# Evocative EWR1

PJM data center · https://askthegrid.com/assets/facilities/evocative-ewr1

Evocative EWR1 is a facility data center in Secaucus, Hudson, NJ. Evocative is identified as the operator. Spatial service-territory evidence associates the site with Public Service Electric & Gas (PSE&G); the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.

## Identity and location

- Operating status: unknown
- Asset scope: facility
- Location: 1 Enterprise Avenue North, Secaucus, Hudson County, NJ
- Operator: Evocative (exact asset) — https://evocative.com
- Utility: Public Service Electric & Gas (PSE&G) (exact asset) — https://www.pseg.com

## Power and grid context

- Energized power: 10 MW · reported · exact asset · as of 2022-09-29 — Evocative published 'CAPACITY 10 MW Total capacity' (feeds 2 × 5 MW)
- Utility service: 5 MW · reported · exact asset · as of 2022-09-29 — Feed size: 2 × 5 MW diverse underground feeds (per Evocative page); listed as individual feed capacity
- Utility service: 5 MW · reported · exact asset · as of 2022-09-29 — Feed size duplicate entry for the second 5 MW feed (Evocative states two 5 MW feeds)
- Onsite generation: 5.6 MW · reported · exact asset · as of 2022-09-29 — UPS capacity: 4 × 1.4 MW APC Symmetra UPS systems (sum = 5.6 MW). Listed as onsite UPS capacity (not to be conflated with generator or utility MW)
- Backup generation: 8 MW · reported · exact asset · as of 2022-09-29 — Generator nameplate: 4 × 2 MW diesel generators (4 × 2 MW = 8 MW) with N+1 configuration and 48 hours at 100% load (Evocative page)
- Interconnection request: 3 MW · reported · exact asset · as of 2026-09-04 — DC Hub / DCPI lists an Evocative EWR1 site capacity entry of 3 MW in its facility list (market index entry), presented as a market data point rather than Evocative's published capacity; treated here as a separate reported market figure
- ISO/RTO: PJM
- Balancing authority: PJM
- Electric utility: Public Service Electric & Gas (PSE&G)

## Development

- Site status: operating
- Site area: 7 acres
- Gross floor area: 105,000 square feet
- Construction: Data center with 105,000 sq ft, 10 MW capacity, built 2012, located at 1 Enterprise Avenue North, Secaucus, NJ.

## Compute and operations

- Facility classes: colocation, enterprise, cloud
- Workloads: high-performance computing, bare metal, cloud connectivity
- Operating context: Evocative EWR1 is a colocation‑focused data center offering secure, scalable colocation, enterprise bare‑metal, and managed services. It delivers high‑performance, reliable power (10 MW total capacity) with N+1 cooling and power redundancy, and provides extensive fiber connectivity to global carriers.

## Sources

- [http://baxtel.com/data-center/equinix-new-york-secaucus-ny2](http://baxtel.com/data-center/equinix-new-york-secaucus-ny2)
- [http://baxtel.com/data-center/evocative-secaucus-ewr1](http://baxtel.com/data-center/evocative-secaucus-ewr1)
- [http://datacentermap.com/usa/new-jersey/secaucus/evocative-ewr1/specs](http://datacentermap.com/usa/new-jersey/secaucus/evocative-ewr1/specs)
- [http://datacenters.com/evocative-new-jersey-ewr1](http://datacenters.com/evocative-new-jersey-ewr1)
- [http://en.wikipedia.org/wiki/Secaucus%2C_New_Jersey](http://en.wikipedia.org/wiki/Secaucus%2C_New_Jersey)
- [http://evocative.com/data-centers/secaucus-nj-data-center-ewr1](http://evocative.com/data-centers/secaucus-nj-data-center-ewr1)
- [http://evocative.com/resources/glossary/data-center-sustainability](http://evocative.com/resources/glossary/data-center-sustainability)
- [http://gfpropertiesgroup.com/industrial/enterprise-avenue-building](http://gfpropertiesgroup.com/industrial/enterprise-avenue-building)
- [http://godatacenters.com/data-centers/new-jersey/secaucus/evocative-ewr1-56e9889f](http://godatacenters.com/data-centers/new-jersey/secaucus/evocative-ewr1-56e9889f)
- [http://mapquest.com/us/new-jersey/evocative-ewr1-778261489](http://mapquest.com/us/new-jersey/evocative-ewr1-778261489)
- [Secaucus · DCPI 19.8 · Excess 21.1 · Constraint 50.8](https://dchub.cloud/dcpi/secaucus)
- [New Jersey Data Center (EWR1) - Evocative Data Centers](https://evocative.com/data-centers/secaucus-nj-data-center-ewr1/)
- [Navigating High-Density Computing Responsibly](https://evocative.com/resources/blog/next-gen-workloads-next-gen-efficiency-navigating-high-density-computing-responsibly/)
- [UPDATE:  Monday Fire At Evocative Data Center Facility In Secaucus Under Investigation | Hudson TV News](https://hudsontv.com/update-monday-fire-at-evocative-data-center-facility-in-secaucus-under-investigation/) — Hudson TV News · 2023-07-11

## Data quality

- Only one news article found; limited coverage; no community benefits reported.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---