":"https://terra-gen.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Parties.2: {"relationship":"Co-owner and investor; acquired a 50% interest in ES1B with a limited partner and co-investor","name":"Axium Infrastructure","official_url":"https://www.axiuminfra.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Parties.5: {"relationship":"Multidiscipline engineering services provider","name":"Coffman Engineers","official_url":"https://www.coffman.com/news/edwards-sanborn-solar-energy-storage/"} — Edwards & Sanborn: US's Largest Solar Storage Project | Coffman Engineers · confidence: medium
- Interconnection: Windhub Substation, CAISO EdSan 1 / Q1324 / TOT819; Southern California Edison Co. is the transmission owner. The plant is reported at 230 kV, with CAISO queue records also referring to the Windhub 220 kV bus. — large generator interconnection agreement · confidence: medium
- Construction scope: Operational hybrid solar-and-battery plant with two EIA generating units: 154.4 MW of solar photovoltaic capacity and 136 MW of battery capacity, totaling 290.4 MW. The Q1324/EdSan 1 interconnection design specifies 54 Power Electronics HEM FS3430M integrated DC-coupled inverter modules for the relevant battery-plus-solar phase. First Solar supplied the solar modules, while LG Chem, Samsung, and BYD supplied batteries; phase-specific panel and battery-unit counts were not disclosed. — Source · confidence: medium
- Product url: https://power-electronics.com/en/solar/hem — HEM · confidence: medium
- Product url: https://power-electronics.com/en/solar/hem — Source · confidence: medium
- Manufacturer domain: power-electronics.com — HEM · confidence: high
- Equipment models: [{"manufacturer_domain":"power-electronics.com","product_url":"https://power-electronics.com/en/solar/hem","count":54,"unit_mw":3.43,"name":"Power Electronics HEM FS3430M integrated DC-coupled inverter module"},{"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar photovoltaic modules; exact model and E1B count not stated"},{"manufacturer_domain":"lgensol.com","product_url":null,"count":null,"unit_mw":null,"name":"LG Chem battery equipment; exact product family and E1B count not stated"},{"manufacturer_domain":"samsungsdi.com","product_url":"https://www.samsungsdi.com/upload/ess_brochure/201902_Samsung%20SDI%20ESS_EN.pdf","count":null,"unit_mw":null,"name":"Samsung battery equipment; exact product family and E1B count not stated"},{"manufacturer_domain":"bydenergy.com","product_url":"https://www.bydenergy.com/","count":null,"unit_mw":null,"name":"BYD battery equipment; exact product family and E1B count not stated"}] — Q4 2023 - Solar power—and battery storage—take off at Edwards Air Force Base : BackIssues, altenerG.com - enerG Alternative Sources Magazine - enerG,Archives · confidence: medium
- Product family: HEM FS3430M — Source · confidence: medium
- Product family: HEM FS3430M — HEM · confidence: medium
- Manufacturer name: Power Electronics — Source · confidence: high
- Equipment models.1: {"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar photovoltaic modules; exact model and E1B count not stated"} — Q4 2023 - Solar power—and battery storage—take off at Edwards Air Force Base : BackIssues, altenerG.com - enerG Alternative Sources Magazine - enerG,Archives · confidence: medium
- Equipment models.1: {"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar photovoltaic modules; exact model and E1B count not stated"} — Series 6 Family · confidence: medium
- Significance: Edwards Sanborn E1B is a phase of the broader Edwards Sanborn solar-plus-storage development, which has been described as one of the largest solar-and-storage facilities in the world and as a major contributor to the CAISO grid. The broader development was also described as the largest public-private collaboration in U.S. Department of Defense history; these distinctions apply to the combined development rather than to E1B alone. — Edwards & Sanborn: US's Largest Solar Storage Project | Coffman Engineers · confidence: medium
- Description: Edwards Sanborn E1B is an operational solar-and-battery power plant in Kern County, California, with EIA plant ID 65674 and 290.4 MW of listed nameplate capacity. Terra-Gen developed the project and Terra-Gen Operating Co-Hybrid operates it. In January 2024, Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in ES1B from Terra-Gen. Mortenson served as full EPC contractor for the Edwards Sanborn solar and storage project, which reached full commercial operations in 2024 after phased commissioning. — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Description: Edwards Sanborn E1B is an operational solar-and-battery power plant in Kern County, California, with EIA plant ID 65674 and 290.4 MW of listed nameplate capacity. Terra-Gen developed the project and Terra-Gen Operating Co-Hybrid operates it. In January 2024, Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in ES1B from Terra-Gen. Mortenson served as full EPC contractor for the Edwards Sanborn solar and storage project, which reached full commercial operations in 2024 after phased commissioning. — Edwards & Sanborn Solar + Energy Storage | Mortenson · confidence: medium
- Description: Edwards Sanborn E1B is an operational solar-and-battery power plant in Kern County, California, with EIA plant ID 65674 and 290.4 MW of listed nameplate capacity. Terra-Gen developed the project and Terra-Gen Operating Co-Hybrid operates it. In January 2024, Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in ES1B from Terra-Gen. Mortenson served as full EPC contractor for the Edwards Sanborn solar and storage project, which reached full commercial operations in 2024 after phased commissioning. — Edwards Sanborn 1B - Terra-Gen · confidence: medium
