# Fence Post Solar Hybrid Project, LLC

ERCOT asset profile · https://askthegrid.com/assets/facilities/fence-post-solar-hybrid-project-llc

Enel North America · Navarro County · ERCOT

Fence Post is a co-located solar-and-storage plant in Navarro County, Texas. EIA's May 2026 inventory reports 236 MWac / 300 MWdc of solar generation plus a separate 72 MW / 115 MWh battery system, with all three generator records dated September 2024. Enel uses a separate company project scope of 297 MW of solar and 86 MW of storage and announced the project operating in February 2024.

## Profile

- **Grid role:** Co-located utility-scale solar generation and battery storage in ERCOT.
- **Current EIA configuration:** 236 MWac / 300 MWdc solar plus 72 MW / 115 MWh battery storage.
- **Company project scope:** Enel reports 297 MW of solar and 86 MW of storage; these figures use a different scope from EIA.

## Metrics

- **Solar power:** 236 MWac — EIA May 2026
- **Solar DC rating:** 300 MWdc — EIA May 2026
- **Reported capacity:** 308 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Company storage scope:** 86 MW — Enel
- **Registry anchor:** Plant 66801 — Fence Post Solar Project, LLC

## Facts

- **Solar record:** 236 MWac / 300 MWdc — EIA May 2026 · confidence: high
- **Battery record:** 72 MW / 115 MWh — EIA May 2026 · confidence: high
- **Company project scope:** 297 MW solar / 86 MW storage — Enel · confidence: high

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.

---

Canonical page: https://askthegrid.com/assets/facilities/fence-post-solar-hybrid-project-llc
Website: [Enel Green Power](https://enelgreenpower.com/)
Profile published: 2026-07-17T03:34:16.039Z
Source: Ask the Grid — https://askthegrid.com/