- Financing summary: On 2022-09-16, Terra-Gen announced completion of $959 million of senior secured credit facilities for the second phase associated with Edwards Sanborn 1B: a $460 million construction and term loan, a $403 million tax-equity bridge facility, and a $96 million construction and revolving letter-of-credit facility. U.S. Bank provided the tax-equity commitment; BNP Paribas, CoBank, ING, and Nomura Securities led the construction and term financing. This financing amount is distinct from the January 2024 sale or acquisition consideration, which was not disclosed. — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: medium
- Financing summary: On 2022-09-16, Terra-Gen announced completion of $959 million of senior secured credit facilities for the second phase associated with Edwards Sanborn 1B: a $460 million construction and term loan, a $403 million tax-equity bridge facility, and a $96 million construction and revolving letter-of-credit facility. U.S. Bank provided the tax-equity commitment; BNP Paribas, CoBank, ING, and Nomura Securities led the construction and term financing. This financing amount is distinct from the January 2024 sale or acquisition consideration, which was not disclosed. — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Timeline: [{"event":"Interconnection agreement executed","date":"2020-11-10","detail":"The Edwards Sanborn large generator interconnection agreement covered Edwards Solar 1B, Southern California Edison, and CAISO; the execution records show November 10, 2020 signatures."},{"event":"Construction commenced","date":"2021","detail":"Site construction for the Edwards & Sanborn solar-plus-storage project commenced in the first quarter of 2021."},{"event":"Second-phase project financing closed","date":"2022-09-16","detail":"Terra-Gen completed $959 million of senior secured financing for the second phase, including construction debt, a tax-equity bridge, and a construction/revolving letter-of-credit facility."},{"event":"Initial commercial operation reported","date":"2022-10-31","detail":"An EIA-derived plant record reports October 31, 2022 as the commercial-operation date for the solar plant record associated with Edwards Sanborn E1B."},{"event":"Substantial completion","date":"2023","detail":"Mortenson reports that the Edwards & Sanborn project reached substantial completion in 2023."},{"event":"50% interest acquisition from predecessor owner","date":"2024-01-11","detail":"Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in Edwards Sanborn 1B from Terra-Gen. The public announcement did not disclose sale consideration."},{"event":"Full commercial operations","date":"2024","detail":"Terra-Gen reports that Edwards Sanborn 1B was commissioned in phases and reached full commercial operations in 2024; Mortenson lists January 2024 as project completion."}] — Edwards & Sanborn Solar + Energy Storage | Mortenson · confidence: medium
- Timeline: [{"event":"Interconnection agreement executed","date":"2020-11-10","detail":"The Edwards Sanborn large generator interconnection agreement covered Edwards Solar 1B, Southern California Edison, and CAISO; the execution records show November 10, 2020 signatures."},{"event":"Construction commenced","date":"2021","detail":"Site construction for the Edwards & Sanborn solar-plus-storage project commenced in the first quarter of 2021."},{"event":"Second-phase project financing closed","date":"2022-09-16","detail":"Terra-Gen completed $959 million of senior secured financing for the second phase, including construction debt, a tax-equity bridge, and a construction/revolving letter-of-credit facility."},{"event":"Initial commercial operation reported","date":"2022-10-31","detail":"An EIA-derived plant record reports October 31, 2022 as the commercial-operation date for the solar plant record associated with Edwards Sanborn E1B."},{"event":"Substantial completion","date":"2023","detail":"Mortenson reports that the Edwards & Sanborn project reached substantial completion in 2023."},{"event":"50% interest acquisition from predecessor owner","date":"2024-01-11","detail":"Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in Edwards Sanborn 1B from Terra-Gen. The public announcement did not disclose sale consideration."},{"event":"Full commercial operations","date":"2024","detail":"Terra-Gen reports that Edwards Sanborn 1B was commissioned in phases and reached full commercial operations in 2024; Mortenson lists January 2024 as project completion."}] — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: medium
- Timeline: [{"event":"Interconnection agreement executed","date":"2020-11-10","detail":"The Edwards Sanborn large generator interconnection agreement covered Edwards Solar 1B, Southern California Edison, and CAISO; the execution records show November 10, 2020 signatures."},{"event":"Construction commenced","date":"2021","detail":"Site construction for the Edwards & Sanborn solar-plus-storage project commenced in the first quarter of 2021."},{"event":"Second-phase project financing closed","date":"2022-09-16","detail":"Terra-Gen completed $959 million of senior secured financing for the second phase, including construction debt, a tax-equity bridge, and a construction/revolving letter-of-credit facility."},{"event":"Initial commercial operation reported","date":"2022-10-31","detail":"An EIA-derived plant record reports October 31, 2022 as the commercial-operation date for the solar plant record associated with Edwards Sanborn E1B."},{"event":"Substantial completion","date":"2023","detail":"Mortenson reports that the Edwards & Sanborn project reached substantial completion in 2023."},{"event":"50% interest acquisition from predecessor owner","date":"2024-01-11","detail":"Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in Edwards Sanborn 1B from Terra-Gen. The public announcement did not disclose sale consideration."},{"event":"Full commercial operations","date":"2024","detail":"Terra-Gen reports that Edwards Sanborn 1B was commissioned in phases and reached full commercial operations in 2024; Mortenson lists January 2024 as project completion."}] — JANUARY 11, 2024 - AXIUM INFRASTRUCTURE INVESTS IN PHASE 1B OF THE EDWARDS SANBORN SOLAR STORAGE FACILITY – Axium Infrastructure · confidence: medium
- Timeline: [{"event":"Interconnection agreement executed","date":"2020-11-10","detail":"The Edwards Sanborn large generator interconnection agreement covered Edwards Solar 1B, Southern California Edison, and CAISO; the execution records show November 10, 2020 signatures."},{"event":"Construction commenced","date":"2021","detail":"Site construction for the Edwards & Sanborn solar-plus-storage project commenced in the first quarter of 2021."},{"event":"Second-phase project financing closed","date":"2022-09-16","detail":"Terra-Gen completed $959 million of senior secured financing for the second phase, including construction debt, a tax-equity bridge, and a construction/revolving letter-of-credit facility."},{"event":"Initial commercial operation reported","date":"2022-10-31","detail":"An EIA-derived plant record reports October 31, 2022 as the commercial-operation date for the solar plant record associated with Edwards Sanborn E1B."},{"event":"Substantial completion","date":"2023","detail":"Mortenson reports that the Edwards & Sanborn project reached substantial completion in 2023."},{"event":"50% interest acquisition from predecessor owner","date":"2024-01-11","detail":"Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% interest in Edwards Sanborn 1B from Terra-Gen. The public announcement did not disclose sale consideration."},{"event":"Full commercial operations","date":"2024","detail":"Terra-Gen reports that Edwards Sanborn 1B was commissioned in phases and reached full commercial operations in 2024; Mortenson lists January 2024 as project completion."}] — Edwards Sanborn 1B - Terra-Gen · confidence: medium
- Commercial parties.1: {"relationship":"Operator","name":"Terra-Gen Operating Co-Hybrid","detail":"Listed as the operator of EIA plant 65674, Edwards Sanborn E1B.","official_url":"https://terra-gen.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Commercial parties.4: {"relationship":"Co-investor","name":"Limited partner and co-investor","detail":"Participated with Axium Infrastructure in acquiring the 50% interest in ES1B; the public announcement did not identify the party by name.","official_url":null} — Edwards & Sanborn Solar + Energy Storage | Mortenson · confidence: medium
- Commercial parties.5: {"relationship":"Engineering, procurement, and construction contractor","name":"Mortenson","detail":"Served as the full EPC contractor for both the solar and energy-storage scopes of the Edwards & Sanborn project.","official_url":"https://www.mortenson.com/"} — Edwards & Sanborn: US's Largest Solar Storage Project | Coffman Engineers · confidence: medium
- Commercial parties.9: {"relationship":"Tax-equity provider","name":"U.S. Bank","detail":"Provided the tax-equity commitment for the second-phase Edwards Sanborn financing.","official_url":"https://www.usbank.com/"} — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: high
- Commercial parties.10: {"relationship":"Construction and term-financing lead","name":"BNP Paribas","detail":"Led construction and term financing for the $959 million second-phase facility.","official_url":"https://group.bnpparibas/en/"} — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: high
- Commercial parties.11: {"relationship":"Construction and term-financing lead","name":"CoBank","detail":"Led construction and term financing for the $959 million second-phase facility.","official_url":"https://www.cobank.com/"} — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: high
- Commercial parties.12: {"relationship":"Construction and term-financing lead","name":"ING","detail":"Led construction and term financing for the $959 million second-phase facility.","official_url":"https://www.ing.com/"} — Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California · confidence: high
- Commercial parties.13: {"relationship":"Construction and term-financing lead","name":"Nomura Securities","detail":"Led construction and term financing for the $959 million second-phase facility.","official_url":"https://www.nomura.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: high
- Commercial parties.14: {"relationship":"Acquisition financial advisor","name":"Citi","detail":"Served as Axium Infrastructure's exclusive financial advisor for the ES1B acquisition transaction.","official_url":"https://www.citigroup.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: high
- Commercial parties.15: {"relationship":"Sale financial advisor","name":"BofA Securities","detail":"Served as Terra-Gen's exclusive financial advisor for the ES1B transaction.","official_url":"https://www.bankofamerica.com/"} — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Royalty financing detail: Axium Infrastructure, together with a limited partner and co-investor, acquired a 50% ownership interest in the Edwards Sanborn 1B solar-plus-storage facility; this was an ownership-stake transfer, not a sale of the entire plant. — Source · confidence: medium
- Acquisition date: 2024-01 — Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen · confidence: medium
- Ownership interest pct: 50 — Source · confidence: high
- Acquirer: Axium Infrastructure, together with a limited partner and co-investor — Source · confidence: medium
- Transaction scope: ownership_stake — Source · confidence: high

## Timeline

- 2020-11-10 — Interconnection agreement executed
  The Edwards Sanborn large generator interconnection agreement covered Edwards Solar 1B, Southern California Edison, and CAISO; the execution records show November 10, 2020 signatures.
  Source: Source (https://sanjosecleanenergy.org/wp-content/uploads/2021/02/Terra-Gen.Edwards.LGIA_.PUBLIC.pdf)
- 2021 — Construction commenced
  Site construction for the Edwards & Sanborn solar-plus-storage project commenced in the first quarter of 2021.
  Source: Edwards & Sanborn Solar + Energy Storage | Mortenson (https://www.mortenson.com/projects/edwards-sanborn-solar-plus-storage)
- 2022-09-16 — Second-phase project financing closed
  Terra-Gen completed $959 million of senior secured financing for the second phase, including construction debt, a tax-equity bridge, and a construction/revolving letter-of-credit facility.
  Source: Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California (https://www.prnewswire.com/news-releases/terra-gen-closes-financing-for-second-phase-of-edwards-sanborn-solar-storage-franchise-in-california-301625979.html)
- 2023 — Substantial completion
  Mortenson reports that the Edwards & Sanborn project reached substantial completion in 2023.
  Source: Edwards & Sanborn Solar + Energy Storage | Mortenson (https://www.mortenson.com/projects/edwards-sanborn-solar-plus-storage)

## Sources

- [Axium Infrastructure Invests In Phase 1B Of The Edwards Sanborn Solar Storage Facility - Terra-Gen](https://terra-gen.com/axium-infrastructure-invests-in-phase-1b-of-the-edwards-sanborn-solar-storage-facility/) — terra-gen.com · tier other
- [Source](https://api.eia.gov/v2/electricity/operating-generator-capacity/data/?api_key=DEMO_KEY&facets[plantid][]=65674&data[0]=nameplate-capacity-mw&data[1]=net-summer-capacity-mw&data[2]=net-winter-capacity-mw&data[3]=operating-year-month&frequency=monthly&start=2026-01&end=2026-01&length=100&sort[0][column]=generatorid&sort[0][direction]=asc) — api.eia.gov · tier regulatory
- [NRI](https://www.caiso.com/documents/fullnetworkmodel_workscope_db22m3.xlsx) — caiso.com · tier other
- [Resource category and phase](https://www.caiso.com/documents/resourcecategoryandphaseallparticipatingresourceids.xlsx) — caiso.com · tier other
- [Source](https://sanjosecleanenergy.org/wp-content/uploads/2021/02/Terra-Gen.Edwards.LGIA_.PUBLIC.pdf) — sanjosecleanenergy.org · tier other
- [Edwards Sanborn 1B - Terra-Gen](https://terra-gen.com/terragen_project/edwards-sanborn-1b) — terra-gen.com · tier other
- [Edwards & Sanborn Solar + Energy Storage | Mortenson](https://www.mortenson.com/projects/edwards-sanborn-solar-plus-storage) — mortenson.com · tier other
- [Edwards & Sanborn: US's Largest Solar Storage Project | Coffman Engineers](https://www.coffman.com/news/edwards-sanborn-solar-energy-storage/) — coffman.com · tier other
- [Edwards Sanborn (Edsan) Solar Storage Phase 1A & 1B](https://terra-gen.com/edwards-sanborn/) — terra-gen.com · tier other
- [Edwards Sanborn 1B - Terra-Gen](https://terra-gen.com/terragen_project/edwards-sanborn-1b/) — terra-gen.com · tier other
- [Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California - Terra-Gen](https://terra-gen.com/news-release-1/) — terra-gen.com · tier other
- [Edwards Sanborn Solar Storage](https://terra-gen.com/wp-content/uploads/2026/04/20260421-Edwards-Sanborn-Solar-Storage.pdf) — terra-gen.com · tier other
- [HEM](https://power-electronics.com/en/solar/hem) — power-electronics.com · tier other
- [Q4 2023 - Solar power—and battery storage—take off at Edwards Air Force Base : BackIssues, altenerG.com - enerG Alternative Sources Magazine - enerG,Archives](https://www.altenerg.com/back_issues/story.php?sid=3125) — altenerg.com · tier other
- [Series 6 Family](https://www.firstsolar.com/en/Products/Series-6) — firstsolar.com · tier other
- [Terra-Gen Closes Financing for Second Phase of Edwards Sanborn Solar Storage Franchise in California](https://www.prnewswire.com/news-releases/terra-gen-closes-financing-for-second-phase-of-edwards-sanborn-solar-storage-franchise-in-california-301625979.html) — prnewswire.com · tier other
- [JANUARY 11, 2024 - AXIUM INFRASTRUCTURE INVESTS IN PHASE 1B OF THE EDWARDS SANBORN SOLAR STORAGE FACILITY – Axium Infrastructure](https://www.axiuminfra.com/2024/01/12/january-11-2024-axium-infrastructure-invests-in-phase-1b-of-the-edwards-sanborn-solar-storage-facility/?lang=en) — axiuminfra.com · tier other
- [Source](https://terra-gen.com/axium-infrastructure-invests-in-phase-1b-of-the-edwards-sanborn-solar-storage-facility) — terra-gen.com · tier other
- [Batteries start to rival gas on California's electricity grid](https://english.elpais.com/economy-and-business/2024-08-25/batteries-start-to-rival-gas-on-californias-electricity-grid.html) — english.elpais.com · tier other

## Data quality

- Published capacity figures vary by scope and measurement: the EIA-derived plant record identifies E1B as a 290.4 MW solar-and-battery plant, while Terra-Gen and project contractors publish larger phase or combined-development figures. The September 2022 $959 million amount was senior secured project financing for the second phase, not sale consideration. No retirement or repowering is reported through August 2, 2026.

---

Canonical page: https://askthegrid.com/assets/facilities/edwards-sanborn-e1b

Source: Ask the Grid — https://askthegrid.com/